Allied Nevada Reports Increases to Proven & Probable Mineral Reserves to 12.7

Million Ounces of Gold and 481.9 Million Ounces of Silver

Measured & Indicated Minerals Resources Increase to 8.2 Million Ounces of Gold and 236.9 Million

Ounces of Silver

February 23, 2012 | Reno, Nevada – Allied Nevada Gold Corp. (“Allied Nevada” or the “Company”) (TSX: ANV; NYSE-Amex: ANV) is pleased that its infill program at Hycroft, along with additional engineering studies, successfully upgraded 2.5 million ounces of gold and 93.3 million ounces of silver to the proven and probable mineral reserve categories. Total proven and probable mineral reserves on December 31, 2011 were 12.7 million ounces of gold and 481.9 million ounces of silver, representing a 24% increase to both gold and silver contained ounces compared with the June 30, 20111 reserve estimate.

“We have successfully extended the mine life by continuing to focus our efforts on upgrading the resources at Hycroft,” comments Scott Caldwell, President and CEO. “In 2012, drilling at Hycroft will be directed towards continuing to develop the current resource area as well as step out targets on the greater Hycroft property. We believe Hycroft is a world-class deposit that will sustain a long-life, low-cost production profile with significant regional potential.”

Measured and indicated mineral resources (exclusive of reserve) at year end 2011 were 8.2 million ounces of gold and 236.9 million ounces of silver, an increase of 21% and 16%, respectively, compared with the June 30, 2011 resource estimate.

The metals prices used in estimating resources at December 31, 2011 of $800 per ounce for gold and $14 per ounce for silver did not change from resource estimates in 2010. Gold equivalent cut-off grades have decreased slightly to 0.004 ounces per ton (“opt”) for heap leach material, 0.01 opt for mill material reflecting increases in recoveries used in the model compared with the previous resource estimate. This cut-off grade strategy has been applied to both the mineral reserve and resource estimates.

The Company completed a metal price sensitivity analysis estimating ounces mined using Whittle cones, hypothetical mining pits created using the block model and applying metallurgical recoveries and basic economics such as metal prices and costs. The results of this analysis are as follows:

 

Metal Prices     Total Tons     Waste Tons     Total Contained Ounces (000s)  
Au     Ag     (000s)     (000s)     Au     Ag  
$ 400      $ 7        129,260        58,345        1,160        64,405   
$ 600      $ 11        1,600,978        951,999        8,073        351,988   
$ 800      $ 14        2,561,305        1,426,636        12,651        481,881   
$ 1,000      $ 18        4,072,112        1,974,611        20,490        721,335   
$ 1,100      $ 19        4,316,917        2,012,218        21,731        757,375   
$ 1,200      $ 21        4,497,023        2,007,042        22,673        786,313   
$ 1,400      $ 25        4,874,219        2,066,819        24,064        834,987   
$ 1,600      $ 28        5,104,468        2,043,782        24,935        867,701   
$ 1,800      $ 32        5,304,724        2,011,334        25,568        896,850   
$ 2,000      $ 35        5,696,406        2,122,481        26,362        930,344   

 

 

1 

See press release dated August 23, 2011 on www.alliednevada.com for more information regarding the June 30, 2011 resource estimate.


This sensitivity analysis assumes a constant silver to gold price ratio of 57.14:1. The $800 per ounce of gold and $14 per ounce of silver line (bold and highlighted) reflects our current reserve estimate. The $1,200 per ounce gold price line (highlighted) hypothetically represents potentially mineable material, assuming a trailing 3-year average gold price of $1,256 per ounce.

