Attached files

file filename
EX-23.9 - EXHIBIT 23.9 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-9.htm
EX-23.8 - EXHIBIT 23.8 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-8.htm
EX-23.7 - EXHIBIT 23.7 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-7.htm
EX-23.6 - EXHIBIT 23.6 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-6.htm
EX-23.4 - EXHIBIT 23.4 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-4.htm
EX-23.2 - EXHIBIT 23.2 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-2.htm
EX-23.1 - EXHIBIT 23.1 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-1.htm
EX-5.1 - EXHIBIT 5.1 - HYCROFT MINING HOLDING CORPtm2032319d1_ex5-1.htm
S-1MEF - S-1MEF - HYCROFT MINING HOLDING CORPtm2032319d1_s1mef.htm

EXHIBIT 23.5

 

Steven Newman (RM-SME)

Director, Feasibility Studies

Hycroft Mining Corporation

8181 East Tufts Ave., Suite 510

Denver, CO 80237

CONSENT OF THIRD-PARTY QUALIFIED PERSON

 

I, Steven Newman (RM-SME), in connection with the Registration Statement and any amendments or supplements and/or exhibits thereto (collectively, the Form S-1), consent to:

 

  the filing and use of the technical report summary titled “Hycroft Project, Technical Report Summary, Heap Leaching Feasibility Study, Winnemucca, Nevada, USA” (the “Technical Report”), with an effective date of July 31, 2019, as an exhibit to and referenced in the Form S-1;

 

  the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Form S-1 and any such Technical Report; and

  

  the information derived, summarized, quoted or referenced from the Technical Report, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form S-1.

 

I am a qualified person responsible for authoring, and this consent pertains to, the following Sections of the Technical Report:

 

  Section 3: Property Description and Location

 

  Section 4: Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

  Section 5: History

 

  Section 7.8: Geotechnical Rock Mass Characterization

 

  Section 12: Mineral Reserve Estimates

 

  Section 13: Mining Methods

 

  Section 16: Market Studies and Contracts

  

  Section 20: Adjacent Properties
     
  Section 21: Other Relevant Data and Information

 

  Corresponding Subsections of Section 1: Executive Summary

 

  Corresponding Subsections of Section 18: Capital and Operating Costs

 

  Corresponding Subsections of Section 22: Interpretation and Conclusions

 

  Corresponding Subsections of Section 23: Recommendations

 

   
October 1, 2020  
   
/s/ Steven Newman  
Signature of Authorized Person  
   
Steven Newman (RM-SME)  
Print name of Authorized Person