Attached files

file filename
EX-95 - EX-95 - JACOBS ENGINEERING GROUP INC /DE/jec-ex95_7.htm
EX-32.2 - EX-32.2 - JACOBS ENGINEERING GROUP INC /DE/jec-ex322_6.htm
EX-32.1 - EX-32.1 - JACOBS ENGINEERING GROUP INC /DE/jec-ex321_8.htm
EX-31.2 - EX-31.2 - JACOBS ENGINEERING GROUP INC /DE/jec-ex312_9.htm
EX-31.1 - EX-31.1 - JACOBS ENGINEERING GROUP INC /DE/jec-ex311_10.htm
EX-23 - EX-23 - JACOBS ENGINEERING GROUP INC /DE/jec-ex23_14.htm
EX-21 - EX-21 - JACOBS ENGINEERING GROUP INC /DE/jec-ex21_390.htm
EX-10.61 - EX-10.61 - JACOBS ENGINEERING GROUP INC /DE/jec-ex1061_413.htm

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 10-K

ANNUAL REPORT PURSUANT TO

SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended September 30, 2016                          Commission File No. 1-7463

 

Jacobs Engineering Group Inc.

 

Delaware

 

95-4081636

State of incorporation

 

IRS Employer

identification number

 

 

 

1999 Bryan Street, Suite 1200

Dallas, Texas 75201

 

(214) 583-8500

Address of principal executive offices

 

Telephone number (including area code)

 

Securities registered pursuant to Section 12(b) of the Act:

 

 

Title of Each Class

 

Name of Each Exchange on Which Registered

Common Stock, $1 par value

 

New York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act: None

 

Indicate by check-mark if the Registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act:      Yes      No

Indicate by check-mark if the Registrant is not required to file reports pursuant to Section 13 or 15(d) of the Act.      Yes      No

Indicate by check-mark whether the Registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.      Yes      No

Indicate by check-mark whether the Registrant: has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the Registrant was required to submit and post such files).      Yes -     No

Indicate by check-mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§229.405 of this chapter) is not contained herein, and will not be contained, to the best of the Registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.  

Indicate by check-mark whether the Registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See the definitions of “large accelerated filer”, “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer

 

 

Accelerated filer

 

 

 

 

 

 

 

 

Non-accelerated filer

 

 

Smaller reporting company

 

Indicate by check-mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Act)      Yes      No

There were 120,750,218 shares of common stock outstanding as of November 18, 2016. The aggregate market value of the Registrant’s common equity held by non-affiliates was approximately $5.3 billion as of April 1, 2016, based upon the last reported sales price on the New York Stock Exchange on that date.

 

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the Registrant’s definitive proxy statement to be issued in connection with its 2017 annual meeting of shareholders are incorporated by reference into Part III of this Annual Report on Form 10-K where indicated.

 

 

 

 


JACOBS ENGINEERING GROUP INC.

Fiscal 2016 Annual Report on Form 10-K

Table of Contents

 

Item

 

 

 

 

 

Page No.

Part I

 

 

 

 

 

 

 

 

Item 1.

 

Business

 

Page 3

 

 

Item 1A.

 

Risk Factors

 

Page 16

 

 

Item 1B.

 

Unresolved Staff Comments

 

Page 31

 

 

Item 2.

 

Properties

 

Page 31

 

 

Item 3.

 

Legal Proceedings

 

Page 31

 

 

Item 4.

 

Mine Safety Disclosure

 

Page 32

 

 

 

 

 

 

 

Part II

 

 

 

 

 

 

 

 

Item 5.

 

Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

 

Page 33

 

 

Item 6.

 

Selected Financial Data

 

Page 35

 

 

Item 7.

 

Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

Page 36

 

 

Item 7A.

 

Quantitative and Qualitative Disclosures About Market Risk

 

Page 51

 

 

Item 8.

 

Financial Statements and Supplementary Data

 

Page 51

 

 

Item 9.

 

Changes in and Disagreements With Accountants On Accounting and Financial Disclosure

 

Page 51

 

 

Item 9A.

 

Controls and Procedures

 

Page 51

 

 

Item 9B.

 

Other Information

 

Page 52

 

 

 

 

 

 

 

Part III

 

 

 

 

 

 

 

 

Item 10.

 

Directors, Executive Officers and Corporate Governance

 

Page 53

 

 

Item 11.

 

Executive Compensation

 

Page 53

 

 

Item 12.

 

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

 

Page 53

 

 

Item 13.

 

Certain Relationships and Related Transactions, and Director Independence

 

Page 54

 

 

Item 14.

 

Principal Accounting Fees and Services

 

Page 54

 

 

 

 

 

 

 

Part IV

 

 

 

 

 

 

 

 

Item 15.

 

Exhibits and Financial Statement Schedules

 

Page 55

 

 

 

 

Signatures

 

Page 60

 

 

Page 2


PART I

FORWARD-LOOKING STATEMENTS

In addition to historical information, this Annual Report on Form 10-K contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are statements that do not directly relate to any historical or current fact. When used herein, words such as "expects," "anticipates," "believes," "seeks," "estimates," "plans," "intends," “future,” “will,” “would,” “could,” “can,” “may,” and similar words are intended to identify forward-looking statements. You should not place undue reliance on these forward-looking statements. Although such statements are based on management’s current estimates and expectations and/or currently available competitive, financial, and economic data, forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause our actual results to differ materially from what may be inferred from the forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those listed and discussed in Item 1A— Risk Factors below. We undertake no obligation to release publicly any revisions or updates to any forward-looking statements. We encourage you to read carefully the risk factors described herein and in other documents we file from time to time with the United States Securities and Exchange Commission (the "SEC").

Unless the context otherwise requires, all references herein to "Jacobs" or the "Registrant" are to Jacobs Engineering Group Inc. and its predecessors, and references to the "Company", "we", "us" or "our" are to Jacobs Engineering Group Inc. and its consolidated subsidiaries.

 

 

 

 

Item 1.

BUSINESS

General Background Information

We are one of the largest technical professional services firms in the world. We provide a diverse range of technical, professional, and construction services to a large number of industrial, commercial, and governmental clients.

We focus our services on clients operating in the following industries and markets:

 

Oil and gas exploration, production, and refining;

 

Chemicals and polymers;

 

Programs for various national governments, including aerospace, defense, and environmental programs;

 

Buildings (including specialized buildings for clients operating in the fields of healthcare, education, and high technology; governmental complexes; other specialized civic and mission critical buildings, installations, and laboratories; and retail and commercial buildings);

 

Infrastructure and telecommunications;

 

Mining and minerals;

 

Pharmaceuticals and biotechnology;

 

Power;

 

Pulp and paper;

 

Technology and manufacturing; and,

 

Food and consumer products, among others.

We are headquartered in Dallas, Texas, USA, and provide our services through more than 200 offices located around the globe, primarily in North America, South America, Europe, the Middle East, India, Australia, Africa, and Asia.

How We Operate

The relationships we have with our clients drive our business. As a broad-based technical professional services firm, we offer a range of services to help our clients maintain a competitive edge in their respective markets. From feasibility studies to design, to engineering, to construction, to start-up and commissioning, and then to operations and maintenance, we

Page 3


customize our services to meet business and project goals. Our global network of professionals works with a multi-office approach in an effort to provide clients with the best, most economical project or program solutions.

We strive to provide client value through continuous improvement in our performance. We regularly monitor our clients' expectations, our project delivery protocols and system, and our operational performance. Tools such as our Jacobs Value Enhancing Practices, Global Standard Operating Procedures, project reviews, the Jacobs System to Ensure Project Success ("JSTEPS") and Safe Plans of Action ("SPAs") provide added value to our clients' projects. They also allow us to create performance improvement actions during the project execution. Through continuous improvement upon our performance, our tools, and our processes, we believe we can offer our clients superior value when they do business with us.

JacobsValue+ SM ("Value Plus") is an internal tool we use to document and quantify the actual value or savings we provide to our clients and their projects. Some of the benefits achieved through the Value Plus program include lower total installed cost, shorter schedule, and reduced life cycle cost. Value Plus is implemented at project initiation: a project goal is created, and cost-saving ideas are entered into the Value Plus database. When the Value Plus cycle is complete, the project team and client identify unique cost and/or schedule reductions for the project.

The Company’s Strategy

During fiscal 2016, we undertook a deep analysis of our current business and markets to determine where we had opportunities to improve and where we would invest our resources in the coming years to maximize our returns.  The corporate strategy developed from this analysis is supported by strategies for each line of business, focusing on how we would execute the strategy.  These strategies are being finalized, and are expected to be communicated to shareholders and the financial community at the Company’s Investor Day, to be held on December 1, 2016.

Employees and Safety

Our employees are our most important and valuable asset and, therefore, the prevention of job-related injuries is given top priority. It is the policy of the Company to provide and maintain a safe and healthy working environment and to follow operating practices that safeguard all employees and result in a more efficient operation.  BeyondZero®, the name of our program that promotes our culture of caring, moves beyond efforts to have an incident and injury-free safety performance. We implement a culture of caring where concern for employees' health, safety, and welfare extends outside the office walls, beyond the project site fences and into their homes, cars, and all the places where they interact with family, friends, and fellow employees.

Since Jacobs’ founding, the Company has been based on doing business honestly, ethically, and with the utmost integrity. Our culture, and our Code of Conduct which is signed annually by all employees, prescribe that everyone at the Company must adhere to Jacobs’ Core Values and ethical code, and comply with the laws that govern the Company’s activities worldwide. Our employees and business partners are expected to follow the highest principles of business conduct, integrity, and ethics as they carry out their responsibilities, and are guided by the following principles in carrying out their responsibilities: loyalty, compliance with applicable laws, observance of ethical standards, avoidance of conflicts of interest, and communication. We endeavor to deal fairly with our employees, customers, suppliers, and competitors, and to respect the policies and procedures of those outside the Company.

We strive to present a clear and consistent image of our Company to our clients, employees, shareholders, and business partners - regarding how we behave, how we communicate, how we look, and most importantly, how our promises to our clients are delivered - anywhere in the world. 

We accomplish this foremost through our core values, which allow us to behave as one company and unify us worldwide. By keeping our core values as a central focus of our Company, we are able to think the same way and arrive at similar conclusions, regardless of our physical location. Our core values are:

 

People are our greatest asset;

 

We are relationship-based; and

 

Profitable growth is an imperative.

The balance inherent in our core values is also evident in our approach to sustainability, which maintains an even balance among the people, the economics, and the environmental aspects of business. Jacobs is driven to continuously

Page 4


improve efficiency and reduce energy and resource use, practices that drive down costs and contribute to a lower impact on the environment. The Company adheres to the following seven sustainability principles:

 

Sustainable development is a corporate priority;

 

We seek broad, deep, differentiated capabilities and services;

 

Sustainable development is integrated into our business;

 

Training and education are important;

 

Our facilities and operations follow sustainable principles;

 

We contribute to the common effort for sustainability; and

 

We are open and transparent.

Applying the best, most efficient and effective sustainable solutions for clients worldwide, in all major industries in which our clients operate, allows us to make a significant contribution to a safe and sustainable future. Each year we issue a Sustainability Report that describes many of our efforts and accomplishments regarding environmental sustainability.

With respect to human resources, our goal is to establish an inclusive, diverse workplace that energizes the people who fuel our Company's growth. Although we are a large company with over 54,000 employees in over 25 countries, our employees are unified in their focus on superior value, safety, and ethical business practices regardless of the country in which they work, and employees frequently move around the system as they grow their careers.

How We Grow

Jacobs has grown significantly since its founding in 1947; both through organic growth and through strategic acquisitions, an important part of the Company’s growth strategy. We have acquired and integrated numerous companies over the years that have enhanced our capabilities, geographic reach, and offerings.

In terms of organic growth, our relationship-based business model is central to our sustained growth and profitability. We pursue the development of long-term relationships and alliances with our clients. By working with our clients on their capital programs, we increase our understanding of their overall business needs, as well as the unique technical requirements of their specific projects. This increased understanding enables us, we believe, to provide superior value to our clients. Our approach provides us with opportunities to market the services our clients are expected to need in the pre-design phase, such as master planning, permitting, or project finance options; in the design phase; and in the construction, post-start-up and commissioning phases of a facility, including operations and maintenance services.

Our relationships with clients also present ongoing opportunities to expand into adjacent markets. For example, clients operating in the mining and minerals market often have a need for our infrastructure and buildings capabilities. The same is true for clients operating in other markets.

We market our services to clients in a wide range of public, institutional, process, and industrial markets. We increase our opportunities through focused market diversity, and are able to price contracts competitively and enhance overall profitability while delivering additional value to our clients by integrating and bundling our services. In complex economic times, we have the ability to evolve along with market cycles worldwide. When opportunities decrease in a particular market or geography, other opportunities often increase. Because of our focused market diversity, we believe we are well positioned to address a wide range of opportunities across many markets and geographies, which helps us grow our business.

Page 5


The Role of Acquisitions and Strategic Investments in the Development Our Business

When we review acquisition targets, we are conscious of the effect the acquisition may have on our client base. We favor acquisitions that are aligned with our growth strategy, which targets enhancements of our market position and adding value to our customers and shareholders.  This will be done by (i) expanding into a new client market; (ii) enhancing the range of services we provide existing clients; and/or (iii) accessing new geographic areas in which our clients either already operate or plan to expand. By expanding into new geographic areas and adding to our existing technical and project management capabilities, we strive to position ourselves as a preferred, single-source provider of technical, professional, and construction services to our clients. The following is a brief description of some of our recent key acquisitions (in reverse chronological order):

 

On April 12, 2016, we acquired The Van Dyke Technology Group, Inc. (“Van Dyke”) headquartered in Columbia, Maryland.  Van Dyke provides advanced cybersecurity services and solutions designed to protect sensitive information within classified networks, with a focus on supporting the U.S. Intelligence Community.

 

On December 7, 2015, we acquired J.L Patterson & Associates (“JLP”) headquartered in Orange, California.  JLP is a consulting and professional services engineering firm specializing in rail planning, environmental permitting, design and construction management. It provides services to numerous public transit agencies and is a major provider of professional consulting services to Class 1 railroads across the U.S.

 

On March 31, 2015, we acquired Suzhou Hans Chemical Engineering Co. ("SHCE") headquartered in China. SHCE has two specialty Class A design licenses in China’s Chemical, Petrochemical and Pharmaceutical industries, which allow the firm to provide engineering design for all types of chemical projects in China irrespective of project size plus procurement and project management services for various projects in China. These combined resources enable Jacobs to offer customers in China a complete spectrum of services for all types of chemical and petrochemical projects.

 

On July 1, 2014, we acquired Federal Network Systems ("FNS"), a subsidiary of Verizon Communications headquartered in Ashburn, Virginia. FNS provides systems integration and communication, information technology and data security solutions for the global market, with a particular focus on supporting the Intelligence Community, the U.S. Department of Defense ("DoD"), and federal civilian customers. FNS designs, integrates, secures, operates and maintains highly complex, mission critical voice, data and video networks.

 

On February 7, 2014, we acquired Eagleton Engineering, LLC ("Eagleton") headquartered in Houston, Texas. The acquisition enhanced our capabilities in midstream and upstream pipeline engineering, design and field surveying services. Eagleton specializes in pipeline engineering, primarily providing professional services and resources to the oil, gas and petrochemical industries. The firm’s services cover the full life cycle of project planning and delivery, from conceptual studies and design to full turnkey engineering, procurement and construction solutions and operational support.

 

On December 24, 2014, we acquired the assets of FMHC Corporation ("FMHC"), headquartered in Chicago, Illinois. This acquisition enhances our ability to provide turnkey wireless communications site development, design, network deployment, construction, and related services to clients operating in the wireless telecommunications industry.

 

On December 20, 2013, we acquired Stobbarts Limited, a construction firm based in West Cumbria, United Kingdom. The acquisition enhanced our capabilities in nuclear, decommissioning, construction and civil engineering.

 

On December 13, 2013, we acquired Sinclair Knight Merz Management Pty Limited and Sinclair Knight Merz Holdings Limited (collectively, "SKM"), a provider of engineering, design, procurement, construction and project management services headquartered in Sydney, Australia. Due to its size and complexities, more information about the SKM acquisition is provided throughout this report.

 

On November 22, 2013, we acquired certain assets and liabilities of MARMAC Field Services, Inc. headquartered in Costa Mesa, California. The acquisition enhanced our capabilities in pipeline engineering and design services; both geographically and by adding additional capabilities to serve the utility and gas industries.

 

On October 18, 2013, we acquired a 45% interest in Guimar Engenharia, a privately held engineering services and project management/construction management ("PMCM") company based in Rio de Janeiro, Brazil. The acquisition represents Jacobs’ first significant investment in Brazil. Guimar has a broad client base and operations throughout Brazil, where it is a leading provider of PMCM services for clients in the pulp and paper, petroleum, chemicals, food and beverage, mining and minerals, building and infrastructure industries.

Page 6


 

On October 14, 2013, we acquired substantially all the assets and liabilities of the Trompeter Group headquartered in Detroit, Michigan. This acquisition enhances our capabilities in advanced engineering services, maintenance support, technical training services, and contingent workforce services to the automotive manufacturing industry.

 

On August 30, 2013, our South African joint venture, Jacobs Matasis (Proprietary) Limited, acquired Ilitha Projects and Ilitha Staffing. Ilitha Projects provides management and Engineering, Procurement, Construction and Management (“EPCM”) services to clients in a broad range of market sectors, including oil and gas, refining, chemicals, power, nuclear, marine mining, and metals. Ilitha Staffing supplies technical contract staff sourcing and management services with a strong emphasis on integration with the client’s culture and business practices.

 

Commencing on June 6, 2013, and through the end of fiscal 2015, we acquired further ownership interests in Consulting Engineering Services (India) Private Limited (“CES”), an infrastructure and civil engineering company headquartered in Delhi, India. As of the end of fiscal 2015, the Company's ownership interest in CES is 99.2%. CES provides a range of solutions in infrastructure development, planning, engineering, and construction management.

 

On May 28, 2013, we acquired Compass Technology Services, Inc. ("Compass"), headquartered in Atlanta, Georgia. Compass is a provider of telecommunications professional and field services in the Southeastern U.S. and enhances our capabilities in wireless telecommunications infrastructure design and construction.

 

In August 2012, we acquired a consulting project management business based in Sydney, Australia. The primary purpose of this acquisition was to expand our geographic presence and grow our infrastructure business in Australia.

 

In December 2011, we acquired Unique World Pty Ltd. ("Unique World"), headquartered in Sydney, Australia. Unique World is an information management and knowledge management consultancy specializing in enabling technologies such as collaboration, business process automation, business intelligence, intranets, and portals. Unique World expanded our capabilities in Australia to include such information technology ("IT") services, as well as expanding the client base to which we can offer these services.

 

In November 2011, we acquired KlingStubbins, Inc., a 500-person firm headquartered in Philadelphia, Pennsylvania with offices located throughout the U.S. and China. KlingStubbins provides professional services in the areas of architecture, engineering, interiors, planning, and landscape architecture. The markets served by KlingStubbins include corporate/commercial, governmental, science and technology, higher education, mission critical, and interiors.

