Attached files

file filename
EX-23.9 - EXHIBIT 23.9 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-9.htm
EX-23.8 - EXHIBIT 23.8 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-8.htm
EX-23.7 - EXHIBIT 23.7 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-7.htm
EX-23.6 - EXHIBIT 23.6 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-6.htm
EX-23.5 - EXHIBIT 23.5 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-5.htm
EX-23.2 - EXHIBIT 23.2 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-2.htm
EX-23.1 - EXHIBIT 23.1 - HYCROFT MINING HOLDING CORPtm2032319d1_ex23-1.htm
EX-5.1 - EXHIBIT 5.1 - HYCROFT MINING HOLDING CORPtm2032319d1_ex5-1.htm
S-1MEF - S-1MEF - HYCROFT MINING HOLDING CORPtm2032319d1_s1mef.htm

EXHIBIT 23.4

 

M3 Engineering & Technology Corporation

2051 W. Sunset Road, Ste. 101

Tucson, Arizona 85707

CONSENT OF THIRD-PARTY QUALIFIED PERSON

 

M3 Engineering & Technology Corporation (“M3”), in connection with the Registration Statement and any amendments or supplements and/or exhibits thereto (collectively, the Form S-1), consent to:

 

  the filing and use of the technical report summary titled “Hycroft Project, Technical Report Summary, Heap Leaching Feasibility Study, Winnemucca, Nevada, USA” (the “Technical Report”), with an effective date of July 31, 2019, as an exhibit to and referenced in the Form S-1;

 

  the use of and references to our name, including our status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Form S-1 and any such Technical Report; and

 

  the information derived, summarized, quoted or referenced from the Technical Report, or portions thereof, that was prepared by us, that we supervised the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form S-1.

 

M3 is responsible for authoring, and this consent pertains to, the following Sections of the Technical Report:

 

  Section 2: Introduction

 

  Section 10: Mineral Processing and Metallurgical Testing

 

  Section 14: Recovery Methods

 

  Section 15: Project Infrastructure

 

  Section 19: Economic Analysis

 

  Section 24: References

 

  Section 25: Reliance on Other Experts

 

  Corresponding Subsections of Section 1: Executive Summary
     
  Corresponding Subsections of Section 18: Capital and Operating Costs

 

  Corresponding Subsections of Section 22: Interpretation and Conclusions

 

  Corresponding Subsections of Section 23: Recommendations

 

   
October 1, 2020  
   
/s/ Art Ibrado  
Signature of Authorized person for  
M3 Engineering & Technology Corporation, a Qualified Third-Party Firm  
   
Art Ibrado, P.E.  
Print name of Authorized Person for  
M3 Engineering & Technology Corporation, a Qualified Third-Party Firm