 

December 31, 2011 – Summary Mineral Reserve & Resource Estimate

Proven & Probable Mineral Reserves

 

    
     Tons      Grades      Contained Ounces (000s)  
     (000s)      Au      Ag      AuEq      Au      Ag      AuEq  

Proven Heap Leach

     249,214         0.008         0.24         0.012         1,903         60,138         2,955   

Probable Heap Leach

     89,450         0.006         0.25         0.011         578         22,155         966   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Proven & Probable Heap Leach

     338,664         0.007         0.24         0.012         2,481         82,293         3,921   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Proven Mill – Transitional

     174,947         0.015         0.51         0.024         2,607         89,187         4,168   

           – Sulfide

     472,036         0.012         0.53         0.021         5,719         248,931         10,076   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Proven Mill

     646,983         0.013         0.52         0.022         8,326         338,118         14,244   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Probable Mill – Transitional

     33,977         0.012         0.54         0.022         413         18,357         735   

              – Sulfide

     115,046         0.012         0.37         0.019         1,431         43,112         2,185   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Probable Mill

     149,023         0.012         0.41         0.020         1,844         61,469         2,920   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Proven & Probable Mill

     796,006         0.013         0.50         0.022         10,170         399,587         17,164   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

TOTAL PROVEN & PROBABLE MINERAL RESERVES

     1,134,669         0.011         0.42         0.019         12,651         481,881         21,084   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Waste

     1,426,636                     
  

 

 

                   

Total Tons

     2,561,305                     
  

 

 

                   

Strip Ratio

     1.26                     
  

 

 

                   

Measured & Indicated Mineral Resources (exclusive of Mineral Reserves)

 

     Tons      Grades      Contained Ounces (000s)  
     (000s)      Au      Ag      AuEq      Au      Ag      AuEq  

Measured Heap Leach

     169,392         0.005         0.17         0.008         819         29,343         1,332   

Indicated Heap Leach

     170,681         0.004         0.17         0.007         711         29,857         1,234   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Measured & Indicated Heap Leach

     340,073         0.004         0.17         0.007         1,530         59,200         2,566   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Measured Mill – Transitional

     38,273         0.011         0.52         0.020         403         19,924         752   

                – Sulfide

     271,617         0.011         0.31         0.016         3,005         83,752         4,471   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Measured Mill

     309,890         0.011         0.33         0.017         3,408         103,676         5,223   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Indicated Mill – Transitional

     26,119         0.009         0.52         0.018         243         13,632         481   

              – Sulfide

     263,537         0.011         0.23         0.015         2,989         60,344         4,045   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Indicated Mill

     289,656         0.011         0.26         0.016         3,232         73,975         4,526   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Measured & Indicated Mill

     599,546         0.011         0.30         0.016         6,640         177,651         9,749   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

TOTAL MEASURED & INDICATED MINERAL RESOURCES

     939,619         0.009         0.25         0.013         8,170         236,851         12,315   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

LOGO    2011 Year End Hycroft Reserve & Resource Estimate | 2    


Inferred Mineral Resources

 

     Tons      Grades  
     (000s)      Au      Ag      AuEq  

Inferred Resource - In Reserve Pit

           

- Heap Leach

     28,226         0.006         0.26         0.011   

- Mill

     68,066         0.013         0.40         0.020   
  

 

 

    

 

 

    

 

 

    

 

 

 

Total inferred in reserve pit

     96,292         0.011         0.36         0.017   
  

 

 

    

 

 

    

 

 

    

 

 

 

Inferred Resource - Outside Reserve Pit

           

- Heap Leach

     34,425         0.005         0.442         0.012   

- Mill

     404,221         0.010         0.215         0.014   
  

 

 

    

 

 

    

 

 

    

 

 

 

Total inferred outside reserve pit

     438,646         0.010         0.23         0.014   
  

 

 

    

 

 

    

 

 

    

 

 

 

TOTAL INFERRED MINERAL RESOURCES

     534,938         0.010         0.253         0.0145   
  

 

 

    

 

 

    

 

 

    

 

 

 

NOTES TO THE DECEMBER 31, 2011, MINERAL RESERVE AND RESOURCE ESTIMATE

 

1. Scott Wilson of Scott E. Wilson Consulting, Inc. is a Certified Professional Geologist and member of the American Institute of Professional Geologists in Denver, Colorado, and is a Qualified Person as defined by NI 43-101. Mr. Wilson is the independent resource estimate consultant for Allied Nevada Gold Corp. and has supervised the preparation of the technical information contained in this press release.