After we complete an acquisition, we move quickly to integrate the newly acquired operations. We typically assign senior operations personnel to manage the overall integration process with assistance from our sales, accounting, legal, IT, human resources, and risk management departments. Although integrating newly acquired businesses can be very challenging, the assimilation process is critical in order to assure (i) an appropriate return is realized versus the cost of the acquisition (ii) that our global businesses processes and systems are properly deployed throughout the newly-acquired entities and (iii) that we can begin to leverage off the acquired talents, skills, and expertise to grow our business and help our clients execute their capital programs. Newly acquired businesses are generally not left as stand-alone entities within the Company’s internal reporting system. The businesses we acquire are typically folded in to existing operational organizations within the Company. For additional information regarding certain issues related to our acquisition strategy, please refer to Item 1A—  Risk Factors below.

Lines of Business

During the second quarter of fiscal 2016, we reorganized our operations around four global lines of business. This reorganization is intended to better serve our global clients, leverage our workforce, help streamline operations, and provide enhanced growth opportunities. The four global lines of business are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial. Each business unit has a president that reports directly to the Company's President & CEO. As part of the reorganization, certain support functions (i.e. Sales), which were managed centrally for many years, have been embedded in the lines of business and report to the respective line of business presidents. The costs of other support functions (e.g., accounting, legal, human resources, and information technology) and certain other activities (e.g., global insurance) are assigned or allocated to each new business unit using a rationale method of assignment/allocation, or will remain an element of corporate general and administrative expenses. In connection with the reorganization, the Company

Page 7


has significantly modified its cash incentive plan utilizing forecasted performance metrics aligned along the new lines of business.

 

Services

Our services fall into four broad categories: project services; process scientific, and systems consulting services; construction services; and operations and maintenance services.

 

Project Services

 

We employ the engineering, architecture, interiors, design, planning, and related disciplines necessary to design and engineer modern process plants, buildings, infrastructure projects, technology and manufacturing facilities, consumer products manufacturing facilities, power plants and stations, pulp and paper plants, and other facilities.

 

We are capable of providing our clients with a variety of value engineering services, including "safety in design". Through safety in design we integrate best practices, hazard analysis, and risk assessment methods early in the design phase of projects, taking those steps necessary to eliminate or mitigate injury and damage during the construction, start-up, testing and commissioning, and operations phases of a project.

 

In the area of construction management, we provide our clients with a wide range of services as an agent for our clients. We may act as program director, whereby we oversee, on the owner's behalf, the complete planning, design, and construction phases of the project. Alternatively, our services may be limited to providing construction consulting.

 

Project Services also includes planning, scheduling, procurement, estimating, cost engineering, project accounting,

project delivery (quality), safety, and all other key support services needed for complete cradle-to-grave project delivery.

 

Process, Scientific, and Systems Consulting Services

 

We employ the professional and technical skills and expertise with respect to a broad range of consulting services, including: performing pricing studies, market analyses, and financial projections necessary in determining the feasibility of a project; performing gasoline reformulation modeling; analyzing and evaluating layout and mechanical designs for complex processing plants; analyzing automation and control systems; analyzing, designing, and executing bio containment strategies; developing and performing process protocols with respect to the U.S. Food and Drug Administration-mandated qualification and validation requirements; and performing geological and metallurgical studies.

 

Also included in this service category are revenues relating to defense and aerospace-related programs. Such services typically are more technical and scientific in nature than other project services we provide, and may involve such tasks as supporting the development and testing of conventional weapons systems; weapons modeling and simulations; computer systems development, maintenance, and support; evaluation and testing of mission-critical control systems; aerospace, testing, and propulsion systems and facilities; cyber security and IT services; and other highly technical or scientific tasks.

 

Construction Services

 

In addition to the construction management services included under Project Services above, we provide traditional field construction services to private and public sector clients. We also provide modular construction consulting services. In the area of environmental remediation and restoration, we also provide environmental remedial construction services for a variety of public and private sector clients.

 

Historically, our field construction activities have been focused primarily on those construction projects for which we perform much of the related engineering and design work. By focusing our construction efforts in this way, we attempt to minimize the risks associated with constructing complex projects based on designs prepared by third parties. The financial risk to us of constructing complex assets based on designs prepared by third parties may be particularly significant on fixed-price contracts; though we ensure appropriate controls are in place to manage risk. However, we will pursue construction-

Page 8


only projects when we can negotiate pricing and other contract terms we deem acceptable and which we believe can result in a fair return for the degree of risk we assume.

 

Operations and Maintenance Services

 

Operations and Maintenance (“O&M”) refers to all of the tasks required to operate and maintain large, complex facilities on behalf of clients. We provide key management and support services over all aspects of the operations of a facility, including managing subcontractors and other on-site personnel. O&M also includes process plant maintenance services, which generally involves all tasks required to keep a process plant (typically a refinery or chemical plant) in day-to-day operation.

 

Within the aerospace and defense areas, O&M often requires us to provide the management and technical support services necessary to operate and maintain such sites as engine test facilities, weapons integration facilities, and high-tech simulation and verification centers. Such O&M contracts also frequently require us to provide facilities management and maintenance services, utilities operations and maintenance services, property management and disposition services, and construction support services.

 

Within the environmental area, O&M often includes engineering and technical support services as well as program management services necessary to remediate contaminated sites.

 

Although the gross profit margins we realize from O&M services are generally lower than those associated with the other services we provide, the costs to support maintenance activities are also generally lower. In addition, O&M services offer us an opportunity for long-term relationships with clients. This aspect of O&M services greatly reduces the selling costs in respect of such services.

 

 

The following table sets forth our revenues from each of our four service categories for each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Project Services

 

$

5,738,840

 

 

$

6,307,015

 

 

$

6,576,004

 

Process, Scientific, and Systems Consulting

 

 

852,329

 

 

 

1,188,418

 

 

 

758,957

 

Construction

 

 

3,258,890

 

 

 

3,291,823

 

 

 

4,138,729

 

Operations and Maintenance

 

 

1,114,098

 

 

 

1,327,576

 

 

 

1,221,467

 

Total

 

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

Segments

The services we provide fall into the following four lines of business (“LOB”): Aerospace &Technology, Buildings & Infrastructure, Industrial, and Petroleum & Chemicals, which are also the Company’s reportable segments.    

The following table sets forth our revenues from each LOB.  Prior period information has been restated to reflect the current period presentation (in thousands):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenues from External Customers:

 

 

 

 

 

 

 

 

 

 

 

      Aerospace & Technology

$

2,657,433

 

 

$

2,924,753

 

 

$

2,306,453

 

Buildings & Infrastructure

 

2,253,512

 

 

 

2,458,379

 

 

 

2,705,197

 

Industrial

 

2,793,713

 

 

 

2,517,571

 

 

 

2,956,391

 

Petroleum & Chemicals

 

3,259,499

 

 

 

4,214,129

 

 

 

4,727,116

 

Total

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

For additional information regarding our segments, including information about our financial results by segment and financial results by geography, see Note 15 — Segment Information of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K.

Page 9


Aerospace and Technology – We provide an in-depth range of scientific, engineering, construction, nuclear and technical support services to the aerospace, defense, technical and automotive industries in several countries. Long-term clients include the Ministry of Defence in the U.K., the UK Nuclear Decommissioning Authority, NASA, the Department of Defense (DoD), the U.S. Special Operations Command ("USSOCOM"), the US Intelligence community, and the Australian Department of Defence. Specific to NASA, one of our major government customers in the U.S., is our ability to design, build, operate, and maintain highly complex facilities relating to space systems, including test and evaluation facilities, launch facilities, and support infrastructure.  We provide environmental characterization and restoration services to commercial and government customers both in the US and UK. This includes designing, building and operating high hazard remediation systems including for radiologically contaminated media.

In addition, we design/build aerodynamic, climatic, altitude and acoustic facilities in support of the automotive industry, and are a provider of a wide range of services in the telecommunications market.

Our experience in the defense sector includes military systems acquisition management and strategic planning; operations and maintenance of test facilities and ranges; test and evaluation services in computer, laboratory, facility, and range environments; test facility computer systems instrumentation and diagnostics; and test facility design and build. We also provide systems engineering and integration of complex weapons and space systems, as well as hardware and software design of complex flight and ground systems.

We have provided advanced technology engineering services to the DoD for more than 50 years, and currently support major defense programs in the U.S. and internationally. We operate and maintain several DoD test centers and provide services and assist in the acquisition and development of systems and equipment for Special Operations Forces, as well as the development of biological, chemical, and nuclear detection and protection systems.

We maintain enterprise information systems for government and commercial clients worldwide, ranging from the operation of complex computational networks to the development and validation of specific software applications. We also support the DoD and the intelligence community in a number of information technology programs, including network design, integration, and support; command and control technology; development and maintenance of databases and customized applications; and cyber security solutions.

Buildings & Infrastructure – We provide services to transit, aviation, built environment, mission critical, rail, and civil construction projects throughout North America, Europe, India, the Middle East, Australia, and Asia.  Our representative clients include national government departments/agencies in the U.S., U.K., Australia, and Asia, state and local departments of transportation within the U.S., and private industry freight transport firms.

Typical projects include providing development/rehabilitation plans for highways, bridges, transit, tunnels, airports, railroads, intermodal facilities, and maritime or port projects. Our interdisciplinary teams can work independently or as an extension of the client’s staff.  We have experience with alternative financing methods, which have been used in Europe through the privatization of public infrastructure systems.

Our water infrastructure group aids emerging economies, which are investing heavily in water and wastewater systems, and governments in North America and Europe, which are addressing the challenges of drought and an aging infrastructure system.  We develop or rehabilitate critical water resource systems, water/wastewater conveyance systems, and flood defense projects.

We also plan, design, and construct buildings for a variety of clients and markets. We believe our global presence and understanding of contracting and delivery demands keep us well positioned to provide professional services worldwide. Our diversified client base encompasses both public and private sectors and relates primarily to institutional, commercial, government and corporate buildings, including projects at many of the world's leading medical and research centers, and universities. We focus our efforts and resources in two areas: where capital-spending initiatives drive demand, and where changes and advances in technology require innovative, value-adding solutions. We also provide integrated facility management services (sometimes through joint ventures with third parties) for which we assume responsibility for the ongoing operation and maintenance of entire commercial or industrial complexes on behalf of clients.

We have specific capabilities in energy and power, master planning, and commissioning of office headquarters, aviation facilities, mission-critical facilities, municipal and civic buildings, courts and correctional facilities, mixed-use and commercial centers, healthcare and education campuses, and recreational complexes.  For advanced technology clients, who require highly specialized buildings in the fields of medical research, nano science, biotechnology, and laser sciences, we

Page 10


offer total integrated design and construction management solutions.  We also have global capabilities in the pharma-bio, data center, government intelligence, corporate headquarters/interiors, and science and technology-based education markets. Our government building projects include large, multi-year programs in the U.S. and Europe supporting various U.S. and U.K. government agencies.

Industrial – We provide engineering, procurement, project management, construction, and on-site maintenance to our global clients in the Life Sciences, Mining & Minerals, Specialty Chemicals & Manufacturing and Field Services markets.  We provide our Life Sciences clients single-point consulting, engineering, procurement, construction management, and validation project delivery, enabling us to execute large capital programs on a single-responsibility basis. Typical projects in the life sciences sector include laboratories, research and development facilities, pilot plants, bulk active pharmaceutical ingredient production facilities, full-scale biotechnology production facilities, and tertiary manufacturing facilities.

We provide services relating to modular construction, as well as other consulting and strategic planning to help our clients complete capital projects faster and more efficiently.

In addition, we offer services in containment, barrier technology, locally controlled environments, building systems automation, and off-the-site design and fabrication of facility modules, as well as vaccine production and purification, and aseptic processing.

Our mining and minerals business targets the non-ferrous and ferrous metal markets, precious metals, energy minerals (uranium, coal, oil sands), and industrial and fertilizer minerals (borates, trona, phosphates and potash). We work with many resource companies undertaking new and existing facility upgrades, process plant and underground and surface material handling and infrastructure developments.

We offer project management, front-end studies, full engineering, procurement and construction management (EPCM) and EPC capabilities, and completions, commissioning and start-up services specializing in new plant construction, brownfield expansions, and sustaining capital and maintenance projects.  We are also able to deliver value to our mining clients by providing distinctive adjacent large infrastructure capabilities to support their mining operations.

We provide a wide range of specialty chemicals & manufacturing services and products to our global client base.   Our specialty chemicals areas are focused on sulfuric acids, synthetic chemicals, and manufactured equipment.  Our manufacturing business areas include the Food & Beverage, Consumer Products, and Pulp & Paper markets.

Our global Field Services unit supports construction and O&M across the company, and performs our direct hire services.

Our construction activities include both construction management services and traditional field construction services to our clients.  Historically, our field construction activities focused primarily on those construction projects where we perform much of the related engineering and design work.  However, we pursue construction-only projects when we can negotiate pricing and other contract terms we deem acceptable and which we believe can result in a fair return for the degree of risk we assume.

In our O&M business, we perform tasks required to operate and maintain large, complex facilities on behalf of clients.  We provide key management and support services over all aspects of the operations of a facility, including managing subcontractors and other on-site personnel.  O&M also includes process plant maintenance services, which generally involves all tasks required to keep a process plant (typically a refinery or chemical plant) in day-to-day operation.

 

Petroleum & Chemicals – We provide integrated delivery of complex projects for our Oil and Gas, Refining, and Petrochemicals clients.  Bridging the upstream, midstream and downstream industries, our services encompass consulting, engineering, procurement, construction, maintenance, and project management.  

We provide services relating to onshore and offshore oil and gas production facilities, including fixed and floating platforms and subsea tie-backs, as well as full field development solutions, including processing facilities, gathering systems, transmission pipelines and terminals.  Our heavy oil experience makes us a leader in upgrading, steam-assisted gravity drainage and in-situ oil sands projects.  We have developed modular well pad and central processing facility designs. We also provide fit-for-purpose and standardized designs in the onshore conventional and unconventional space, paying particular attention to water and environmental issues.

Page 11


In addition, we provide our refining customers with feasibility/economic studies, technology evaluation and conceptual engineering, front end loading (“FEED”), detailed engineering, procurement, construction, maintenance and commissioning services.  We deliver installed EPC solutions as to grass root plants, expansions and revamps of existing units.  Our focus is on both the inside the battery limit (“ISBL”) processing units as well as utilities and offsites.  We have engineering alliances and maintenance programs that span decades with core clients.  With the objective of driving our clients’ total installed costs down, we endeavor to leverage emerging market sourcing and high value engineering.  Our Comprimo Sulfur Solutions® is a significant technology for gas treatment and sulfur recovery plants around the world.

We provide services as to technically complex petrochemical facilities; from new manufacturing complexes, to expansions and modifications and management of plant relocations.  We have experience with many licensed technologies, integrated basic petrochemicals, commodity and specialty chemicals projects, and olefins, aromatics, synthesis gas and their respective derivatives.

Backlog

Backlog represents the total dollar amount of revenues we expect to record in the future as a result of performing work under contracts that have been awarded to us. With respect to O&M contracts, however, we include in backlog the amount of revenues we expect to receive for only one succeeding year, regardless of the remaining life of the contract. For national government programs (other than U.S. federal O&M contracts), our policy is to include in backlog the full contract award, whether funded or unfunded, excluding option periods. In accordance with industry practice, substantially all of our contracts are subject to cancellation, termination, or suspension at the discretion of the client. In addition, the contracts in our backlog are subject to changes in the scope of services to be provided as well as adjustments to the costs relating to the contracts. Accordingly, backlog is not necessarily indicative of our future revenues or earnings.

Our backlog includes expected revenues for contracts that are based on estimates. The following table summarizes our backlog for each of the last three fiscal years (in millions): 

 

Backlog:

 

2016

 

 

2015

 

 

2014

 

Aerospace & Technology

 

$

5,109,973

 

 

$

4,880,775

 

 

$

4,998,844

 

Buildings & Infrastructure

 

 

5,033,539

 

 

 

4,723,034

 

 

 

4,532,085

 

Industrial

 

 

3,106,575

 

 

 

3,650,520

 

 

 

2,471,867

 

Petroleum & Chemicals

 

$

5,510,442

 

 

$

5,552,241

 

 

 

6,377,561

 

Total

 

$

18,760,529

 

 

$

18,806,570

 

 

$

18,380,357

 

For additional information regarding our backlog including those risk factors specific to backlog, please refer to Item 1A — Risk Factors, and Item 7 — Management’s Discussion and Analysis of Financial Condition and Results of Operations below. Subject to the factors discussed in Item 1A— Risk Factors below, we estimate that approximately $7.7 billion, or  41.28%, of total backlog at September 30, 2016 will be realized as revenues within the next fiscal year.

Significant Customers

The following table sets forth the percentage of total revenues earned directly or indirectly from agencies of the U.S. federal government for each of the last five fiscal years:  

 

2016

 

 

2015

 

 

2014

 

 

2013

 

 

2012

 

 

21.4%

 

 

 

21.7%

 

 

 

17.8%

 

 

 

19.9%

 

 

 

22.1%

 

 

Given the percentage of total revenue derived directly from the U.S. federal government, the loss of U.S. federal government agencies as customers would have a material adverse effect on the Company. In addition, any or all of our government contracts could be terminated, we could be suspended or debarred from all government contract work, or payment of our costs could be disallowed. Approximately 88% of revenue derived directly from the U.S. federal government is in the Aerospace & Technology segment.  For more information on risks relating to our government contracts, see Item 1A - Risk Factors below.

Page 12


Financial Information About Geographic Areas

Selected financial information regarding the geographic areas in which we operate is included in Note 15 — Segment Information of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K and is incorporated herein by reference. For fiscal 2016, approximately 43.0% of our revenues were earned from clients outside the United States. Our international operations are subject to a variety of risks, which are described under Item 1A - Risk Factors below.

Contracts

While there is considerable variation in the pricing provisions of the contracts we undertake, our contracts generally fall into two broad categories: cost-reimbursable and fixed-price. The following table sets forth the percentages of total revenues represented by these types of contracts for each of the last five fiscal years:

 

 

 

2016

 

 

2015

 

 

2014

 

 

2013

 

 

2012

 

Cost-reimbursable

 

 

82

%

 

 

83

%

 

 

83

%

 

 

85

%

 

 

85

%

Fixed-price

 

 

18

%

 

 

17

%

 

 

17

%

 

 

15

%

 

 

15

%

 

In accordance with industry practice, most of our contracts (including those with the U.S. federal government) are subject to termination at the discretion of the client, which is discussed in greater detail in Item 1A — Risk Factors. In such situations, our contracts typically provide for reimbursement of costs incurred and payment of fees earned through the date of termination.

When we are directly responsible for engineering, design, procurement, and construction of a project or the maintenance of a client’s plant or facility, we reflect the costs of materials, equipment, and subcontracts in both revenues and costs. On other projects, where the client elects to pay for such items directly and we have no associated responsibility for such items, these amounts are not reflected in either revenues or costs. The following table sets forth the approximate amount of such pass-through costs included in revenues for each of the last five fiscal years (in millions of dollars):

 

2016

 

 

2015

 

 

2014

 

 

2013

 

 

2012

 

$

2,489.9

 

 

$

2,602.6

 

 

$

2,954.9

 

 

$

2,624.8

 

 

$

2,328.4

 

 

Cost-Reimbursable Contracts

Cost-reimbursable contracts generally provide for reimbursement of costs incurred plus an amount of profit. The profit element may be in the form of a simple mark-up applied to the labor costs incurred or it may be in the form of a fee, or a combination of a mark-up and a fee. The fee element can also take several forms. The fee may be a fixed amount; it may be an amount based on a percentage of the costs incurred; or it may be an incentive fee based on targets, milestones, or performance factors defined in the contract. In general, we prefer cost-reimbursable contracts because we believe the primary reason for awarding a contract to us should be our technical expertise and professional qualifications rather than price.

