McEwen Mining Reports Record Production in 2014

 

TORONTO, ONTARIO - (January 15, 2015) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce Q4 and 2014 full-year production results.

 

·                  In Q4 2014, the Company produced a quarterly record of 27,412 gold oz and 973,417 silver oz.

 

·                  In 2014 the Company produced an annual record of 84,363 gold oz and 3,195,693 silver oz.

 

El Gallo 1, Mexico

 

·                 In Q4 2014, we produced a record of 14,068 gold oz and 13,422 silver oz.

 

·                  In Q4 2014, our mined gold grade increased 73% quarter-over-quarter to 1.93 gpt Au. This year we expect to be mining an average grade of 2.6 gpt Au.

 

·                  This year annual gold production is expected to increase 31% to 50,000 oz.

 

·                  This year all-in sustaining costs are expected to decrease to $750 per gold oz due to a one third decrease in crusher throughput and lower mining, blasting and cyanide costs.

 

San José, Argentina (49%)*

 

·                  Our attributable production from San José in Q4 was 13,344 gold oz and 959,995 silver oz.

 

·                  In 2015 the gold and silver grades are expected to increase slightly to 6.15 gpt and 414 gpt for the year, respectively.

 

·                  This year annual production is expected to be similar to 2014, with 46,500 gold oz and 3,100,000 silver oz.

 

·                  At the current silver to gold ratio of 75:1, we expect all-in sustaining costs in 2015 to be $1,225 per gold equivalent oz.

 

Production costs for 2014 will be released with year-end financials in early March 2015.

 

At December 31, 2014, McEwen Mining had cash and liquid assets of $18.3 million and no bank debt.

 

Due to the volatility in the silver-to-gold ratio, we have decided to highlight both gold and silver ounces for our production instead of on a gold-equivalent (gold eq.) basis. For reference our 2014 guidance of 135,000 — 140,000 gold eq. oz was based on a silver-to-gold ratio of 60:1. At that ratio, our production in 2014 was 137,625 gold eq oz.

 

GRAPHIC

 

1



 

GRAPHIC

 

McEwen Mining Operating Results

 

 

 

2015
Guidance

 

Full-Year
2014(1)

 

Full-Year
2013

 

Q4 2014(1)

 

Q4 2013

 

Corporate Total

 

 

 

 

 

 

 

 

 

 

 

Gold produced (oz)

 

96,500

 

84,363

 

79,158

 

27,412

 

20,686

 

Silver produced (oz)

 

3,120,000

 

3,195,693

 

3,135,468

 

973,417

 

857,011

 

 

 

 

 

 

 

 

 

 

 

 

 

San José — 100%

 

 

 

 

 

 

 

 

 

 

 

Ore production (tonnes)

 

550,000

 

571,018

 

536,937

 

152,689

 

156,150

 

Average grade gold (gpt)

 

6.15

 

5.77

 

6.42

 

6.19

 

6.03

 

Average head silver (gpt)

 

414

 

404

 

425

 

454

 

399

 

Average gold recovery (%)

 

87.0

 

88.8

 

89.2

 

89.6

 

87.6

 

Average silver recovery (%)

 

87.0

 

87.2

 

86.7

 

87.8

 

87.0

 

Gold produced (oz)

 

95,000

 

94,161

 

98,827

 

27,233

 

26,529

 

Silver produced (oz)

 

6,300,000

 

6,469,022

 

6,356,801

 

1,959,174

 

1,741,275

 

McEwen Mining — 49%*

 

 

 

 

 

 

 

 

 

 

 

Gold produced (oz)

 

46,500

 

46,139

 

48,425

 

13,344

 

12,999

 

Silver produced (oz)

 

3,100,000

 

3,169,821

 

3,114,833

 

959,995

 

853,225

 

 

 

 

 

 

 

 

 

 

 

 

 

El Gallo 1

 

 

 

 

 

 

 

 

 

 

 

Ore production (tonnes)

 

850,000

 

1,462,496

 

1,255,314

 

522,337

 

323,863

 

Average grade gold (gpt)

 

2.60

 

1.42

 

1.22

 

1.93

 

1.17

 

Gold produced (oz)

 

50,000

 

38,224

 

30,733

 

14,068

 

7,687

 

Silver produced (oz)

 

20,000

 

25,872

 

20,635

 

13,422

 

3,786

 

 


* The San José Mine is 49% owned by McEwen Mining and 51% owned and operated by Hochschild Mining.