 

2. Scott E. Wilson Consulting, Inc. has recommended an ordinary kriging estimate as the preferred method of determining the Mineral Resource estimate. Inferred Mineral Resource calculations are based on 25 foot drill hole composites of 5 foot sample intervals. All estimates are based on a block dimension of 50 feet long x 50 feet wide x 25 feet tall with the estimation parameters determined by variography.

 

3. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may also be materially affected by the inability to obtain required environmental and other regulatory approval or operating permits. The estimate may also be materially affected by global economic conditions such as the price of gold and silver, the price of oil and other commodities utilized in the production of gold and silver. Unknown geologic or hydrologic conditions or other unknown factors may materially affect the resource estimates.

 

4. A processing method and plant, different from that currently operating at the Hycroft Mine, and all associated regulatory approvals, are required to recover gold and silver from sulfide mineralization.

 

5. Gold equivalent cutoff grades were calculated using a gold price of $800 per ounce and a silver price of $14.00 per ounce for a gold to silver ratio of 57.14:1.

 

6. Estimates of Mineral Reserves and Resources may be materially affected by environmental permitting, legal and other relevant issues.

Cautionary Statement Regarding Forward Looking Information

This press release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933 and the U.S. Securities Exchange Act of 1934 (and the equivalent under Canadian securities laws), that are intended to be covered by the safe harbor created by such sections. Such forward-looking statements include, without limitation, statements regarding the Company’s expectation of the projected timing and outcome of engineering studies; the potential for confirming, upgrading and expanding gold and silver mineralized material at Hycroft; mineral reserve and resource estimates; estimates of gold and silver grades; and other statements that are not historical facts. Forward-looking statements address activities, events or developments that Allied Nevada expects or anticipates will or may occur in the future, and are based on current expectations and assumptions. Although Allied Nevada management believes that its expectations are based on reasonable assumptions, it can give no assurance that these expectations will prove correct. Important factors that could cause actual results to differ materially from those in the forward-looking statements include, among others, risks relating to risks that Allied Nevada’s acquisition, exploration and property advancement efforts will not be successful; risks relating to fluctuations in the price of gold and silver; the inherently hazardous nature of mining-related activities; uncertainties concerning reserve and resource estimates; availability of outside contractors in connection with Hycroft and other activities; uncertainties relating to obtaining approvals and permits from governmental regulatory authorities; and availability and timing of capital for financing the Company’s exploration and development activities, including uncertainty of being able to raise capital on favorable terms or at all; as well as those factors discussed in Allied Nevada’s filings with the U.S. Securities and Exchange Commission (the “SEC”) including Allied Nevada’s latest Annual Report on Form 10-K and its other SEC filings (and Canadian filings) including, without limitation, its latest Quarterly Report on Form 10-Q. The Company does not intend to publicly update any forward-looking statements, whether as a result of new information, future events, or otherwise, except as may be required under applicable securities laws.

Cautionary Note to U.S. Investors Regarding Estimates of Measured, Indicated and Inferred Mineral Resources

This press release uses the terms “measured”, “indicated” and “inferred” “mineral resources.” We advise U.S. investors that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot

 

LOGO    2011 Year End Hycroft Reserve & Resource Estimate | 3    


be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimates of “inferred mineral resources” may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute “reserves” as in-place tonnage and grade without reference to unit measures. The term “contained gold ounces” used in this press release is not permitted under the rules of the SEC. U.S. investors are cautioned not to assume that any part or all of a measured, indicated or inferred resource exists or is economically or legally mineable.

Mr. Scott E. Wilson, AIPG Certified Professional Geologist #10965, is Allied Nevada’s Independent Qualified Person as defined under National Instrument 43-101 (NI 43-101). He has supervised the preparation of the technical information and has reviewed and approved the contents of this news release. Allied Nevada will file on www.sedar.com a NI 43-101 compliant technical report within the time required by NI 43-101 guidelines encompassing the mineral reserve and resource discussed herein.

 

 

For further information on Allied Nevada, please contact:

 

Scott Caldwell    Tracey Thom   
President & CEO    Vice President, Investor Relations   
(775) 358-4455    (775) 789-0119   

or visit the Allied Nevada website at www.alliednevada.com

 

LOGO    2011 Year End Hycroft Reserve & Resource Estimate | 4