Fixed-Price Contracts

Fixed-price contracts include both “lump sum bid” contracts and “negotiated fixed-price” contracts. Under lump sum bid contracts, we typically bid against other contractors based on specifications the client furnishes. This type of pricing presents certain inherent risks, including the possibility of ambiguities in the specifications received, problems with new technologies, and economic and other changes that may occur over the contract period. Additionally, it is not unusual for lump sum bid contracts to lead to an adversarial relationship with clients, which is contrary to our relationship-based business model. Accordingly, lump sum bid contracts are not our preferred form of contract, and, as such, the Company has rarely entered into individual lump sum bid contracts that are material to its financial results. In contrast, under a negotiated fixed-price contract, we are selected as the contractor first and then we negotiate a price with our client. Negotiated fixed-price contracts frequently exist in single-responsibility arrangements where we perform some portion of the work before negotiating the total price of the project. Thus, although both types of contracts involve a firm price for the client, the lump sum bid contract provides the greater degree of risk to us. However, because of economies that may be realized during the contract term, both negotiated fixed-price and lump sum bid contracts may offer greater profit potential than other types of contracts. The Company carefully manages the risk inherent in these types of contracts.  Over the past five years, most of our fixed-price work has been either negotiated fixed-price contracts or lump sum bid contracts for project services, rather than turnkey construction.

Page 13


Competition

With respect to each of the four broad categories of services we provide, we compete with a large number of companies across the world. Typically, no single company or companies dominate the market in which we provide any such services. We compete based on the following factors, among others: price of services, technical capabilities, reputation for quality, safety record, availability of qualified personnel, ability to timely perform work, and willingness to accept project-related risk. For more information regarding the competitive conditions in our business, please refer to Item 1A— Risk Factors below.

Employees

At September 30, 2016, we had approximately 43,800 full-time, staff employees (including contract staff). Additionally, as of September 30, 2016, there were approximately 11,100 persons employed in the field on a project basis. The number of field employees varies in relation to the number and size of the maintenance and construction projects in progress at any particular time.

Executive Officers of the Registrant

The information required by Paragraph (a), and Paragraphs (c) through (g) of Item 401 of Regulation S-K (except for information required by Paragraph (e) of that Item to the extent the required information pertains to our executive officers) and Item 405 of Regulation S-K is set forth under the captions "The Board of Directors and its Committees - Nominees," "The board of Directors and its Committees - Continuing Directors," and "Section 16(a) Beneficial Ownership Reporting Compliance" in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

The following table presents the information required by Paragraph (b) of Item 401 of Regulation S-K.

 

 

 

 

 

 

 

Year Joined the

Name

 

Age

 

Position with the Company

 

Registrant

Steven J. Demetriou

 

58

 

Chairman and Chief Executive Officer

 

2015

Kevin C. Berryman

 

57

 

Executive Vice President, Chief Financial Officer

 

2014

Terence D. Hagen

 

52

 

President, Aerospace & Technology

 

1987

Joseph G. Mandel

 

56

 

President, Petroleum & Chemicals

 

2011

Robert V. Pragada

 

48

 

President, Buildings & Infrastructure

 

2016

William B. Allen

 

52

 

Senior Vice President and Chief Accounting Officer

 

2016

Lori S. Sundberg

 

52

 

Senior Vice President, Global Human Resources

 

2013

Michael R. Tyler

 

60

 

Senior Vice President and General Counsel

 

2013

 

All of the officers listed in the preceding table serve in their respective capacities at the pleasure of the Board of Directors of the Company. Mr. Hagen has served in executive and senior management capacities with the Company for more than five years. Below is additional information on the other executive officers.

Mr. Demetriou joined the Company in August 2015. Mr. Demetriou served as Chairman and CEO of Aleris Corporation for 14 years, a global downstream aluminum producer based in Cleveland, Ohio. Over the course of his career, he has gained broad experience with companies in a range of industries including metals, specialty chemicals, oil & gas, manufacturing and fertilizers.

Mr. Berryman joined the Company in December 2014. Mr. Berryman served as EVP and CFO for five years at International Flavors and Fragrances Inc., an S&P 500 company and leading global creator of flavors and fragrances used in a wide variety of consumer products. Prior to that, he spent 25 years at Nestlé in a number of finance roles including treasury, mergers & acquisitions, strategic planning, and control.

Mr. Mandel joined the Company in February 2011 through the acquisition of certain operating companies comprising the process and construction business of Aker Solutions ASA, a global provider of products, systems and services to the oil and gas industry. Mr. Mandel served in various senior management roles with Aker Solutions ASA since first joining them in 1995.

Page 14


Mr. Pragada rejoined the Company in February 2016 after serving as President and Chief Executive Officer of The Brock Group since August 2014.  From March 2006 to August 2014 Mr. Pragada served in executive and senior management capacities with the Company.

Mr. Allen, joined the Company in October 2016.  Mr. Allen served as Corporate Vice President, Finance and Principal Accounting Officer at Lyondellbasell Industries, N.V., from 2013 to 2016, from 2009 to 2013 he served as Vice President, Corporate Controller and Chief Accounting Officer, and from 2007 to 2009 as Chief Financial Officer of the Catalysts Business Segment at Albemarle Corporation.

Ms. Sundberg joined the Company in April 2013. Ms. Sundberg served as the Senior Vice President of Human Resources and Ethics at Arizona Public Services Company, Arizona's largest electric utility company, from November 2007 to April 2013.  From 1998 to 2007 she served in a number of global HR leadership roles with American Express.

Mr. Tyler joined the Company in June 2013. He previously served as Executive Vice President, General Counsel and Secretary of Sanmina Corporation, a global electronics manufacturing services provider from April 2007 to June 2013, and Chief Legal and Administrative Officer of Gateway, Inc., a computer hardware company, from January 2004 to April 2007.

Available Information

You may read and copy any materials we file with the SEC at the SEC’s Public Reference Room located at 100 F Street N.E., Washington, D.C. 20549. In order to obtain information about the operation of the Public Reference Room, a person may call the SEC at 1-800-732-0330. The SEC also maintains a site on the Internet that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC. The SEC’s website is http://www.sec.gov. You may also read and download the various reports we file with, or furnish to, the SEC free of charge from our website at www.jacobs.com.

 

 

Page 15


Item 1A.

RISK FACTORS

We operate in a changing environment that involves numerous known and unknown risks and uncertainties that could materially adversely affect our business, financial condition, and results of operations. The risks described below highlight some of the factors that have affected and could affect us in the future. We may also be affected by unknown risks or risks that we currently think are immaterial. If any such events actually occur, our business, financial condition, and results of operations could be materially adversely affected.

Construction and maintenance sites are inherently dangerous workplaces. If we fail to maintain safe work sites, we can be exposed to significant financial losses and reputational harm, as well as civil and criminal liabilities.

Construction and maintenance sites often put our employees and others in close proximity with large pieces of mechanized equipment, moving vehicles, chemical and manufacturing processes, and highly regulated materials, in a challenging environment, and often in geographically remote locations. On many sites, we are responsible for safety and, accordingly, must implement safety procedures. If we fail to implement such procedures or if the procedures we implement are ineffective, our employees and others may become injured, disabled or even lose their lives, the completion or commencement of our projects may be delayed, and we may be exposed to litigation or investigations. Unsafe work sites also have the potential to increase employee turnover, increase the cost of a project to our clients, and raise our operating costs. Any of the foregoing could result in financial losses or reputational harm, which could have a material adverse impact on our business, financial condition, and results of operations.

In addition, our projects can involve the handling of hazardous and other highly regulated materials, which, if improperly handled or disposed of, could subject us to civil and/or criminal liabilities. We are also subject to regulations dealing with occupational health and safety. Although we maintain functional groups whose primary purpose is to ensure we implement effective health, safety, and environmental (“HSE”) work procedures throughout our organization, including construction sites and maintenance sites, the failure to comply with such regulations could subject us to liability. In addition, despite the work of our functional groups, we cannot guarantee the safety of our personnel or that there will be no damage to or loss of our work, equipment or supplies.

Our safety record is critical to our reputation. Many of our clients require that we meet certain safety criteria to be eligible to bid for contracts and many contracts provide for automatic termination or forfeiture of some or all of our contract fees or profit in the event we fail to meet certain measures. Accordingly, if we fail to maintain adequate safety standards, we could suffer reduced profitability or the loss of projects or clients, which could have a material adverse impact on our business, financial condition, and results of operations.

Our vulnerability to the cyclical nature of the markets in which our clients operate is exacerbated during economic downturns and times of political uncertainty.

We provide technical, professional, construction, and O&M services to clients operating in a number of markets including oil and gas exploration, production, and refining; programs for various national governments, including the U.S. federal government; chemicals and polymers; mining and minerals; pharmaceuticals and biotechnology; infrastructure; buildings; power; and other, general industrial and consumer businesses and markets (such as technology and manufacturing; pulp and paper; and food and consumer products). These markets and the resulting demand for our services have been, and we expect will continue to be, cyclical and subject to significant fluctuations due to a variety of factors beyond our control, including economic conditions and changes in client spending, particularly during periods of economic or political uncertainty.

Current global economic and political conditions have negatively impacted many of our clients’ ability and willingness to fund their projects, including their ability to raise capital and pay, or timely pay, our invoices. They have also caused our clients to reduce their capital expenditures, alter the mix of services purchased, seek more favorable price and other contract terms, and otherwise slow their spending on our services. For example, in the public sector, declines in state and local tax revenues as well as other economic declines may result in lower state and local government spending. In addition, due to these conditions many of our competitors may be more inclined to take greater or unusual risks or accept terms and conditions in contracts that we might not deem acceptable. These conditions have reduced, and may continue to reduce, the demand for our services, which has had, and may continue to have, a significant negative impact on our business, financial condition and results of operations.

Current economic and political conditions also make it extremely difficult for our clients, our vendors, and us to accurately forecast and plan future business activities. For example, following the recent U.S. elections, many observers

Page 16


expect spending on U.S. infrastructure to increase significantly. There is no assurance that such spending will occur or that the Company will benefit from any increase in spending. We cannot predict the timing, strength or duration of any economic recovery or downturn worldwide or in our clients’ markets. In addition, our business has traditionally lagged recoveries in the general economy and, therefore, may not recover as quickly as the economy at large. A continuation or worsening of current weak economic conditions, a failure to obtain expected benefits from any increased infrastructure spending, or a reduction in government spending could have a material adverse impact on our business, financial condition, and results of operations.

Regardless of economic or market conditions, investment decisions by our customers may vary by location or as a result of other factors like the availability of labor or relative construction cost. Because we are dependent on the timing and funding of new awards, we are therefore vulnerable to changes in our clients’ markets and investment decisions. As a result, our past results have varied and may continue to vary depending upon the demand for future projects in the markets and the locations in which we operate.

Fluctuations in commodity prices may affect our customers’ investment decisions and therefore subject us to risks of cancellation, delays in existing work, or changes in the timing and funding of new awards.

Commodity prices can affect our customers in a number of ways. For example, for those customers that produce commodity products such as oil, gas, copper, or fertilizers, fluctuations in price can have a direct effect on their profitability and cash flow and, therefore, their willingness to continue to invest or make new capital investments. Furthermore, declines in commodity prices can negatively impact our business in regions whose economies are substantially dependent on commodity prices, such as the Middle East. To the extent commodity prices decline or fluctuate and our customers defer new investments or cancel or delay existing projects, the demand for our services decreases, which may have a material adverse impact on our business, financial condition, and results of operations.

Commodity prices can also strongly affect the costs of projects. Rising commodity prices can negatively impact the potential returns on investments that are planned, as well as those in progress, and result in customers deferring new investments or canceling or delaying existing projects. Cancellations and delays have affected our past results and may continue to do so in significant and unpredictable ways and could have a material adverse impact on our business, financial condition, and results of operations.

Our project execution activities may result in liability for faulty services.

If we fail to provide our services in accordance with applicable professional standards, we could be exposed to significant monetary damages or even criminal violations. Our engineering practice, for example, involves professional judgments regarding the planning, design, development, construction, operations and management of industrial facilities and public infrastructure projects. While we do not generally accept liability for consequential damages in our contracts, and although we have adopted a range of insurance, risk management and risk avoidance programs designed to reduce potential liabilities, a catastrophic event at one of our project sites or completed projects resulting from the services we have performed could result in significant professional or product liability, and warranty or other claims against us as well as reputational harm, especially if public safety is impacted. These liabilities could exceed our insurance limits or the fees we generate, may not be covered by insurance at all due to various exclusions in our coverage, and could impact our ability to obtain insurance in the future. Further, even where coverage applies, the policies have deductibles, which result in our assumption of exposure for a layer of coverage with respect to any claim filed by us. In addition, clients or subcontractors who have agreed to indemnify us against any such liabilities or losses might refuse or be unable to pay us. An uninsured claim, either in part or in whole, as well as any claim covered by insurance but subject to a high deductible, if successful and of a material magnitude, could have a material adverse impact on our business, financial condition and results of operations.

We engage in a highly competitive business. If we are unable to compete effectively, we could lose market share and our business and results of operations could be negatively impacted.

We face intense competition to provide technical, professional, and construction services to clients. The markets we serve are highly competitive and we compete against a large number of regional, national, and multinational companies.  

The extent of our competition varies by industry, geographic market, and project type. For example, with respect to our construction, and operations and maintenance services, clients generally award large projects to large contractors, which may give our larger competitors an advantage when bidding for these projects. Conversely, with respect to our engineering, design, architectural, and consulting services, low barriers of entry can result in competition with smaller, newer competitors. The extent and type of competition varies by market and geographic area.

Page 17


Our projects are frequently awarded through a competitive bidding process, which is standard in our industry. We are constantly competing for project awards based on pricing, schedule and the breadth and technical sophistication of our services. Competition can place downward pressure on our contract prices and profit margins, and may force us to accept contractual terms and conditions that are less favorable to us, thereby increasing the risk that, among other things, we may not realize profit margins at the same rates as we've seen in the past or may become responsible for costs or other liabilities we have not accepted in the past. If we are unable to compete effectively, we may experience a loss of market share or reduced profitability or both, which if significant, could have a material adverse impact on our business, financial condition, and results of operations.

Our results of operations depend on the award of new contracts and the timing of the performance of these contracts.

Our revenues are derived from new contract awards. Delays in the timing of the awards or cancellations of such prospects as a result of economic conditions, material and equipment pricing and availability or other factors could impact our long-term projected results. It is particularly difficult to predict whether or when we will receive large-scale projects as these contracts frequently involve a lengthy and complex bidding and selection process, which is affected by a number of factors, such as market conditions, governmental and environmental approvals. Since a significant portion of our revenues is generated from such projects, our results of operations and cash flows can fluctuate significantly from quarter to quarter depending on the timing of our contract awards and the commencement or progress of work under awarded contracts. Furthermore, many of these contracts are subject to financing contingencies and as a result, we are subject to the risk that the customer will not be able to secure the necessary financing for the project.

In addition, many of our contracts require us to satisfy specific progress or performance milestones in order to receive payment from the customer. As a result, we may incur significant costs for engineering, materials, components, equipment, labor or subcontractors prior to receipt of payment from a customer.

The uncertainty of our contract award timing can also present difficulties in matching workforce size with contract needs. In some cases, we maintain and bear the cost of a ready workforce that is larger than necessary under existing contracts in anticipation of future workforce needs for expected contract awards. If an expected contract award is delayed or not received, we may incur additional costs resulting from reductions in staff or redundancy of facilities, which could have a material adverse effect on our business, financial condition and results of operations.

The outcome of pending and future claims and litigation could have a material adverse impact on our business, financial condition, and results of operations.

We are a party to litigation in the normal course of business. Since we engage in engineering and construction activities for large facilities and projects where design, construction or systems failures can result in substantial injury or damage to employees or others, we are exposed to substantial claims and litigation and investigations if there is a failure at any such facility or project. Such claims could relate to, among other things, personal injury, loss of life, business interruption, property damage, pollution, and environmental damage and be brought by our clients or third parties, such as those who use or reside near our clients’ projects. We can also be exposed to claims if we agreed that a project will achieve certain performance standards or satisfy certain technical requirements and those standards or requirements are not met. In many of our contracts with clients, subcontractors, and vendors, we agree to retain or assume potential liabilities for damages, penalties, losses, and other exposures relating to projects that could result in claims that greatly exceed the anticipated profits relating to those contracts. In addition, while clients and subcontractors may agree to indemnify us against certain liabilities, such third parties may refuse or be unable to pay us.

We maintain insurance coverage for various aspects of our business and operations. Our insurance programs have varying exclusions for matters such as fraud, coverage limits and maximums, and insurance companies may seek to deny claims we might make. In addition, we have elected to retain a portion of losses that may occur through the use of various deductibles, limits, and retentions under these programs. As a result, we may be subject to future liability for which we are only partially insured, or completely uninsured.

Although in the past we have been generally able to cover our insurance needs, there can be no assurances that we can secure all necessary or appropriate insurance in the future, or that such insurance can be economically secured. For example, catastrophic events can result in decreased coverage limits, coverage that is more limited, or increased premium costs or deductibles. We monitor the financial health of the insurance companies from which we procure insurance, and this is one of the factors we take into account when purchasing insurance. Our insurance is purchased from a number of the world's leading providers, often in layered insurance or quota share arrangements. If any of our third party insurers fail, abruptly cancel our

Page 18


coverage or otherwise cannot satisfy their insurance requirements to us, then our overall risk exposure and operational expenses could be increased and our business operations could be interrupted.

In addition, the nature of our business sometimes results in clients, subcontractors, and vendors presenting claims to us for, among other things, recovery of costs related to certain projects. Similarly, we occasionally present change orders and claims to our clients, subcontractors, and vendors for, among other things, additional costs exceeding the original contract price. If we fail to document properly the nature of our claims and change orders or are otherwise unsuccessful in negotiating reasonable settlements with our clients, subcontractors, and vendors, we could incur cost overruns, reduced profits or, in some cases, a loss for a project. Further, these claims can be the subject of lengthy negotiations, arbitration or litigation proceedings, which could result in the investment of significant amounts of working capital pending the resolution of the relevant change orders and claims. A failure to promptly recover on these types of claims could have a material adverse impact on our liquidity and financial results. Additionally, irrespective of how well we document the nature of our claims and change orders, the cost to prosecute and defend claims and change orders can be significant.

Litigation and regulatory proceedings are subject to inherent uncertainties and unfavorable rulings can and do occur. Pending or future claims against us could result in professional liability, product liability, criminal liability, warranty obligations, default under our credit agreements and other liabilities which, to the extent we are not insured against a loss or our insurer fails to provide coverage, could have a material adverse impact on our business, financial condition, and results of operations.

The nature of our contracts, particularly those that are fixed-price, subject us to risks of cost overruns. We may experience reduced profits or, in some cases, losses under these contracts if costs increase above our estimates.

For fiscal 2016, approximately 18% of our revenues were earned under fixed-price contracts. Such contracts require us to estimate the total cost of the project in advance of our performance. In addition, we may enter into guaranteed maximum price contracts where we guarantee a price or delivery date. For fixed-price contracts, we may benefit from any cost-savings, but we bear the risk of paying some, if not all, of any cost overruns. Fixed-price contract amounts are established in part on cost and scheduling estimates that are based on a number of assumptions, including those about future economic conditions, prices and availability of labor, equipment and materials, and other exigencies. If these estimates prove inaccurate, there are errors or ambiguities as to contract specifications, or if circumstances change due to, among other things, unanticipated technical problems, difficulties in obtaining permits or approvals, changes in local laws or labor conditions, weather or other delays beyond our control, changes in the costs of equipment or raw materials, our vendors’ or subcontractors’ inability or failure to perform, or changes in general economic conditions, then cost overruns may occur and we could experience reduced profits or, in some cases, a loss for that project. These risks are exacerbated for projects with long-term durations because there is an increased risk that the circumstances on which we based our original estimates will change in a manner that increases costs. If the project is significant, or there are one or more issues that impact multiple projects, costs overruns could have a material adverse impact on our business, financial condition, and results of operations.