1. Although believed by management to be accurate, information provided for production, tonnes and grades is preliminary and may consequently differ from final results expected to be disclosed in the Company’s forthcoming Form 10-K. Any differences are expected to be positive.

 

About McEwen Mining (www.mcewenmining.com)

 

The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by creating a profitable gold producer focused in the Americas. McEwen Mining’s principal assets consist of the San José Mine in Santa Cruz, Argentina (49% interest); the El Gallo complex in Sinaloa, Mexico; the Gold Bar project in Nevada, US; the Los Azules project in San Juan, Argentina. McEwen Mining has 305.2 million shares fully diluted at January 15, 2015. Rob McEwen, Chairman, and Chief Owner, owns 75,168,564 shares or approximately 25% of the Company.

 

RELIABILITY OF INFORMATION

 

Minera Santa Cruz S.A. (“MSC”), the owner of the San José mine, is responsible for and has supplied to the Company all reported results from the San José mine. McEwen Mining’s joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates other than MSC do not accept responsibility for the use of project data or the adequacy or accuracy of this release.

 

Technical Information

 

The technical contents of this news release has been reviewed and approved by William Faust PE, Chief Operating Officer and a Qualified Person as defined by Canadian Securities Administrator National Instrument

 

2



 

43-101 “Standards of Disclosure for Mineral Projects”.

 

Cautionary Note regarding Non-GAAP Measures

 

In this report, we have provided information prepared or calculated according to U.S. GAAP, as well as provided some non-U.S. GAAP (“non-GAAP”) performance measures.  Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies.

 

Total cash costs consist of mining, processing, on-site general and administrative costs, community and permitting costs related to current explorations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs.  All-in sustaining cash costs consist of total cash costs (as described above), plus environmental rehabilitation costs, mine site exploration and development costs, and sustaining capital expenditures. In order to arrive at our consolidated all-in sustaining costs, we also include corporate general and administrative expenses. Depreciation is excluded from both total cash costs and all-in sustaining cash costs.  Total cash cost and all-in sustaining cash cost per ounce sold are calculated on a co-product basis by dividing the respective proportionate share of the total cash costs and all-in sustaining cash costs for the period attributable to each metal by the ounces of each respective metal sold. We use and report these measures to provide additional information regarding operational efficiencies both on a consolidated and an individual mine basis, and believe these measures provide investors and analysts with useful information about our underlying costs of operations. A reconciliation to the nearest U.S. GAAP measure is provided in McEwen Mining’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2014.

 

Caution Concerning Forward-Looking Statements

 

There are significant risks and uncertainty associated with construction, commencing or expanding production or changing production plans without a current feasibility, pre-feasibility or scoping study. As such, El Gallo 1 may ultimately be determined to lack one or more geological, engineering, legal, operating, economic, social, environmental, and/or other relevant factors reasonably required to serve as the basis for the decision to complete the expansion of this project.

 

This news release contains certain forward-looking statements and information, including “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.’s (the “Company”) estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, technical, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social, technical and security risks associated with foreign operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, accuracy of production information and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new

 

3



 

information or events after the date hereof except as may be required by law. See McEwen Mining’s Annual Report on Form 10-K for the fiscal year ended December 31, 2013 and Quarterly Report on Form 10-Q for the quarter ended September 30, 2014 and other filings with the Securities and Exchange Commission, under the caption “Risk Factors”, for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

 

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.

 

For further information contact:

 

 

 

Sheena Scotland

Director, Investor Relations

Tel: (647) 258-0395 ext 410

Toll Free: (866) 441-0690

Fax: (647) 258-0408

 

Facebook: facebook.com/mcewenrob

Twitter: twitter.com/mcewenmining

Mailing Address

150 King St W, Suite 2800

P.O. Box 24

Toronto, ON M5H 1J9

E-mail: info@mcewenmining.com

 

4