Our contracts that are fundamentally cost reimbursable in nature may also present a risk to the extent the final cost on a project exceeds the amount the customer expected or budgeted. Like fixed-price contracts, the expected cost of cost-reimbursable projects are based in part on our estimates of the resources and time necessary to perform such contracts. If we are unable to properly support the costs we incur or otherwise fail to obtain proper reimbursement for all costs incurred - for whatever reason - the project may be less profitable than we expect or even result in losses. Additionally, we may be required to pay liquidated damages if we fail to meet schedule or performance requirements of our contracts, which could harm our reputation and have a material adverse impact on our business, financial condition, and results of operation.

Our continued success is dependent upon our ability to hire, retain, and utilize qualified personnel.

The success of our business is dependent upon our ability to hire, retain, and utilize qualified personnel, including engineers, architects, designers, craft personnel, and corporate management professionals at a reasonable cost who have the required experience and expertise. The market for these and other personnel is competitive. From time to time, it may be difficult to attract and retain qualified individuals with the expertise, and in the timeframe, demanded by our clients, or to replace such personnel when needed in a timely manner. In certain geographic areas, for example, we may not be able to satisfy the demand for our services because of our inability to successfully hire and retain qualified personnel. Furthermore, some of our personnel hold government granted clearance that may be required to obtain government projects. If we were to lose some or all of these personnel, they would be difficult to replace. Loss of the services of, or failure to recruit, qualified technical and management personnel could limit our ability to successfully complete existing projects and compete for new projects.

Page 19


In addition, in the event that any of our key personnel retire or otherwise leave the Company, we need to have appropriate succession plans in place and to successfully implement such plans, which requires devoting time and resources toward identifying and integrating new personnel into leadership roles and other key positions. If we cannot attract and retain qualified personnel or effectively implement appropriate succession plans, it could have a material adverse impact on our business, financial condition, and results of operations.

The cost of providing our services, including the extent to which we utilize our workforce, affects our profitability. For example, the uncertainty of contract award timing can present difficulties in matching our workforce size with our contracts. If an expected contract award is delayed or not received, we could incur costs resulting from excess staff, reductions in staff, or redundancy of facilities that could have a material adverse impact on our business, financial conditions, and results of operations.

The contracts in our backlog may be adjusted, cancelled or suspended by our clients and, therefore, our backlog is not necessarily indicative of our future revenues or earnings. Additionally, even if fully performed, our backlog is not a good indicator of our future gross margins.

Backlog represents the total dollar amount of revenues we expect to record in the future as a result of performing work under contracts that have been awarded to us. As of the end of fiscal 2016, our backlog totaled approximately $18.8 billion. There is no assurance that backlog will actually be realized as revenues in the amounts reported or, if realized, will result in profits. In accordance with industry practice, substantially all of our contracts are subject to cancellation, termination, or suspension at the discretion of the client. In the event of a project cancellation, we would generally have no contractual right to the total revenue reflected in our backlog. Projects can remain in backlog for extended periods of time because of the nature of the project and the timing of the particular services required by the project. The risk of contracts in backlog being cancelled or suspended generally increases during periods of widespread economic slowdowns or in response to changes in commodity prices.

The contracts in our backlog are subject to changes in the scope of services to be provided as well as adjustments to the costs relating to the contracts. The revenue for certain contracts included in backlog is based on estimates. Additionally, the way we perform on our individual contracts can affect greatly our gross margins and hence, future profitability.

In some markets, there is a continuing trend towards cost-reimbursable contracts with incentive-fee arrangements. Typically, our incentive fees are based on such things as achievement of target completion dates or target costs, overall safety performance, overall client satisfaction, and other performance criteria. If we fail to meet such targets or achieve the expected performance standards, we may receive a lower, or even zero, incentive fee resulting in lower gross margins. Accordingly, there is no assurance that the contracts in backlog, assuming they produce the revenues currently expected, will generate gross margins at the rates we have realized in the past.

Contracts with the U.S. federal government and other governments and their agencies pose additional risks relating to future funding and compliance.

Contracts with the U.S. federal government and other governments and their agencies, which are a significant source of our revenue and profit, are subject to various uncertainties, restrictions, and regulations including oversight audits by various government authorities as well as profit and cost controls, which could result in withholding or delay of payments to us. Government contracts are also exposed to uncertainties associated with funding such as sequestration and budget deficits. Contracts with the U.S. federal government, for example, are subject to the uncertainties of Congressional funding. Governments are typically under no obligation to maintain funding at any specific level, and funds for government programs may even be eliminated. Legislatures typically appropriate funds on a year-by-year basis, while contract performance may take more than one year. As a result, contracts with government agencies may be only partially funded or may be terminated, and we may not realize all of the potential revenue and profit from those contracts.

Our government clients may reduce the scope or terminate our contracts for convenience or decide not to renew our contracts with little or no prior notice. Since government contracts represent a significant percentage of our revenues (for example, those with the U.S. federal government represented approximately 21.4% of our total revenue in fiscal 2016 ), a significant reduction in government funding or the loss of such contracts could have a material adverse impact on our business, financial condition, and results of operations.

Most government contracts are awarded through a rigorous competitive process. The U.S. federal government has increasingly relied upon multiple-year contracts with multiple contractors that generally require those contractors to engage

Page 20


in an additional competitive bidding process for each task order issued under a contract. This process may result in us facing significant additional pricing pressure and uncertainty and incurring additional costs. Moreover, we may not be awarded government contracts because of existing policies designed to protect small businesses and under-represented minorities. Our inability to win new contracts or be awarded work under existing contracts could have a negative impact on our business and results of operations.

In addition, government contracts are subject to specific procurement regulations and a variety of other socio-economic requirements, which affect how we transact business with our clients and, in some instances, impose additional costs on our business operations. For example, for contracts with the U.S. federal government, we must comply with the Federal Acquisition Regulation, the Truth in Negotiations Act, the Cost Accounting Standards, the Service Contract Act, and numerous regulations governing environmental protection and employment practices. Government contracts also contain terms that expose us to heightened levels of risk and potential liability than non-government contracts. This includes, for example, unlimited indemnification obligations.

We also are subject to government audits, investigations, and proceedings. For example, government agencies such as the U.S. Defense Contract Audit Agency routinely review and audit us to determine the adequacy of and our compliance with our internal control systems and policies and whether allowable costs are in accordance with applicable regulations. These audits can result in a determination that a rule or regulation has been violated or that adjustments are necessary to the amount of contract costs we believe are reimbursable by the agencies and the amount of our overhead costs allocated to the agencies.

If we violate a rule or regulation, fail to comply with a contractual or other requirement or do not satisfy an audit, a variety of penalties can be imposed on us including monetary damages and criminal and civil penalties. For example, in so-called “qui tam” actions brought by individuals or the government under the U.S. Federal False Claims Act or under similar state and local laws, treble damages can be awarded.  In addition, any or all of our government contracts could be terminated, we could be suspended or debarred from all government contract work, or payment of our costs could be disallowed.  The occurrence of any of these actions could harm our reputation and our business, financial condition, and results of operations could be negatively impacted.

Many of our federal government contracts require us to have security clearances, which can be difficult and time consuming to obtain. If our employees are unable to obtain or retain the necessary securities clearances, our clients could terminate or not renew existing contracts or award us new contracts. To the extent this occurs, our business, financial condition and results of operations could be negatively impacted.

Our use of joint ventures and partnerships exposes us to risks and uncertainties, many of which are outside of our control.

As is common in our industry, we perform certain contracts as a member of joint ventures, partnerships, and similar arrangements. This situation exposes us to a number of risks, including the risk that our partners may be unable to fulfill their obligations to us or our clients.

We cannot control the actions of our joint venture partners, including the nonperformance, default or bankruptcy of our joint venture partners. Our partners may be unable or unwilling to provide the required levels of financial support to the partnerships. If these circumstances occur, we may be required to pay financial penalties or liquidated damages, provide additional services, or make additional investments to ensure adequate performance and delivery of the contracted services. Under agreements with joint and several liabilities, we could be liable for both our obligations and those of our partners. These circumstances could also lead to disputes and litigation with our partners or clients, all of which could have a material adverse impact on our reputation, business, financial condition, and results of operations.

We depend on the management effectiveness of our joint venture partners. Differences in views among the joint venture participants may result in delayed decisions or in failures to agree on major issues, which could materially affect the business and operations of these ventures. In addition, in many of the countries in which we engage in joint ventures, it may be difficult to enforce our contractual rights under the applicable joint venture agreement. If we are not able to enforce our contractual rights, we may not be able to realize the benefits of the joint venture or we may be subject to additional liabilities.

We participate in joint ventures and similar arrangements in which we are not the controlling partner. In these cases, we have limited control over the actions of the joint venture. These joint ventures may not be subject to the same requirements regarding internal controls and internal control over financial reporting that we follow. To the extent the controlling partner makes decisions that negatively impact the joint venture or internal control problems arise within the joint venture, it could have a material adverse impact on our business, financial condition, and results of operations.

Page 21


The failure by a joint venture partner to comply with applicable laws, regulations or client requirements could negatively impact our business and, for government clients, could result in fines, penalties, suspension or even debarment being imposed on us, which could have a material adverse impact on our business, financial condition, and results of operations.

We are dependent on third parties to complete many of our contracts.

Third-party subcontractors we hire perform much of the work performed under our contracts. We also rely on third-party equipment manufacturers or suppliers to provide much of the equipment and materials used for projects. If we are unable to hire qualified subcontractors or find qualified equipment manufacturers or suppliers, our ability to successfully complete a project could be impaired. If we are not able to locate qualified third-party subcontractors or the amount we are required to pay for subcontractors or equipment and supplies exceeds what we have estimated, especially in a lump sum or a fixed-price contract, we may suffer losses on these contracts. If a subcontractor, supplier, or manufacturer fails to provide services, supplies or equipment as required under a contract for any reason, we may be required to source these services, equipment or supplies to other third parties on a delayed basis or on less favorable terms, which could impact contract profitability. There is a risk that we may have disputes with our subcontractors relating to, among other things, the quality and timeliness of work performed, customer concerns about the subcontractor, or our failure to extend existing task orders or issue new task orders under a contract. In addition, faulty workmanship, equipment or materials could impact the overall project, resulting in claims against us for failure to meet required project specifications.

In the current economic environment, third parties may find it difficult to obtain sufficient financing to help fund their operations. The inability to obtain financing could adversely affect a third party’s ability to provide materials, equipment or services which could have a material adverse impact on our business, financial condition, and results of operations. In addition, a failure by a third party subcontractor, supplier or manufacturer to comply with applicable laws, regulations or client requirements could negatively impact our business and, for government clients, could result in fines, penalties, suspension or even debarment being imposed on us, which could have a material adverse impact on our business, financial condition, and results of operations.

Negative conditions in the credit and financial markets and delays in receiving client payments could result in liquidity problems, adversely affecting our cost of borrowing and our business.

Although we finance much of our operations using cash provided by operations, at times we depend on the availability of credit to grow our business and to help fund business acquisitions. Instability in the credit markets in the U.S. or abroad could cause the availability of credit to be relatively difficult or expensive to obtain at competitive rates, on commercially reasonable terms or in sufficient amounts. This situation could make it more difficult or more expensive for us to access funds, refinance our existing indebtedness, enter into agreements for new indebtedness, or obtain funding through the issuance of securities or such additional capital may not be available on terms acceptable to us. We may also enter into business acquisition agreements that require us to access credit, which if not available at the closing of the acquisition could result in a breach of the acquisition agreement and a resulting claim for damages by the sellers of such business. In addition, market conditions could negatively impact our clients’ ability to fund their projects and, therefore, utilize our services, which could have a material adverse impact on our business, financial condition, and results of operations.

In addition, we are subject to the risk that the counterparties to our credit agreements may go bankrupt if they suffer catastrophic demand on their liquidity that will prevent them from fulfilling their contractual obligations to us. We also routinely enter into contracts with counterparties including vendors, suppliers, and subcontractors that may be negatively impacted by events in the credit markets. If those counterparties are unable to perform their obligations to us or our clients, we may be required to provide additional services or make alternate arrangements on less favorable terms with other parties to ensure adequate performance and delivery of services to our clients. These circumstances could also lead to disputes and litigation with our partners or clients, which could have a material adverse impact on our reputation, business, financial condition, and results of operations.

Some of our customers, suppliers and subcontractors depend on access to commercial financing and capital markets to fund their operations. Disruptions of the credit or capital markets could adversely affect our clients’ ability to finance projects and could result in contract cancellations or suspensions, project delays and payment delays or defaults by our clients. In addition, clients may be unable to fund new projects, may choose to make fewer capital expenditures or otherwise slow their spending on our services or to seek contract terms more favorable to them. Our government clients may face budget deficits that prohibit them from funding proposed and existing projects or that cause them to exercise their right to terminate our contracts with little or no prior notice. In addition, any financial difficulties suffered by our subcontractors or suppliers could

Page 22


increase our cost or adversely impact project schedules. These disruptions could materially impact our backlog and have a material adverse impact on our business, financial condition, and results of operations.

In addition, we typically bill our clients for our services in arrears and are, therefore, subject to our clients delaying or failing to pay our invoices. In weak economic environments, we may experience increased delays and failures due to, among other reasons, our clients’ unwillingness to pay for alleged poor performance or to preserve their own working capital. If one or more clients delays in paying or fails to pay us a significant amount of our outstanding receivables, it could have a material adverse impact on our liquidity, financial condition, and results of operations.

Furthermore, our cash balances and short-term investments are maintained in accounts held by major banks and financial institutions located primarily in North America, Europe, South America, Australia and Asia. Some of our accounts hold deposits in amounts that exceed available insurance. Although none of the financial institutions in which we hold our cash and investments have gone into bankruptcy or forced receivership, or have been seized by their governments, there is a risk that such events may occur in the future. If any such events were to occur, we would be at risk of not being able to access our cash, which may result in a temporary liquidity crisis that could impede our ability to fund our operations, which could have a material adverse impact on our business, financial condition, and results of operations.

Maintaining adequate bonding and letter of credit capacity is necessary for us to successfully bid on and win some contracts.

In line with industry practice, we are often required to provide performance or payment bonds or letters of credit to our customers. These instruments indemnify the customer should we fail to perform our obligations under the contract. If a bond or a letter of credit is required for a particular project and we are unable to obtain an appropriate bond or letter of credit, we cannot pursue that project. Historically, we have had adequate bonding and letter of credit capacity but, as is typically the case, the issuance of a bond is at the surety’s sole discretion and the issuance of a letter of credit is based on the Company's credit-worthiness. Because of an overall lack of worldwide bonding capacity, we may find it difficult to find sureties who will provide required levels of bonding or such bonding may only be available at significant additional cost. There can be no assurance that our bonding capacity will continue to be available to us on reasonable terms. In addition, future projects may require us to obtain letters of credit that extend beyond the term of our existing credit facilities. Our inability to obtain adequate bonding and, as a result, to bid on new contracts that require such bonding or letter of credit could have a material adverse impact on our business, financial condition, results of operations, and cash flows.

Past and future environmental, heath, and safety laws could impose significant additional costs and liabilities.

We are subject to a variety of environmental, health, and safety laws and regulations governing, among other things, discharges to air and water, the handling, storage, and disposal of hazardous or waste materials and the remediation of contamination associated with the releases of hazardous substances and human health and safety. These laws and regulations and the risk of attendant litigation can cause significant delays to a project and add significantly to its cost. Violations of these regulations could subject us and our management to civil and criminal penalties and other liabilities.

Various U.S. federal, state, local, and foreign environmental laws and regulations may impose liability for property damage and costs of investigation and cleanup of hazardous or toxic substances on property currently or previously owned by us or arising out of our waste management or environmental remediation activities. These laws may impose responsibility and liability without regard to knowledge of or causation of the presence of contaminants. The liability under these laws is joint and several. We have potential liabilities associated with our past waste management and other activities and with our current and prior ownership of various properties. The discovery of additional contaminants or the imposition of unforeseen clean-up obligations at these or other sites could have a material adverse impact on our financial condition and results of operations.

When we perform our services, our personnel and equipment may be exposed to radioactive and hazardous materials and conditions. We may be subject to liability claims by employees, customers, and third parties as a result of such exposures. In addition, we may be subject to fines, penalties or other liabilities arising under environmental or safety laws. A claim, if not covered or only partially covered by insurance, could have a material adverse impact on our results of operations and financial condition.

Health safety, and environmental laws and regulations and policies are reviewed periodically and any changes thereto could affect us in substantial and unpredictable ways. Such changes could, for example, relax or repeal laws and regulations relating to the environment, which could result in a decline in the demand for our environmental services and, in turn, could

Page 23


negatively impact our revenue. Changes in the environmental laws and regulations, remediation obligations, enforcement actions, stricter interpretations of existing requirements, future discovery of contamination or claims for damages to persons, property, natural resources or the environment could result in material costs and liabilities that we currently do not anticipate. If we fail to comply with any environmental, health, or safety laws or regulations, whether actual or alleged, we could be exposed to fines, penalties or potential litigation liabilities, including costs, settlements and judgments, any of which could adversely affect our business, financial condition and results of operations.

In addition, we and many of our clients operate in highly regulated environments, which may require us or our clients to obtain, and to comply with, federal, state, and local government permits and approvals. Any of these permits or approvals may be subject to denial, revocation or modification under various circumstances. Failure to obtain or comply with, or the loss or modification of, the conditions of permits or approvals may subject us to penalties or other liabilities, which could have a material adverse impact on our business, financial condition, and result of operations.

If we fail to comply with federal, state, local or foreign governmental requirements, our business may be adversely affected.

We are subject to U.S. federal, state, local and foreign laws and regulations that affect our business. For example, our global operations require importing and exporting goods and technology across international borders. Although we have policies and procedures to comply with U.S. and foreign international trade laws, the violation of such laws could subject the Company and its employees to civil or criminal penalties, including substantial monetary fines, or other adverse actions including denial of import or export privileges or debarment from participation in U.S. government contracts, and could damage our reputation and our ability to do business.

Employee, agent or partner misconduct or our overall failure to comply with laws or regulations could weaken our ability to win contracts, which could result in reduced revenues and profits.

Misconduct, fraud, non-compliance with applicable laws and regulations, or other improper activities by one of our employees, agents or partners could have a significant negative impact on our business and reputation. Such misconduct could include the failure to comply with government procurement regulations, regulations regarding the protection of classified information, regulations prohibiting bribery and other corrupt practices, regulations regarding the pricing of labor and other costs in government contracts, regulations on lobbying or similar activities, regulations pertaining to the internal controls over financial reporting, regulations pertaining to export control, environmental laws, and any other applicable laws or regulations. For example, we routinely provide services that may be highly sensitive or that relate to critical national security matters; if a security breach were to occur, our ability to procure future government contracts could be severely limited. The precautions we take to prevent and detect these activities may not be effective, and we could face unknown risks or losses. Our failure to comply with applicable laws or regulations or acts of misconduct could subject us to fines and penalties, cancellation of contracts, loss of security clearance, and suspension or debarment from contracting, which could weaken our ability to win contracts and result in reduced revenues and profits and could have a material adverse impact on our business, financial condition, and results of operations.

We could be adversely affected by violations of the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws.

The U.S. Foreign Corrupt Practices Act (“FCPA”), the U.K. Bribery Act of 2010, and similar anti-bribery laws in other jurisdictions generally prohibit companies and their intermediaries from making improper payments for the purpose of obtaining or retaining business. Our policies mandate compliance with these anti-bribery laws, including the requirements to maintain accurate information and internal controls. We operate in many parts of the world that have experienced governmental corruption to some degree and in certain circumstances; strict compliance with anti-bribery laws may conflict with local customs and practices. Despite our training and compliance programs, there is no assurance that our internal control policies and procedures will protect us from acts committed by our employees or agents. If we are found to be liable for FCPA or other violations (either due to our own acts or our inadvertence, or due to the acts or inadvertence of others), we could suffer from civil and criminal penalties or other sanctions, including contract cancellations or debarment, and loss of reputation, any of which could have a material adverse impact on our business, financial condition, and results of operations.

The loss of or a significant reduction in business from one or a few customers could have a material adverse impact on us.

A few clients have in the past and may in the future account for a significant portion of our revenue and/or backlog in any one year or over a period of several consecutive years. For example, in fiscal 2016, 2015, and 2014, approximately

Page 24


21.4%, 21.7%, and 17.8%, respectively, of our revenue was earned directly or indirectly from agencies of the U.S. federal government. Although we have long-standing relationships with many of our significant clients, our clients may unilaterally reduce, delay, or cancel their contracts at any time. Our loss of or a significant reduction in business from a significant client could have a material adverse impact on our business, financial condition, and results of operations.

Our international operations are exposed to additional risks and uncertainties, including unfavorable political developments and weak foreign economies.

For fiscal 2016, approximately 43.0% of our revenue was earned from clients outside the U.S. Our business is dependent on the continued success of our international operations, and we expect our international operations to continue to account for a significant portion of our total revenues. Our international operations are subject to a variety of risks, including:

 

Recessions and other economic crises in other regions, such as Europe, or specific foreign economies and the impact on our costs of doing business in those countries;

 

Difficulties in staffing and managing foreign operations, including logistical and communication challenges;

 

Unexpected changes in foreign government policies and regulatory requirements;

 

Potential non-compliance with a wide variety of laws and regulations, including anti-corruption, export control and anti-boycott laws and similar non-U.S. laws and regulations;

 

Lack of developed legal systems to enforce contractual rights;

 

Expropriation and nationalization of our assets in a foreign country;

 

Renegotiation or nullification of our existing contracts;

 

The adoption of new, and the expansion of existing, trade or other restrictions;

 

Embargoes;

 

Changes in labor conditions;

 

Acts of war, civil unrest, force majeure, and terrorism;

 

The ability to finance efficiently our foreign operations;

 

Social, political, and economic instability;

 

Expropriation of property;

 

Tax increases;

 

Currency exchanges rate fluctuations;

 

Limitations on the ability to repatriate foreign earnings; and

 

U.S. government policy changes in relation to the foreign countries in which we operate, including embargoes or other trade restrictions.

The lack of a well-developed legal system in some of these countries may make it difficult to enforce our contractual rights. In addition, military action or continued unrest, particularly in the Middle East, could impact the supply or pricing of oil, disrupt our operations in the region and elsewhere. To the extent our international operations are affected by unexpected or adverse economic, political and other conditions, our business, financial condition, and results of operations may be adversely affected.

We work in international locations where there are high security risks, which could result in harm to our employees or unanticipated cost.

Some of our services are performed in high-risk locations, where the country or location is subject to political, social or economic risks, or war or civil unrest. In those locations where we have employees or operations, we may expend significant efforts and incur substantial security costs to maintain the safety of our personnel. Despite these activities, in these locations, we cannot guarantee the safety of our personnel and we may suffer future losses of employees and subcontractors. Acts of terrorism and threats of armed conflicts in or around various areas in which we operate could limit or disrupt markets and our

Page 25


operations, including disruptions resulting from the evacuation of personnel, cancellation of contracts, or the loss of key employees, contractors or assets.

Foreign exchange risks may affect our ability to realize a profit from certain projects.

Our reported financial condition and results of operations are exposed to the effects (both positive and negative) that fluctuating exchange rates have on the process of translating the financial statements of our international operations, which are denominated in currencies other than the U.S. dollar, into the U.S. dollar. While we generally attempt to denominate our contracts in the currencies of our expenditures, we do enter into contracts that expose us to currency risk, particularly to the extent contract revenue is denominated in a currency different than the contract costs. We attempt to minimize our exposure from currency risks by obtaining escalation provisions for projects in inflationary economies or entering into derivative (hedging) instruments, when there is currency risk exposure that is not naturally mitigated via our contracts. These actions, however, may not always eliminate currency risk exposure. The governments of certain countries have or may in the future impose restrictive exchange controls on local currencies and it may not be possible for us to engage in effective hedging transactions to mitigate the risks associated with fluctuations in a particular currency. Based on fluctuations in currency, the U.S. dollar value of our backlog may from time to time increase or decrease significantly. We may also be exposed to limitations on our ability to reinvest earnings from operations in one country to fund the financing requirements of our operations in other countries.

Our operations may be impacted by the United Kingdom’s proposed exit from the European Union.

In June 2016, the U.K. held a referendum in which voters approved an exit from the E.U., commonly referred to as “Brexit.” As a result of the referendum, there may be greater restrictions on imports and exports between the U.K. and E.U. countries and increased regulatory complexities. These changes may adversely affect our relationships with our existing and future customers, suppliers, employees, and subcontractors, or otherwise have an adverse effect on our business, financial condition and results of operations. Brexit may also create global economic uncertainty, which may cause our customers to closely monitor their costs, terminate or reduce the scope of existing contracts, decrease or postpone currently planned contracts, or negotiate for more favorable deal terms, each of which may have a negative impact on our business, financial condition and results of operations.

Our business strategy relies in part on acquisitions to sustain our growth. Acquisitions of other companies present certain risks and uncertainties.

Our business strategy involves growth through, among other things, the acquisition of other companies. Acquiring companies presents a number of risks, including:

 

Assumption of liabilities of an acquired business, including liabilities that were unknown at the time the acquisition was negotiated;

 

Valuation methodologies may not accurately capture the value of the acquired business;

 

Failure to realize anticipated benefits, such as cost savings and revenue enhancements;

 

Difficulties relating to combining previously separate entities into a single, integrated, and efficient business;

 

The effects of diverting management’s attention from day-to-day operations to matters involving the integration of acquired companies;

 

Potentially substantial transaction costs associated with business combinations;

 

Potential impairment resulting from the overpayment for an acquisition or post-acquisition deterioration in an acquired business;

 

Difficulties relating to assimilating the personnel, services, and systems of an acquired business and to assimilating marketing and other operational capabilities;

 

Difficulties retaining key personnel of an acquired business;

 

Increased burdens on our staff and on our administrative, internal control and operating systems, which may hinder our legal and regulatory compliance activities;

 

Difficulties in applying and integrating our system of internal controls to an acquired business;

Page 26


 

Increased financial and accounting challenges and complexities in areas such as tax planning, treasury management, financial reporting and internal controls; and

 

The potential requirement for additional equity or debt financing, which may not be available, or if available, may not have favorable terms.

While we may obtain indemnification rights from the sellers of acquired businesses, such rights may be difficult to enforce, the losses may exceed any dedicated escrow funds, and the indemnitors may not have the ability to financially support the indemnity.

If our management is unable to successfully integrate acquired companies or implement our growth strategy, our operating results could be harmed. In addition, even if the operations of an acquisition are integrated successfully, we may not realize the full benefits of an acquisition, including the synergies, cost savings, or sales or growth opportunities that we expect. These benefits may not be achieved within the anticipated time frame, or at all. Moreover, we cannot assure that we will continue to successfully expand or that growth or expansion will result in profitability.

In addition, there is no assurance that we will continue to locate suitable acquisition targets or that we will be able to consummate any such transactions on terms and conditions acceptable to us. Existing cash balances and cash flow from operations, together with borrowing capacity under our credit facilities, may be insufficient to make acquisitions. Future acquisitions may require us to obtain additional equity or debt financing, which may not be available on attractive terms, or at all.  Acquisitions may also bring us into businesses we have not previously conducted and expose us to additional business risks that are different than those we have traditionally experienced.

In the event we issue stock as consideration for certain acquisitions we may make, we could dilute share ownership.

One method of acquiring companies or otherwise funding our corporate activities is through the issuance of additional equity securities. If we issue additional equity securities, such issuances could have the effect of diluting our earnings per share as well as our existing shareholders’ individual ownership percentages in the Company.

Our quarterly results may fluctuate significantly, which could have a material negative effect on the price of our common stock.

Our quarterly operating results may fluctuate significantly, which could cause our operating results to fall below the expectations of securities analysts and have a material negative effect on the price of our common stock. Fluctuations are caused by a number of factors, including:

 

Fluctuations in the spending patterns of our government and commercial customers;

 

The number and significance of projects executed during a quarter;

 

Unanticipated changes in contract performance, particularly with contracts that have funding limits;

 

The timing of resolving change orders, requests for equitable adjustments, and other contract adjustments;

 

Delays incurred in connection with a project;

 

Changes in prices of commodities or other supplies;

 

Changes in foreign currency exchange rates;

 

Weather conditions that delay work at project sites;

 

The timing of expenses incurred in connection with acquisitions or other corporate initiatives;

 

The decision by the Board of Directors to begin or cease paying a dividend, and the expectation that if the Company pays dividends, it would declare dividends at the same or higher levels in the future;

 

Natural disasters or other crises;

 

Staff levels and utilization rates;

 

Changes in prices of services offered by our competitors; and

 

General economic and political conditions.

Page 27


Our actual results could differ from the estimates and assumptions used to prepare our financial statements.

In preparing our financial statements, our management is required under U.S. GAAP to make estimates and assumptions as of the date of the financial statements. These estimates and assumptions affect the reported values of assets, liabilities, revenue, and expenses and disclosure of contingent assets and liabilities. Areas requiring significant estimates by our management include:

 

Recognition of contract revenue, costs, profit or losses in applying the principles of percentage of completion accounting;

 

Estimated amounts for expected project losses, warranty costs, contract close-out or other costs;

 

Recognition of recoveries under contract change orders or claims;

 

Collectability of billed and unbilled accounts receivable and the need and amount of any allowance for doubtful accounts;

 

Estimates of other liabilities, including litigation and insurance revenues/reserves and reserves necessary for self-insured risks;

 

Accruals for estimated liabilities, including litigation reserves;

 

Valuation of assets acquired, and liabilities, goodwill, and intangible assets assumed, in acquisitions;

 

Valuation of stock-based compensation;

 

The determination of liabilities under pension and other post-retirement benefit programs; and

 

Income tax provisions and related valuation allowances.

Our actual business and financial results could differ from our estimates of such results, which could have a material negative impact on our financial condition and results of operations.

We may be adversely impacted by, or unable to fully realize the benefits of, our corporate reorganization.

In the second quarter of fiscal 2016, we reorganized the Company’s operating units into four lines of business, each of which is a separate reportable segment. We may be unable to realize the anticipated longer term efficiency benefits of the reorganization.  Furthermore, our reorganization into four reportable segments, which also represent the Company’s reporting units, may have a material impact on the risk that an impairment charge of goodwill will occur.  In the past, with a single reportable segment the Company had two reporting units. Following the reorganization, our number of reporting units has increased to four reporting units. Our goodwill was allocated amongst the new reporting units, for purposes of goodwill impairment testing, on the basis of Enterprise Fair Values. This allocation of goodwill to the four new reporting units could make it more likely that the Company will have an impairment charge in the future, in circumstances where an impairment charge may not have been necessary prior to the reorganization. An impairment charge to one of our reporting units could have an impact on our results of operations.

An impairment charge of goodwill could have a material adverse impact on our financial condition and results of operations.

Because we have grown in part through acquisitions, goodwill and intangible assets represent a substantial portion of our assets. Under U.S. GAAP, we are required to test goodwill carried in our Consolidated Balance Sheets for possible impairment on an annual basis based upon a fair value approach. As of September 30, 2016, we had $3.1 billion of goodwill, representing 41.8% of our total assets of $7.4 billion. We have chosen to perform our annual impairment reviews of goodwill at the end of the third quarter of our fiscal year. We also are required to test goodwill for impairment between annual tests if events occur or circumstances change that would more likely than not reduce our enterprise fair value below its book value. These events or circumstances could include a significant change in the business climate, including a significant sustained decline in a reporting unit’s market value, legal factors, operating performance indicators, competition, sale or disposition of a significant portion of our business, potential government actions toward our facilities, and other factors.

If our market capitalization drops significantly below the amount of net equity recorded on our balance sheet, it might indicate a decline in our fair value and would require us to further evaluate whether our goodwill has been impaired. If the fair value of our reporting units is less than their carrying value, we could be required to record an impairment charge. The

Page 28


amount of any impairment could be significant and could have a material adverse impact on our financial condition and results of operations for the period in which the charge is taken. For a further discussion of goodwill impairment testing, please see Item 7— Management’s Discussion and Analysis of Financial Condition and Results of Operations below.

We may be required to contribute additional cash to meet any underfunded benefit obligations associated with retirement and post-retirement benefit plans we manage.

We have various employee benefit plan obligations that require us to make contributions to satisfy, over time, our underfunded benefit obligations, which are generally determined by calculating the projected benefit obligations minus the fair value of plan assets. For example, as of September 30, 2016 and October 2, 2015, our defined benefit pension and post-retirement benefit plans were underfunded by $403.1 million and $413.1 million, respectively. See Note 6— Pension Plans of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K for additional disclosure. In the future, our benefit plan obligations may increase or decrease depending on changes in the levels of interest rates, pension plan asset performance and other factors. If we are required to contribute a significant amount of the deficit for underfunded benefit plans, our cash flows could be materially and adversely affected.

Rising inflation, interest rates, and/or construction costs could reduce the demand for our services as well as decrease our profit on our existing contracts, in particular with respect to our fixed-price contracts.

Rising inflation, interest rates, or construction costs could reduce the demand for our services. In addition, we bear all of the risk of rising inflation with respect to those contracts that are fixed-price. Because a significant portion of our revenues are earned from cost-reimbursable type contracts (approximately 82% during fiscal 2016), the effects of inflation on our financial condition and results of operations over the past few years have been generally minor. However, if we expand our business into markets and geographic areas where fixed-price and lump-sum work is more prevalent, inflation may have a larger impact on our results of operations in the future. Therefore, increases in inflation, interest rates or construction costs could have a material adverse impact on our business, financial condition, and results of operations.

We may be affected by market or regulatory responses to climate change.

Growing concerns about climate change may result in the imposition of additional environmental regulations. For example, there is a growing consensus that new and additional regulations may be enacted concerning, among other things, greenhouse gas emissions could result in increased compliance costs for us and our clients. Legislation, international protocols, regulation or other restrictions on emissions could also affect our clients, including those who are involved in the exploration, production or refining of fossil fuels, emit greenhouse gases through the combustion of fossil fuels or emit greenhouse gases through the mining, manufacture, utilization or production of materials or goods. Such policy changes could increase the costs of projects for our clients or, in some cases, prevent a project from going forward, thereby potentially reducing the need for our services, which would in turn have a material adverse impact on our business, financial condition, and results of operations. However, these changes could also increase the pace of projects, such as carbon capture or storage projects, that could have a positive impact on our business. We cannot predict when or whether any of these various proposals may be enacted or what their effect will be on us or on our customers.

Our effective tax rate may increase or decrease.

We are subject to income taxes in the U.S. and numerous foreign jurisdictions. Significant judgment is required in determining our worldwide provision for income taxes. In the ordinary course of our business, there are many transactions and calculations where the ultimate tax determination is uncertain. We are regularly under audit by tax authorities. Although we believe that our tax estimates and tax positions are reasonable, they could be materially affected by many factors including the final outcome of tax audits and related litigation, the introduction of new tax accounting standards, legislation, regulations, and related interpretations, our global mix of earnings, the realizability of deferred tax assets and changes in uncertain tax positions. An increase or decrease in our effective tax rate could have a material adverse impact on our financial condition and results of operations.

Systems and information technology interruption or failure and data security breaches could adversely impact our ability to operate or expose us to significant financial losses and reputational harm.

We rely heavily on computer, information, and communications technology and related systems in order to properly operate our business. From time to time, we experience occasional system interruptions and delays. In the event we are unable to regularly deploy software and hardware, effectively upgrade our systems and network infrastructure, and take other

Page 29


steps to maintain or improve the efficiency and efficacy of our systems, the operation of such systems could be interrupted or result in the loss, corruption, or release of data. In addition, our computer and communication systems and operations could be damaged or interrupted by natural disasters, force majeure events, telecommunications failures, power loss, acts of war or terrorism, computer viruses, malicious code, physical or electronic security breaches, intentional or inadvertent user misuse or error, or similar events or disruptions. Any of these or other events could cause interruptions, delays, loss of critical and/or sensitive data or similar effects, which could have a material adverse impact on our business, financial condition, protection of intellectual property, and results of operations, as well as those of our clients.

In addition, we face the threat to our computer systems of unauthorized access, computer hackers, computer viruses, malicious code, organized cyber-attacks and other security problems and system disruptions, including possible unauthorized access to and disclosure of our and our clients’ proprietary or classified information. We rely on industry accepted security measures and technology to securely maintain all confidential and proprietary information on our computer systems, but they may still be vulnerable to these threats. As a result, we may be required to expend significant resources to protect against the threat of these system disruptions and security breaches or to alleviate problems caused by these disruptions and breaches. Any of these events could damage our reputation and have a material adverse effect on our business, financial condition, results of operations and cash flows.

We continuously evaluate the need to upgrade and/or replace our systems and network infrastructure to protect our computing environment, to stay current on vendor supported products and to improve the efficiency of our systems and for other business reasons. The implementation of new systems and information technology could adversely impact our operations by imposing substantial capital expenditures, demands on management time and risks of delays or difficulties in transitioning to new systems. And, our systems implementations may not result in productivity improvements at the levels anticipated. Systems implementation disruption and any other information technology disruption, if not anticipated and appropriately mitigated, could have an adverse effect on our business.

We may not be able to protect our intellectual property or that of our clients.

Our technology and intellectual property provide us, in certain instances, with a competitive advantage. Although we protect our property through patent registrations, license restrictions, and similar mechanisms, we may not be able to successfully preserve our rights and they could be invalidated, circumvented, challenged or become obsolete. Our employees and contractors are subject to confidentiality obligations, but this protection may be inadequate to deter or prevent misappropriation of our confidential information and/or infringement of our intellectual property. In addition, the laws of some foreign countries in which we operate do not protect intellectual property rights to the same extent as the U.S. If we are unable to protect and maintain our intellectual property rights or if there are any successful intellectual property challenges or infringement proceedings against us, our ability to differentiate our service offerings could be reduced. Litigation to determine the scope of intellectual property rights, even if ultimately successful, could be costly and could divert management’s attention away from other aspects of our business.

In addition, if our intellectual property rights or work processes become obsolete, we may not be able to differentiate our service offerings and some of our competitors may be able to offer more attractive services to our customers. Our competitors may independently attempt to develop or obtain access to technologies that are similar or superior to our technologies.

Our clients or other third parties may also provide us with their technology and intellectual property. There is a risk we may not sufficiently protect our or their information from improper use or dissemination and, as a result, could be subject to claims and litigation and resulting liabilities, loss of contracts or other consequences that could have an adverse impact on our business, financial condition, and results of operations.

Our businesses could be materially and adversely affected by events outside of our control.

Extraordinary or force majeure events beyond our control, such as natural or man-made disasters, could negatively impact our ability to operate. As an example, from time to time we face unexpected severe weather conditions which may result in weather-related delays that are not always reimbursable under a fixed-price contract; evacuation of personnel and curtailment of services; increased labor and material costs in areas resulting from weather-related damage and subsequent increased demand for labor and materials for repairing and rebuilding; inability to deliver materials, equipment and personnel to jobsites in accordance with contract schedules; and loss of productivity. We may remain obligated to perform our services after any such natural or man-made event, unless a force majeure clause or other contractual provision provides us with relief from our contractual obligations. If we are not able to react quickly to such events, or if a high concentration of our projects

Page 30


are in a specific geographic region that suffers from a natural or man-made catastrophe, our operations may be significantly affected, which could have a negative impact on our operations. In addition, if we cannot complete our contracts on time, we may be subject to potential liability claims by our clients which may reduce our profits.

We are subject to professional standards, duties and statutory obligations on professional reports and opinions we issue, which could subject us to monetary damages.

We issue reports and opinions to clients based on our professional engineering expertise as well as our other professional credentials that subject us to professional standards, duties and obligations regulating the performance of our services. For example, we issue opinions and reports to government clients in connection with securities offerings. If a client or another third party alleges that our report or opinion is incorrect or it is improperly relied upon and we are held responsible, we could be subject to significant monetary damages. In addition, our reports and other work product may need to comply with professional standards, licensing requirements, securities regulations and other laws and rules governing the performance of professional services in the jurisdiction where the services are performed. We could be liable to third parties who use or rely upon our reports and other work product even if we are not contractually bound to those third parties. These events could in turn result in monetary damages and penalties.

Delaware law and our charter documents may impede or discourage a takeover or change of control.

We are a Delaware corporation. Certain anti-takeover provisions of the Delaware general corporation law impose restrictions on the ability of others to acquire control of us. In addition, certain provisions of our charter documents may impede or discourage a takeover. For example:

 

Only our Board of Directors can fill vacancies on the board;

 

There are various restrictions on the ability of a shareholder to nominate a director for election; and

 

Our Board of Directors can authorize the issuance of preferred shares.

These types of provisions, as well as our ability to adopt a shareholder rights agreement in the future, could make it more difficult for a third party to acquire control of us, even if the acquisition would be beneficial to our shareholders. Accordingly, shareholders may be limited in the ability to obtain a premium for their shares.

 

 

Item 1B.

UNRESOLVED STAFF COMMENTS

None.

 

 

 

Item 2.

PROPERTIES

Our properties consist primarily of office space within general, commercial office buildings located in major cities primarily in the following countries: United States; Australia; Austria; Belgium; Canada; Chile; China; Finland; Germany; Greece; India; Italy; Malaysia; Mexico; Morocco; The Netherlands; Oman; The Philippines; Puerto Rico; Peru; Republic of Ireland; Saudi Arabia; South Africa; Singapore; Spain; Sweden; United Arab Emirates; and the United Kingdom. Such space is used for operations (providing technical, professional, and other home office services), sales, and administration. Most of our properties are leased. In addition, we have fabrication facilities located in Canada in Pickering, Ontario and Edmonton and Lamont, Alberta. The total amount of space used by us for all of our operations is approximately 7.6 million square feet.

We also lease smaller, project offices located throughout the U.S., the U.K., and in certain other countries. We also rent most of our construction equipment on a short-term basis.

 

 

Item 3.

LEGAL PROCEEDINGS

The information required by this Item 3 is included in Note 12 — Contractual Guarantees, Litigation, Investigations, and Insurance of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K and is incorporated herein by reference.

 

 

Page 31


Item 4.

MINE SAFETY DISCLOSURE

Section 1503 of the Dodd-Frank Wall Street Reform and Consumer Protection Act (the “Dodd-Frank Act”) requires domestic mine operators to disclose violations and orders issued under the Federal Mine Safety and Health Act of 1977 (the “Mine Act”) by the federal Mine Safety and Health Administration. Under the Mine Act, an independent contractor, such as Jacobs, that performs services or construction of a mine is included within the definition of a mining operator. We do not act as the owner of any mines.

Information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Act and Item 104 of Regulation S-K is included in Exhibit 95.

 

 

Page 32


PART II

Item 5.

MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Market Information

Jacobs’ common stock is listed on the NYSE and trades under the symbol JEC. We provided to the NYSE, without qualification, the required annual certification of our Chief Executive Officer regarding compliance with the NYSE’s corporate governance listing standards. The following table sets forth the low and high sales prices of a share of our common stock during each of the fiscal quarters presented, based on the NYSE Composite Price History:  

 

 

 

Low Sales

 

 

High Sales

 

 

 

Price

 

 

Price

 

Fiscal 2016:

 

 

 

 

 

 

 

 

First quarter

 

$

37.51

 

 

$

45.41

 

Second quarter

 

 

34.76

 

 

 

44.77

 

Third quarter

 

 

40.93

 

 

 

53.33

 

Fourth quarter

 

 

48.13

 

 

 

55.89

 

Fiscal 2015:

 

 

 

 

 

 

 

 

First quarter

 

$

39.78

 

 

$

49.94

 

Second quarter

 

 

37.87

 

 

 

45.49

 

Third quarter

 

 

41.68

 

 

 

48.25

 

Fourth quarter

 

 

36.05

 

 

 

44.64

 

 

Shareholders

According to the records of our transfer agent, there were 1,073 shareholders of record as of November 18, 2016.

Share Repurchases

On July 23, 2015, the Board of Directors approved a program to repurchase up to $500 million of the Company’s common stock over the next three years.  Share repurchases may be executed through various means including, without limitation, open market transactions or otherwise.  The share repurchase program, which expires on July 22, 2018, does not oblige the Company to purchase any shares.  The authorization for the share repurchase program may be terminated, increased, or decreased by the Company’s Board of Directors in its discretion at any time.  The timing of our share repurchases may depend upon the market conditions, other uses of capital, and other factors.

A summary of repurchases of our common stock each fiscal month during the fourth quarter of fiscal 2016 is as follows (in thousands, except per-share amounts):

 

Period

 

Total

Number of

Shares

Purchased

 

 

Average

Price Paid

per Share (1)

 

 

Total Numbers

of Shares

Purchased as

Part of Publicly

Announced

Plans or

Programs

 

 

Approximate

Dollar Value

of Shares

that May Yet

Be

Purchased

Under the

Plans or

Programs

($ in thousands)

 

July 2 through July 29, 2016

 

 

227

 

 

$

52.30

 

 

 

227

 

 

$

385,665

 

July 30 through August 26, 2016

 

 

213

 

 

$

53.77

 

 

 

213

 

 

$

374,211

 

August 27 through September 30, 2016

 

 

522

 

 

$

51.32

 

 

 

522

 

 

$

347,451

 

Total

 

 

962

 

 

$

52.10

 

 

 

962

 

 

$

347,451

 

 

(1)

Includes commissions paid and calculated at the average price per share since the repurchase program authorization date.

Page 33


Dividends

Our current policy is to use cash flows from operations to fund future growth, pay down debt, and, subject to market conditions, repurchase common stock under a stock buy-back program approved by our Board of Directors.  During fiscal 2016, the Company undertook a strategic review to evaluate, among other things, how to invest its resources and maximize returns.  As part of that evaluation, management has been reviewing and considering the continued use of the share repurchase program and the possible initiation of a cash dividend.  The Company expects to present its strategy and corporate goals at its Investor Day, to be held on December 1, 2016.

Unregistered Sales of Equity Securities.

None.

Performance Graph

The following graph and table shows the changes over the past five-year period in the value of $100 invested at the end of fiscal 2011 in (1) the common stock of Jacobs Engineering Group Inc., (2) the Standard & Poor’s 500 Index, and (3) the Dow Jones Heavy Construction Group Index. The values of each investment are based on share price appreciation, with reinvestment of all dividends, provided any were paid. The investments are assumed to have occurred at the beginning of the period presented. The stock performance included in this graph is not necessarily indicative of future stock price performance.

 

 

 

 

2011

 

 

2012

 

 

2013

 

 

2014

 

 

2015

 

 

2016

 

Jacobs Engineering Group Inc.

 

 

100.00

 

 

 

125.21

 

 

 

180.18

 

 

 

151.19

 

 

 

115.92

 

 

 

160.17

 

S&P 500

 

 

100.00

 

 

 

130.20

 

 

 

155.39

 

 

 

186.05

 

 

 

184.91

 

 

 

213.44

 

Dow Jones US Heavy Construction

 

 

100.00

 

 

 

131.89

 

 

 

166.14

 

 

 

158.59

 

 

 

117.78

 

 

 

133.61

 

 

Note: The above information was provided by Research Data Group, Inc.

 

 

 

 

 

Page 34


Item 6.

SELECTED FINANCIAL DATA

The following table presents selected financial data for each of the last five fiscal years. This selected financial data should be read in conjunction with the Consolidated Financial Statements and related notes beginning on page F-1 of this Annual Report on Form 10-K. Dollar amounts are presented in thousands, except for per share information:

 

 

 

2016 (a)

 

 

2015 (b)

 

 

2014 (c)

 

 

2013

 

 

2012 (d)

 

Results of Operations:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenues

 

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

 

$

11,818,376

 

 

$

10,893,778

 

Net earnings attributable to Jacobs

 

 

210,463

 

 

 

302,971

 

 

 

328,108

 

 

 

423,093

 

 

 

378,954

 

Financial Position:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Current ratio

 

1.61 to 1

 

 

1.58 to 1

 

 

1.58 to 1

 

 

2.07 to 1

 

 

1.99 to 1

 

Working capital

 

 

1,081,784

 

 

 

1,141,512

 

 

 

1,372,332

 

 

 

2,020,853

 

 

 

1,722,656

 

Current assets

 

 

2,864,470

 

 

 

3,122,678

 

 

 

3,722,178

 

 

 

3,908,473

 

 

 

3,469,708

 

Total assets

 

 

7,360,022

 

 

 

7,785,926

 

 

 

8,453,659

 

 

 

7,274,144

 

 

 

6,839,433

 

Cash

 

 

655,716

 

 

 

460,859

 

 

 

732,647

 

 

 

1,256,405

 

 

 

1,032,457

 

Long-term debt

 

 

385,330

 

 

 

584,434

 

 

 

764,075

 

 

 

415,086

 

 

 

528,260

 

Total Jacobs stockholders’ equity

 

 

4,265,276

 

 

 

4,291,745

 

 

 

4,469,255

 

 

 

4,213,097

 

 

 

3,722,473

 

Return on average equity

 

 

4.92

%

 

 

6.92

%

 

 

7.56

%

 

 

10.66

%

 

 

10.77

%

Backlog:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Technical professional services

 

 

12,013,121

 

 

 

11,692,404

 

 

 

12,607,029

 

 

 

11,118,400

 

 

 

10,266,500

 

Field services

 

 

6,747,408

 

 

 

7,114,166

 

 

 

5,773,005

 

 

 

6,099,500

 

 

 

5,643,200

 

Total

 

 

18,760,529

 

 

 

18,806,570

 

 

 

18,380,034

 

 

 

17,217,900

 

 

 

15,909,700

 

Per Share Information:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic earnings per share

 

 

1.75

 

 

 

2.42

 

 

 

2.51

 

 

 

3.27

 

 

 

2.97

 

Diluted earnings per share

 

 

1.73

 

 

 

2.40

 

 

 

2.48

 

 

 

3.23

 

 

 

2.94

 

Stockholders’ equity

 

 

35.26

 

 

 

34.85

 

 

 

33.92

 

 

 

32.00

 

 

 

28.65

 

Average Number of Shares of Common Stock and

   Common Stock Equivalents Outstanding (Diluted)

 

 

121,483

 

 

 

126,110

 

 

 

132,371

 

 

 

130,945

 

 

 

128,692

 

Common Shares Outstanding At Year End

 

 

120,951

 

 

 

123,153

 

 

 

131,753

 

 

 

131,639

 

 

 

129,936

 

___________

(a)

Includes costs of $135.6 million or $1.12 per diluted share, related to the Company's restructuring initiatives in the first, second, third and fourth quarter of fiscal 2016.  Also included in the fourth quarter of fiscal 2016 are (i) a loss on sale of our French subsidiary of $17.1 million or $0.14 per diluted share; and (ii) a non-cash write-off on an equity investment of $10.4 million or $0.09 per diluted share.

(b)

Includes costs of $107.9 million or $0.86 per diluted share, related to the Company's restructuring initiatives in the second, third and fourth quarters of fiscal 2015.

(c)

Includes costs of $109.2 million or $0.82 per diluted share, related to the Company's restructuring initiatives in the third and fourth quarter of fiscal 2014.

(d)

Includes a one-time, after-tax gain of $4.0 million, or $0.03 per diluted share, related to the sale of the Company's intellectual property for iron ore pelletizing and certain other related assets.

 

 

 

Page 35


Item 7.

MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Critical Accounting Policies and Estimates

In order to understand better the changes that occur to key elements of our financial condition, results of operations, and cash flows, a reader of this Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) should be aware of the critical accounting policies we apply in preparing our consolidated financial statements.

The consolidated financial statements contained in this report were prepared in accordance with U.S. GAAP. The preparation of our consolidated financial statements and the financial statements of any business performing long-term engineering and construction-type contracts requires management to make certain estimates and judgments that affect both the entity’s results of operations and the carrying values of its assets and liabilities. Although our significant accounting policies are described in Note 2 – Significant Accounting Policies of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K, the following discussion is intended to highlight and describe those accounting policies that are especially critical to the preparation of our consolidated financial statements.

Revenue Accounting for Contracts and Use of Joint Ventures —In general, we recognize revenues at the time we provide services. Depending on the commercial terms of the contract, we recognize revenues either when costs are incurred, or using the percentage-of-completion method of accounting by relating contract costs incurred to date to the total estimated costs at completion. This method of revenue recognition requires us to prepare estimates of costs to complete contracts in progress as of the balance sheet dates. In making such estimates, judgments are required to evaluate the possible effects of variances in schedule, the costs of materials and labor, productivity, and the impact of change orders, claims, contract disputes, and achievement of contractual performance standards. Many of our engineering and construction contracts provide for reimbursement of costs plus a fixed or percentage fee. For contracts containing incentive fee arrangements, fees are frequently based on achievement of target completion dates, target costs, and/or other performance criteria. Failure to meet these targets or increases in contract costs can result in unrealized incentive fees or non-recoverable costs, which could exceed revenues recognized from the project.

We provide for contract losses in their entirety in the period they become known without regard to the percentage of completion. For multiple contracts with a single customer, we account for each contract separately.

The nature of our business sometimes results in clients, subcontractors or vendors presenting claims to us for recovery of costs they incurred in excess of what they expected to incur, or for which they believe they are not contractually responsible. In those situations where a claim against us may result in additional costs to the contract, we include in the total estimated costs of the contract (and therefore, the estimated amount of margin to be earned under the contract) an estimate, based on all relevant facts and circumstances available, of the additional costs to be incurred. Similarly, and in the normal course of business, we may present claims to our clients for costs we have incurred for which we believe we are not contractually responsible. In those situations where we have presented such claims to our clients, we include in revenues the amount of costs incurred, without profit, to the extent it is probable that the claims will result in additional contract revenue, and the amount of such additional revenue can be reliably estimated. Costs associated with unapproved change orders are included in revenues using substantially the same criteria used for claims.

Certain cost-reimbursable contracts with government customers as well as many commercial clients provide that contract costs are subject to audit and adjustment. In this situation, revenues are recorded at the time services are performed based upon the amounts we expect to realize upon completion of the contracts. In those situations where an audit indicates that we may have billed a client for costs that are not allowable under the terms of the contract, we estimate the amount of such nonbillable costs and adjust our revenues accordingly.

As is common to the industry, we execute certain contracts jointly with third parties through various forms of joint ventures and consortiums. Although the joint ventures own and hold the contracts with the clients, the services required by the contracts are typically performed by us and our joint venture partners, or by other subcontractors under subcontracting agreements with the joint ventures. The assets of our joint ventures, therefore, consist almost entirely of cash and receivables (representing amounts due from clients), and the liabilities of our joint ventures consist almost entirely of amounts due to the joint venture partners (for services provided by the partners to the joint ventures under their individual subcontracts) and other subcontractors. In general, at any given time, the equity of our joint ventures represents the undistributed profits earned on contracts the joint ventures hold with clients. Very few of our joint ventures have employees. None of our joint ventures have third-party debt or credit facilities. Our joint ventures, therefore, are simply mechanisms used to deliver engineering and construction services to clients. Generally they do not, in and of themselves, present any risk of loss to us or to our partners

Page 36


separate from those that we would carry if we were performing the contract on our own. We may, however, be exposed to additional risk through the use of joint ventures. See Item 1A – Risk Factors above.  Under U.S. GAAP, our share of losses associated with the contracts held by the joint ventures, if and when they occur, has always been reflected in our Consolidated Financial Statements.

In evaluating the Company's joint ventures (also referred to as "variable interest entities", or "VIEs") for accounting and consolidation purposes, we perform a qualitative analysis to determine whether or not the Company has a “controlling financial interest” in the VIE. The Company is deemed to have a controlling financial interest in a VIE if it has (i) the power to direct the activities of the VIE that most significantly impact the VIE's economic performance; and (ii) the right to receive benefits, or obligation to absorb losses, that could potentially be significant to the VIE. In making our qualitative analysis, the Company assesses each VIE to determine those activities that most significantly impact the VIE's economic performance and whether the Company, another entity, or multiple entities have the power to direct those activities.

If we determine that we have the power to direct those activities of the VIE that most significantly impact its financial performance and have the right or obligation to receive benefits or absorb losses that could potentially be significant to the VIE, then we are the primary beneficiary of the VIE and we consolidate the VIE. If we determine that we do not have the power to direct the most significant activities of the VIE or power is shared by two or more unrelated parties, then we are not the primary beneficiary and we do not consolidate the VIE.

For the Company's unconsolidated joint ventures, we use either the equity method of accounting or proportional consolidation. The Company does not currently participate in any significant VIEs in which it has a controlling financial interest. There were no changes in facts and circumstances in the period that caused the Company to reassess the method of accounting for its VIEs.

Accounting for Stock Issued to Employees and Others — We measure the cost of employee services received in exchange for an award of equity instruments based on the estimated grant-date fair value of the award. We estimate the fair value of stock options granted to employees and directors using the Black-Scholes option-pricing model. Like all option-pricing models, the Black-Scholes model requires the use of subjective assumptions including (i) the expected volatility of the market price of the underlying stock, and (ii) the expected term of the award, among others. Accordingly, changes in assumptions and any subsequent adjustments to those assumptions can cause different fair values to be assigned to our stock option awards. For restricted stock units containing service and performance conditions with measures external to the Company, compensation expense is based on the fair value of such units determined using Monte Carlo Simulations.

Accounting for Pension Plans — the accounting for pension plans requires the use of assumptions and estimates in order to calculate periodic pension cost and the value of the plans’ assets and liabilities. These assumptions include discount rates, investment returns, and projected salary increases, among others. The actuarial assumptions used in determining the funded statuses of the plans are provided in Note 7 – Pension Plans of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K.

The expected rates of return on plan assets for fiscal 2017 range from 3.5% to 8.5% compared to 3.5% to 8.5% for the prior year. We believe the range of rates selected for fiscal 2017 reflects the long-term returns expected on the plans’ assets, considering recent market conditions, projected rates of inflation, the diversification of the plans’ assets, and the expected real rates of market returns. The discount rates used to compute plan liabilities were changed from a range of 1.6% to 7.8% in fiscal 2015 to a range of 0.7% to 7.0% in fiscal 2016. These assumptions represent the Company’s best estimate of the rates at which its pension obligations could be effectively settled.

Changes in the actuarial assumptions often have a material effect on the values assigned to plan assets and liabilities, and the associated pension expense. For example, if the discount rate used to value the net pension benefit obligation (“PBO”) at September 30, 2016, was higher (lower) by 0.5%, the PBO would have been lower (higher) at that date by approximately $124.4 million for non-U.S. plans, and by approximately $9.1 million for U.S. plans. If the expected return on plan assets was higher (lower) by 1.0%, the net periodic pension cost for fiscal 2017 would be lower (higher) by approximately $10.0 million for non-U.S. plans, and by approximately $1.3 million for U.S. plans. Differences between actuarial assumptions and actual performance (i.e., actuarial gains and losses) that are not recognized as a component of net periodic pension cost in the period in which such differences arise are recorded to accumulated other comprehensive income (loss) and are recognized as part of net periodic pension cost in future periods in accordance with U.S. GAAP. Management monitors trends in the marketplace within which our pension plans operate in an effort to assure the fairness of the actuarial assumptions used.

Page 37


Contractual Guarantees, Litigation, Investigations, and Insurance — In the normal course of business, we are subject to certain contractual guarantees and litigation. The guarantees to which we are a party generally relate to project schedules and plant performance. Most of the litigation in which we are involved has us as a defendant in workers’ compensation; personal injury; environmental; employment/labor; professional liability; and other similar lawsuits. We maintain insurance coverage for various aspects of our business and operations. We have elected, however, to retain a portion of losses that occur through the use of various deductibles, limits, and retentions under our insurance programs. This situation may subject us to some future liability for which we are only partially insured, or completely uninsured, and we intend to mitigate any such future liability by continuing to exercise prudent business judgment in negotiating the terms and conditions of our contracts.

In accordance with U.S. GAAP, we record in our Consolidated Balance Sheets amounts representing our estimated liability relating to such guarantees, litigation, and insurance claims. We include any adjustments to such liabilities in our consolidated results of operations.

In addition, as a contractor providing services to the U.S. federal government and several of its agencies, we are subject to many levels of audits, investigations, and claims by, or on behalf of, the U.S. federal government with respect to contract performance, pricing, costs, cost allocations, and procurement practices. We adjust revenues based upon the amounts we expect to realize considering the effects of any client audits or governmental investigations.

Testing Goodwill for Possible Impairment — The goodwill carried on our Consolidated Balance Sheets is tested annually for possible impairment. In performing the annual impairment test, we evaluate our goodwill at the reporting unit level. The Company performs the annual goodwill impairment test for the reporting units at the end of the third quarter of our fiscal year. The Company will test goodwill for impairment between annual tests if an event occurs or circumstances change that would more likely than not reduce the fair value of a reporting unit below its carrying amount.

During the second quarter of fiscal 2016, we reorganized our operations around four global lines of business. The four global lines, which represent our reporting units, are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial.   Previously, the Company had two reporting units “Europe” and “Non-Europe”.

In conjunction with the aforementioned reorganization, we performed a quantitative impairment test and we allocated goodwill among our new reporting units based on the relative fair value of the four reporting units. As a result, in the second quarter of fiscal 2016, we performed a quantitative assessment of goodwill for each of the Company’s reporting units (both immediately before and after the reorganization). Based on this quantitative assessment, the fair value of each of the reporting units (pre and post reorganization) exceeded their respective net book values, and accordingly, no impairment charge was necessary as a result of the reorganization.

U.S. GAAP does not prescribe a specific valuation method for estimating the fair value of reporting units. The valuation technique used to estimate the fair value of the reporting units requires the use of significant estimates and assumptions, including revenue growth rates, operating margins, discount rates and future market conditions, among others.

We used both an income approach and a market approach to test our goodwill for possible impairment. Such approaches require us to make estimates and judgments. Under the income approach, fair value is determined by using the discounted cash flows of our reporting units. The Companys discount rate reflects a weighted average cost of capital (WACC) for a peer group of companies representative of the Company’s respective reporting units.  Under the market approach, the fair value of our reporting units is determined by reference to guideline companies that are reasonably comparable to our reporting units; the fair values are estimated based on the valuation multiples of the invested capital associated with the guideline companies. In assessing whether there is an indication that the carrying value of goodwill has been impaired, we utilize the results of both valuation techniques and consider the range of fair values indicated. The fair values for each reporting unit exceeded the respective book values ranging from 28% to 90%.

It is possible that changes in market conditions, economy, facts and circumstances, judgments, and assumptions used in estimating the fair value could change, resulting in possible impairment of goodwill in the future. The fair values resulting from the valuation techniques used are not necessarily representative of the values we might obtain in a sale of the reporting units to willing third parties.

In performing the Company’s annual impairment test as of the end of the third quarter of fiscal 2016 the Company performed a qualitative assessment, and determined that it was more likely than not that the fair value of its reporting units exceeded their carrying amounts. As a result, the Company is not required to proceed to a quantitative impairment assessment.

Page 38


We have determined that the fair value of our reporting units substantially exceeded their respective carrying values for the Balance Sheets presented.

Fiscal 2016

During the second quarter of fiscal 2016, we reorganized our operating and reporting structure around four lines of business (“LOB”). This reorganization is intended to better serve our global clients, leverage our workforce, help streamline operations, and provide enhanced growth opportunities. The four global LOBs are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial. Previously, the Company operated its business as a single segment.

    The 2015 Restructuring and Other Events Affecting Fiscal 2016

During the second quarter of fiscal 2015, the Company commenced a series of initiatives intended to improve operational efficiency, reduce costs, and better position itself to drive growth of the business in the future (the " 2015 Restructuring"). The 2015 Restructuring was not completed in fiscal 2015, and actions related to the 2015 Restructuring continued throughout fiscal 2016.  Actions related to the 2015 Restructuring completed during the fiscal year include involuntary terminations, the abandonment of certain leased offices, combining operational organizations, and the co-location of employees into other existing offices.  The Company's consolidated results of operations for fiscal 2016 include a $187.9 million pre-tax impact relating to costs associated with the 2015 Restructuring.  The majority of the costs of the 2015 Restructuring are included in selling, general, and administrative expense in the accompanying Consolidated Statements of Earnings.  

The Company previously announced on July 15, 2016 that it had sold its Jacobs France subsidiary.  The sale is part of the Company’s strategy to streamline our overall operational efficiency in regions that fit within our target markets and geographies.  The loss on the sale of our French subsidiary was $17.1 million, or $0.14 per diluted share.

          In addition to the 2015 Restructuring and the sale of our French subsidiary, the Company’s consolidated results of operations for fiscal 2016 also include a non-cash write-off on an equity investment of $10.4 million, or $0.09 per share.  The write off of the equity investment and the loss on sale of our French subsidiary are included in Loss on Disposal of Business and Investments on the Consolidated Statements of Earnings.

The following table summarizes the effects of the 2015 Restructuring and other events on the Company's consolidated results of operations for fiscal 2016  and fiscal 2015 (in thousands, except for earnings per share):

 

 

 

Year Ended

 

 

 

September 30, 2016

 

 

 

U.S. GAAP

 

 

Effects of 2015

Restructuring  and other items

 

 

Without 2015

Restructuring and other items

 

Selling, general and administrative

 

$

1,429,233

 

 

$

(187,630

)

 

$

1,241,603

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Earnings Before Taxes

 

 

286,723

 

 

 

(229,317

)

 

 

516,040

 

Income Tax Benefit (Expense)

 

 

(72,208

)

 

 

66,225

 

 

 

(138,433

)

Net earnings of the Group

 

 

214,515

 

 

 

(163,092

)

 

 

377,607

 

Net Earnings Attributable to Noncontrolling Interests

 

 

(4,052

)

 

 

 

 

 

(4,052

)

Net earnings Attributable to Jacobs

 

$

210,463

 

 

$

(163,092

)

 

$

373,555

 

Diluted Earnings per share

 

$

1.73

 

 

$

(1.35

)

 

$

3.08

 

 

Page 39


 

 

Year Ended

 

 

 

October 2, 2015

 

 

 

U.S. GAAP

 

 

Effects of 2015

Restructuring

 

 

Without 2015

Restructuring

 

Selling, general and administrative

 

$

1,522,811

 

 

$

(154,283

)

 

$

1,368,528

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Earnings Before Taxes

 

$

430,137

 

 

$

(157,192

)

 

$

587,329

 

Income Tax Benefit (Expense)

 

 

(101,255

)

 

 

49,278

 

 

 

(150,533

)

Net earnings of the Group

 

 

328,882

 

 

 

(107,914

)

 

 

436,796

 

Net Earnings Attributable to Noncontrolling Interests

 

 

(25,911

)

 

 

 

 

 

(25,911

)

Net earnings Attributable to Jacobs

 

$

302,971

 

 

$

(107,914

)

 

$

410,885

 

Diluted Earnings per share

 

$

2.40

 

 

$

(0.86

)

 

$

3.26

 

    The 2015 Inter-company Debt Refinancing

During the third quarter of fiscal 2015, the Company completed the refinancing of certain international inter-company debt (the "2015 Inter-company Debt Refinancing"). The 2015 Inter-company Debt Refinancing resulted in a one-time tax benefit of $23.1 million, or $0.18 per share.

    2016 Overview

The Company's GAAP net earnings for fiscal 2016 decreased by $92.5 million, or 30.5%, when compared to fiscal 2015. The Company’s results for fiscal 2016 when compared to the prior year were negatively impacted by the 2015 Restructuring, the loss on sale of our French subsidiary of $17.1 million, and the non-cash write-off on an equity investment of $10.4 million mentioned above.  Excluding the effects of the 2015 Restructuring and these other events, the Company's adjusted net earnings for fiscal 2016 decreased by $37.3 million, or 9.1%, compared to the prior year.

Also influencing the comparability of the Company’s fiscal 2016 consolidated results to fiscal 2015 were (i) a $0.09 per diluted share tax benefit related to an international tax matter recorded in first quarter of fiscal 2016;  (ii) a $0.03 net benefit per diluted share benefit related to several items, including the release of a foreign tax reserve and a one-time benefit in noncontrolling interests relating to certain work performed by one of our partially owned subsidiaries; partially off-set by the impact of a customer bankruptcy and a litigation settlement in the second quarter of fiscal 2016; (iii) a one-time tax related and other items of $4.1 million, or $0.03 per share in the fourth quarter of fiscal 2016; and (iv) a one-time tax benefit of $23.1 million, or $0.18 per share related to the 2015 Inter-company Debt Refinancing recorded in the second quarter of fiscal 2015.

 

Backlog at September 30, 2016 was $18.8 billion, and is essentially flat year over year. Backlog remains near record levels despite the negative effects on backlog stemming from the effects of foreign exchange rate changes.  New prospects and new sales remain strong and the Company continues to have a positive outlook for many of the industry groups and markets in which our clients operate.

During fiscal 2016, the Company repurchased and retired 3.4 million shares of its common stock under its share repurchase program. Total cash spent for the shares repurchased during fiscal 2016 was $152.5 million. As of October 2, 2015, the Company exhausted the $500 million approved by the Board of Directors on August 19, 2014. On July 23, 2015, the Board of Directors approved another program to purchase an additional $500 million of the Company's common stock over the next three years.  At the end of fiscal 2016, $347.5 million remained available under the current plan.

    Business Combinations Completed Between Fiscal 2014 and Fiscal 2016

During fiscal year 2016, the Company acquired J.L. Patterson & Associates and The Van Dyke Technology Group, Inc. These acquisitions were not material to the Company’s consolidated results for fiscal 2016.

We also completed a number of other acquisitions during fiscal 2014 including Federal Network Systems LLC ("FNS", formerly a subsidiary of Verizon); Eagleton Engineering, LLC; FMHC Corporation; Stobbarts (Nuclear) Limited; Trompeter Enterprises; and MARMAC Field Services, Inc. The results of operations of these other acquisitions were not material, individually or in the aggregate, to the Company's consolidated results of operations for fiscal 2014. During fiscal 2014, we also acquired an additional 15% interest in Jacobs, Zamel and Turbag Consulting Engineers Company ("ZATE"). This transaction brought the Company's ownership in ZATE to 75%.

Page 40


Consistent with other business combinations we have completed in the past, we began integrating businesses we acquired last year into our existing operations almost immediately after each business was acquired. Accordingly, it is not practicable to provide complete financial information for fiscal 2016 on a stand-alone basis for any of the businesses we acquired last year.

    Results of Operations

During the second quarter of fiscal 2016, we reorganized our operating and reporting structure around four lines of business (“LOB”).  This reorganization is intended to better serve our global clients, leverage our workforce, help streamline operations, and provide enhanced growth opportunities.  The four global LOBs are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial, which are the Company’s reportable segments. Previously, the Company operated its business as a single segment.

 

   Reconciliation of Segment Operating Profit to Total Operating Profit

The following table reconciles segment operating profit to total operating profit by including certain corporate-level items (in thousands).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Segment Operating Profit

$

586,328

 

 

$

615,549

 

 

$

600,815

 

Unallocated corporate items

 

(60,100

)

 

 

(15,739

)

 

 

20,583

 

Restructuring Charges

 

(187,630

)

 

 

(154,283

)

 

 

(93,330

)

Total Operating Profit

$

338,598

 

 

$

445,527

 

 

$

528,068

 

 

Included in “unallocated corporate items” in the above table are costs and expenses, which relate to general corporate activities as well as corporate-managed benefit and insurance programs.  Such costs and expenses include: (i) those elements of SG&A expenses relating to the business as a whole; (ii) those elements of the Company’s cash and equity incentive plans relating to corporate personnel whose other compensation costs are not allocated to the LOBs; (iii) the amortization of intangible assets acquired as part of purchased business combinations; (iv) the quarterly variances between the Company’s actual costs of certain of its self-insured integrated risk and employee benefit programs and amounts charged to the LOBs; and (v) certain adjustments relating to costs associated with the Company’s international defined benefit pension plans.  In addition, “unallocated corporate items” includes adjustments to contract margins (both positive and negative) associated with projects where it has been determined, in the opinion of management, that such adjustments are not indicative of the performance of the related LOB and therefore should not be attributed to the LOB.

    Segment Operating Results

In evaluating the Company’s performance by operating segment, the Chief Operating Decision Maker reviews various metrics and statistical data for each LOB but focuses primarily on revenues and operating profit.  As discussed above, segment operating profit includes not only local SG&A expenses but also the SG&A expenses of the Company’s support groups that have been allocated to the segments.  In addition, the Company allocates portions of the Company’s cash and equity incentive plans to the LOBs.  The revenues of certain LOBs are more affected by pass-through revenues than other LOBs.  The methods for recognizing revenue, incentive fees, project losses, and change orders are consistent among the LOBs.

Aerospace & Technology

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenue

$

2,657,433

 

 

$

2,924,753

 

 

$

2,306,453

 

Operating Profit

 

203,808

 

 

 

205,368

 

 

 

139,684

 

 

Aerospace & Technology revenues for the fiscal year ended September 30, 2016  decreased $267.3 million, or 9.1%, to $2.7 billion from $2.9 billion in fiscal 2015.  The decrease was due in part to some of our U.S. government customers’ shift to a small-business preference in contract awards, which was partially mitigated by stronger revenues in our U.K. nuclear and defense markets.

Page 41


 

Aerospace & Technology revenues for the year ended October 2, 2015 increased $618.3 million, or 26.8%, to $2.9 billion from $2.3 billion in fiscal 2014.  The increase was primarily due to the FNS acquisition completed during the fourth quarter of fiscal 2014.

Operating profit for the year ended September 30, 2016  decreased $1.6 million, or 0.8% to $203.8 million from $205.4 million in fiscal 2015.   The slight decrease in operating profit was due to lower volumes in fiscal 2016 described above but was mostly mitigated by improving our performance on fixed price contracts.  Operating margin for fiscal 2016, improved to 7.7%, compared to 7.0%, respectively, in fiscal 2015.  The improvement in operating margin was due to additional fees on our nuclear work for the U.K. government, the replacement of lower margin work with higher margin contracts and our continued focus on overall profitability.

Operating profit for the year ended October 2, 2015 increased $65.7 million, or 47.0% to $205.4 million from $139.7 million, in fiscal 2014. The increase in operating profit was due primarily to the acquisition described above and an increase in nuclear and defense work in the U.K.  As a result, operating margin for the year ended October 2, 2015, improved to 7.0%, compared to 6.1%, in fiscal 2014. 

Buildings & Infrastructure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenue

$

2,253,512

 

 

$

2,458,379

 

 

$

2,705,197

 

Operating Profit

 

174,648

 

 

 

145,299

 

 

 

164,439

 

 

Buildings & Infrastructure revenues for the year ended September 30, 2016 decreased $204.9 million, or 8.3%, to $2.3 billion from $2.5 billion in fiscal 2015.  The decrease was primarily due to reduced U.S. and U.K. client spending in certain markets during fiscal 2016.

 

Buildings & Infrastructure revenues for the year ended October 2, 2015 decreased $246.8 million, or 9.1%, to $2.5 billion from $2.7 billion in fiscal 2014.  The decrease was primarily due to the decline in our Energy and Power business in the Asia Pacific region.

Operating profit for the year ended September 30, 2016  increased $29.3 million, or 20.2%, from $145.3 million in fiscal 2015 to $174.6 million.    Proactive cost control and restructuring efforts contributed to the increase in operating profit for fiscal 2016 as compared to the corresponding period last year.  As a result, operating margin for fiscal 2016 improved to 7.8%, compared to 5.9%, in fiscal 2015.

Operating profit for the year ended October 2, 2015 decreased $19.1 million, or 11.6% to $145.3 million from $164.4 million in fiscal 2014.  The decrease in operating profit was due to the decline in energy and power business.  As a result, operating margin for the year ended October 2, 2015, declined to 5.9%, compared to 6.1%, in fiscal 2014.

Industrial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenue

$

2,793,713

 

 

$

2,517,571

 

 

$

2,956,391

 

Operating Profit

 

81,268

 

 

 

126,531

 

 

 

134,230

 

Industrial revenues for the year ended September 30, 2016 increased $276.1 million, or 11.0%, to $2.8 billion from $2.5 billion in fiscal 2015.  The increase was primarily due to new Life Sciences projects offset by a decline in the Mining & Minerals business due to weak market conditions.

Industrial revenues for the year ended October 2, 2015 decreased $438.8 million, or 14.8%, to $2.5 billion from $3.0 billion in fiscal 2014.  The decrease was primarily due to a decline in the Mining & Minerals and Field Services business due to weak market conditions.

Page 42


Operating profit for the year ended September 30, 2016 decreased $45.3 million, or 35.8% to $81.3 million from $126.5 million, in fiscal 2015.   The decrease was due to the decline in the Mining & Minerals business and was caused primarily by a negotiated settlement of a project claim that occurred in the second quarter of fiscal 2015 combined with the negative effects of a litigation settlement affecting the second quarter of fiscal 2016 and a customer bankruptcy. These decreases were offset in part by the increases in the Life Sciences market and benefits associated with the 2015 Restructuring. Although driven by discrete items in each of the periods presented, the change in operating profit was negative.  As a result, operating margin for fiscal 2016 declined to 2.9% from 5.0% for the corresponding period last year.

Operating profit for the year ended October 2, 2015 decreased $7.7 million, or 5.7% to $126.5 million from $134.2 million, in fiscal 2014.   The decrease in operating profit was due to the decline in the Mining & Minerals business driven by lower revenues as a result of weak market conditions.  Operating margin for the year ended October 2, 2015 increased to 5.0%, compared to 4.5%, in fiscal 2014.  The decrease in operating margin was driven primarily by a better project mix in the Specialty Chemical & Manufacturing markets and lower pass through revenue in Field Services.

Petroleum & Chemicals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenue

$

3,259,499

 

 

$

4,214,129

 

 

$

4,727,116

 

Operating Profit

 

126,604

 

 

 

138,351

 

 

 

162,462

 

 

Petroleum & Chemicals revenues for the year ended September 30, 2016 decreased  $954.6 million, or 22.7%, to $3.3 billion from $4.2 billion in fiscal 2015.  Petroleum & Chemicals revenues for the year ended October 2, 2015 decreased $513.0 million, or 10.9%, to $4.2 billion from $4.7 billion in fiscal 2014.  The decrease in both comparable annual periods was primarily due to lower business volume in the Oil & Gas market sector and to a lesser extent the Refining market sector, particularly in the Middle East and North America, as weak oil prices have significantly impacted client capital spending and delayed the pace of new contract awards.

Operating profit for the year ended September 30, 2016 decreased $11.7 million, or 8.5%, to $126.6 million from $138.4 million in fiscal 2015. The decrease in operating profit was due to lower volume in the Oil and Gas and Refining market sectors offset in part by significant savings from restructuring efforts and LOB structure efficiencies. A continued strong focus on cost reductions has partially mitigated the volume reduction impact on operating profit.   As a result, operating margin for the year ended September 30, 2016 increased to 3.9% from 3.3% in fiscal 2015.

Operating profit for the year ended October 2, 2015 decreased $24.1 million, or 14.8% to $138.4 million from $162.5 million, in fiscal 2014.   The decrease in operating profit was due to lower business volume partially offset by restructuring actions to lower the LOB cost structure.  As a result, operating margin for the year ended October 2, 2015, declined to 3.3%, compared to 3.4% in fiscal 2014.  

Consolidated Results

Fiscal 2016 Compared to Fiscal 2015

Direct costs of contracts decreased $1.0 billion, or 9.4%, from $10.1 billion during fiscal 2015 to $9.2 billion during fiscal 2016. Direct costs of contracts include all costs incurred in connection with and directly for the benefit of client contracts, including depreciation and amortization relating to assets used in connection with providing the services required by client projects. The level of direct costs of contracts may fluctuate between reporting periods due to a variety of factors including the amount of pass-through costs we incur during a period. On those projects where we are responsible for subcontract labor or third party materials and equipment, we reflect the amounts of such items in both revenues and costs (and we refer to such costs as “pass-through costs”). On other projects, where the client elects to pay for such items directly and we have no associated responsibility for such items, these amounts are not considered pass-through costs and are, therefore, not reflected in either revenues or costs. To the extent that we incur a significant amount of pass-through costs in a period, our direct cost of contracts are likely to increase as well.  The decrease in direct costs of contracts between fiscal years 2015 and 2016 is primarily a result of the general decline in our business.

Pass-through costs decreased $112.7 million, or 4.3%, from $2.6 billion during fiscal 2015 to $2.5 billion for fiscal 2016. In general, pass-through costs are more significant on projects that have a higher content of field services activities.

Page 43


Pass-through costs are generally incurred at a specific point in the lifecycle of a project and are highly dependent on the needs of our individual clients and the nature of the clients’ projects. However, because we have hundreds of projects, which start at various times within a fiscal year, the effect of pass-through costs on the level of direct costs of contracts, can vary between fiscal years without there being a fundamental or significant change to the underlying business.

As a percentage of revenues, direct costs of contracts were 83.9% for fiscal 2016, compared to 83.8% for fiscal 2015. The relationship between direct costs of contracts and revenues will fluctuate between reporting periods depending on a variety of factors including the mix of business during the reporting periods being compared as well as the level of margins earned from the various types of services provided. Generally speaking, the more procurement we do on behalf of our clients (i.e., where we purchase equipment and materials for use on projects, and/or procure subcontracts in connection with projects) and the more field services revenues we have relative to technical, professional services revenues, the higher the ratio will be of direct costs of contracts to revenues. Because revenues from pass-through costs typically have lower margin rates associated with them, it is not unusual for us to experience an increase or decrease in such revenues without experiencing a corresponding increase or decrease in our gross margins and operating profit. The ratio of direct costs of contracts to revenues was flat over the prior year period.  The Company experienced a slight decrease in margins in fiscal 2016 when compared to fiscal 2015.

Selling, general, and administrative ("SG&A") expenses for fiscal 2016 decreased by $93.6 million, or 6%, to $1.43 billion, compared to $1.52 billion for fiscal 2015. The decrease in SG&A expenses was primarily due to higher SG&A savings associated with the 2015 Restructuring.  Excluding the effects of the 2015 Restructuring in both fiscal 2016 and 2015, adjusted SG&A expenses for fiscal 2016 decreased $126.9 million, or 9%, to $1.24 billion from $1.37 billion in fiscal 2015.

Net interest expense for fiscal 2016 decreased $4.8 million to $7.4 million from $12.2 million in fiscal 2015. Included in net interest expense for fiscal 2016 was a reversal of $2.7 million of accrued interest expense related to the statute expiration of a foreign tax reserve.  Interest expense for fiscal 2016 was also lower when compared to the same period last year due to lower debt levels.

Loss on disposal of business and investments for fiscal 2016  increased by $38.5 million to $41.4 million from $2.9 million in fiscal 2015.  The increase is due to the previously discussed loss on the sale of our French subsidiary of $24.4 million, and a non-cash write-off on an equity investment of $17.0 million.

Miscellaneous expense for fiscal 2016 increased $2.8 million to $3.1 million from $0.2 million in fiscal 2015.  The increase over the prior year period was primarily due to realized exchange rate losses.  Included in miscellaneous expense for fiscal 2016 was a reversal of $5.1 million of accrued penalties related to the statute expiration of a foreign tax reserve.

The Company's effective income tax rate for fiscal 2016 increased to 25.2% from 23.5% in fiscal 2015. Contributing to the increase in the effective tax rate when compared to the prior year is the absence of a $23.1 million nonrecurring benefit related to a foreign currency loss in 2015.  Also contributing to the increase is an $8.9 million charge related to the revaluation of deferred tax assets due to a statutory tax rate change in the United Kingdom.  Offsetting the fiscal 2016 effective tax rate increases was a $11.2 million benefit related to a valuation allowance release, a $6.9 million benefit due to a prior period adjustment to income taxes payable and a $8.7 million benefit recorded upon the filing of a US amended tax return to claim additional foreign tax credits and Internal Revenue Code section 179D benefit for the design of energy efficient buildings.

Fiscal 2015 Compared to Fiscal 2014

The Company's GAAP net earnings for fiscal 2015 decreased by $25.1 million, or 7.6%, compared to fiscal 2014. Included in net earnings for fiscal 2015 is the one-time tax benefit of $23.1 million, or $0.18 per share, related to the 2015 Inter-company Debt Refinancing.

The Company's results for fiscal 2015 when compared to the prior year were positively impacted by (i) the SKM acquisition, which is included for all of fiscal 2015 compared to approximately nine and a half  months in fiscal 2014 and, to a lesser degree, (ii) the other acquisitions completed during fiscal 2014. Also influencing the comparability of the Company's fiscal 2015 results of operations to fiscal 2014 were the 2015 Restructuring and the 2014 Events below:

Page 44


 

$6.8 million, or $0.05 per diluted share, increase to net earnings due to the favorable resolution of an international tax matter in the first quarter of fiscal 2014; as a result of these events, approximately $4.1 million of accrued interest expense was reversed;

 

$6.4 million, or $0.05 per diluted share, increase to net earnings related to a gain on the sale of certain intellectual property in the second quarter of fiscal 2014;

 

$22.7 million, or $0.18 per diluted share, decrease to net earnings relating to certain specific operational events at SKM and SKM transaction-related costs and expenses incurred during the first half of the fiscal year; and

 

$22.3 million, or $0.16 per diluted share, decrease to net earnings due to lower margins associated with certain projects in Europe combined with unusual weather effects in the second quarter of fiscal 2014.

 

Revenues decreased $580.3 million, or 4.6%, from $12.7 billion for fiscal 2014 to $12.1 billion for fiscal 2015.  Revenues for fiscal year 2015 include a negative impact of $561.0 million related to the strengthening of the U.S. Dollar.

Direct costs of contracts decreased $474.9 million, or 4.5%, from $10.62 billion during fiscal 2014 to $10.15 billion during fiscal 2015.  Pass-through costs decreased $352.2 million, or 11.9%, from $2.95 billion during fiscal 2014 to $2.60 billion for fiscal 2015.

As a percentage of revenues, direct costs of contracts were 83.8% for fiscal 2015, compared to 83.7% for fiscal 2014. The ratio of direct costs of contracts to revenues was flat over the prior year period.

Selling, general, and administrative ("SG&A") expenses for fiscal 2015 decreased by $22.9 million, or 1.5%, to $1.52 billion, compared to $1.55 billion for fiscal 2014. The decrease in SG&A expenses was primarily due to lower costs stemming from the 2014 Events, which were partially offset by increased costs related to the 2015 Restructuring. Excluding the effects of the 2015 Restructuring and the 2014 Events, adjusted SG&A expenses for fiscal 2015 decreased $67.4 million, or 4.7%, to $1.37 billion from $1.44 billion for the corresponding period last year.

Net interest expense for fiscal 2015 increased $10.5 million to $12.2 million from $1.7 million in fiscal 2014. Included in net interest expense for fiscal 2014 was the reversal of $4.1 million of accrued interest expense recorded in connection with income tax liabilities relating to certain contested international tax matters, which were favorably resolved during the first quarter of fiscal 2014.

Page 45


The Company’s consolidated effective income tax rate was 25.2% for fiscal 2016, compared to 23.5% in fiscal 2015. Contributing to the increase in the effective tax rate when compared to the prior year is the absence of a $23.1 million nonrecurring benefit related to foreign currency loss in 2015.  The fiscal 2016 effective tax rate is lower than the statutory rate due to an $11.2 million benefit related to a valuation allowance release, a $6.9 million benefit due to a prior period adjustment to income taxes payable and an $8.7 million benefit recorded upon the filing of a US amended tax return to claim additional foreign tax credits and an IRC section 179D benefit for the design of energy efficient buildings.  Offsetting the current year benefits was an $8.9 million expense charge related to the revaluation of deferred tax assets due to a statutory tax rate change in the United Kingdom.

Contractual Obligations

The following table sets forth certain information about our contractual obligations as of September 30, 2016 (in thousands):

 

 

 

 

 

 

 

Payments Due by Fiscal Period

 

 

 

Total

 

 

1 Year

or Less

 

 

1 - 3

Years

 

 

3 - 5

Years

 

 

More than 5

Years

 

Debt obligations

 

$

387,751

 

 

$

2,421

 

 

$

385,330

 

 

 

 

 

 

$

 

Operating leases (a)

 

 

832,469

 

 

 

144,326

 

 

 

241,143

 

 

 

169,615

 

 

 

277,385

 

Obligations under defined benefit pension plans (b)

 

 

402,955

 

 

 

20,016

 

 

 

42,466

 

 

 

45,931

 

 

 

294,542

 

Obligations under nonqualified deferred compensation

   plans (c)

 

 

141,065

 

 

 

18,814

 

 

 

39,916

 

 

 

43,174

 

 

 

39,161

 

Purchase obligations (d)

 

 

1,122,071

 

 

 

1,122,071

 

 

 

 

 

 

 

 

 

 

Interest (e)

 

 

19,388

 

 

 

5,750

 

 

 

11,287

 

 

 

2,351

 

 

 

 

Total

 

$

2,905,699

 

 

$

1,313,398

 

 

$

720,142

 

 

$

261,071

 

 

$

611,088

 

 

(a)

Assumes the Company will make the end of lease term residual value guarantee payment of $62.4 million in 2025 with respect to the lease of an office building in Houston, Texas. Please refer to Note 11— Commitments and Contingencies, and Derivative Financial Instruments of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K.

(b)

Assumes that future contributions will be consistent with amounts projected to be contributed in fiscal 2017, allowing for certain growth based on rates of inflation and salary increases, but limited to the amount recorded as of September 30, 2016. Actual contributions will depend on a variety of factors, including amounts required by local laws and regulations, and other funding requirements.

(c)

Assumes that future payments will be consistent with amounts paid in fiscal 2016, allowing for certain growth. Due to the nonqualified nature of the plans, and the fact that benefits are based in part on years of service, the payments included in the schedule were limited to the amount recorded as of September 30, 2016.

(d)

Represents those liabilities estimated to be under firm contractual commitments as of September 30, 2016; primarily accounts payable and accrued payroll.

(e)

Determined based on borrowings outstanding at the end of fiscal 2016 using the interest rates in effect at that time and, for our outstanding long term debt, concluding with the expiration date of the 2014 Facility, as defined below.

Backlog Information

Backlog represents the total dollar amount of revenues we expect to record in the future as a result of performing work under contracts that have been awarded to us. We include in backlog the entire value of contracts at the time the contracts are awarded to us or when we have otherwise been authorized by the client to proceed with the services required by the contracts. With respect to O&M contracts, however, we include in backlog the amount of revenues we expect to receive for only one succeeding year, regardless of the remaining life of the contract. For national government programs (other than U.S. federal O&M contracts), our policy is to include in backlog the full contract award, whether funded or unfunded, excluding option periods. In accordance with industry practice, substantially all of our contracts are subject to cancellation or termination at the discretion of the client. In a situation where a client terminates a contract, we would ordinarily be entitled to receive payment for work performed up to the date of termination.  In addition, it is not unusual for clients to change the scope of services required by the contract over the life of the project. Accordingly, backlog can fluctuate from one reporting period to the next due to the timing of when new contracts are added to backlog and when the contract revenue is recognized in our consolidated financial statements. Many of our contracts require us to provide services that span over a number of fiscal quarters (and sometimes over fiscal years).

Page 46


Please refer to Item 1A— Risk Factors, above, for a discussion of other factors that may cause backlog to ultimately convert into revenues at different amounts.

The following table summarizes our backlog for each of the last three fiscal years (in millions): 

 

Backlog:

 

2016

 

 

2015

 

 

2014

 

Aerospace & Technology

 

$

5,109,973

 

 

$

4,880,775

 

 

$

4,998,844

 

Buildings & Infrastructure

 

 

5,033,539

 

 

 

4,723,034

 

 

 

4,532,085

 

Industrial

 

 

3,106,575

 

 

 

3,650,520

 

 

 

2,471,867

 

Petroleum & Chemicals

 

$

5,510,442

 

 

$

5,552,241

 

 

 

6,377,561

 

Total

 

$

18,760,529

 

 

$

18,806,570

 

 

$

18,380,357

 

 

Our backlog at September 30, 2016  decreased by $46 million, or 0.2%, to $18.8 billion from $18.8 billion at October 2, 2015. The decrease in backlog from October 2, 2015 to September 30, 2016 was due primarily to new awards from clients operating in the Chemicals and Pharmaceuticals industries, offset in part by an approximate $182.6 million reduction due to foreign exchange.

Backlog in the Aerospace & Technology LOB at September 30, 2016 was $ 5.11 billion, up $ 229.2 million, or $180.4 million after the effect of exchange rate changes when compared to the backlog at October 2, 2015.  The year-over-year increase in backlog was primarily from an increase in new awards from the U.S. federal government.

Backlog in the Buildings & Infrastructure LOB at September 30, 2016 was $5.03 billion, up $310.5 million, or $217.6 million after the effect of exchange rate changes when compared to the backlog at October 2, 2015.  The year-over-year increase in backlog was primarily from new awards in the U.S. Buildings and Infrastructure market.

Backlog in the Industrial LOB at September 30, 2016 was $3.11 billion, down $543.9 million, or $449.5 million after the effect of exchange rate changes when compared to the backlog at October 2, 2015.  The year-over-year decrease in backlog was primarily related to a lower level of field services awards.

Backlog in the Petroleum & Chemicals LOB at September 30, 2016 was $5.51 billion, down $41.8 million, or $5.3 million after the effect of exchange rate changes when compared to the backlog at October 2, 2015.  The year-over-year decrease in backlog was primarily related to weak oil process affecting our customers’ capital spend.

Backlog relating to work to be performed either directly or indirectly for the U.S. federal government and its agencies totaled approximately $4.8 billion (or 25.4% of total backlog), $4.6 billion (or 23.9% of total backlog), and $3.9 billion (or 22.9% of total backlog) at September 30, 2016, October 2, 2015, and September 26, 2014, respectively. Most of our federal contracts require that services be provided beyond one year. In general, these contracts must be funded annually (i.e., the amounts to be spent under the contract must be appropriated by the U.S. Congress to the procuring agency, and then the agency must allot these sums to the specific contracts).

We estimate that approximately $7.7 billion, or 41.28%, of total backlog at September 30, 2016 will be realized as revenues within the next fiscal year.

Effects of Inflation

The effects of inflation on our business is discussed in Item 1A— Risk Factors, and is incorporated herein by reference.

Liquidity and Capital Resources

At September 30, 2016, our primary sources of liquidity consisted of $655.7 million of cash and cash equivalents and $1.21 billion of available borrowing capacity under our $1.6 billion revolving credit facility (the "2014 Facility").

Additional information regarding the 2014 Facility is set forth in Note 6 - Borrowings in Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K. We finance as much of our operations and growth as possible through cash generated by our operations.

Page 47


During fiscal 2016, our cash and cash equivalents increased by $194.9 million from $460.9 million at October 2, 2015 to $655.7 million at September 30, 2016. This compares to a net decrease in cash and cash equivalents of $271.8 million during fiscal 2015. During fiscal 2016, we experienced net cash inflows of $680.2 million from operating activities offset by outflows of $317.0 million from financing activities, $139.6 million from investing activities, and $28.7 million from the effects of exchange rate changes.

Operations provided net cash of $680.2 million during fiscal 2016. This compares to net cash inflows of $484.6 million and $721.7 million during fiscal 2015 and 2014, respectively. The $195.6 million increase in cash provided by operations in fiscal 2016 as compared to fiscal 2015 was due primarily to a $373.1 million favorable change in the Company's working capital accounts, partially offset by a $ 114.4 million decrease in net earnings attributable to the Group.

Because such a high percentage of our revenues are earned on cost-plus type contracts, and due to the significance of revenues relating to pass-through costs, most of the costs we incur are included in invoices we send to clients. Although we continually monitor our accounts receivable, we manage the operating cash flows of the Company by managing the working capital accounts in total, rather than by the individual elements. The primary elements of the Company’s working capital accounts are accounts receivable, accounts payable, and billings in excess of cost. Accounts payable consists of obligations to third parties relating primarily to costs incurred for projects, which are generally billable to clients. Accounts receivable consist of billings to our clients — a substantial portion of which is for project-related costs. Billings in excess of cost consist of billings to and payments from our clients for costs yet to be incurred.

This relationship between revenues and costs, and between receivables and payables is unique to our industry, and facilitates review of our liquidity at the total working capital level. The $373.1 million increase in cash flows relating to our working capital accounts during fiscal 2016 is indicative of our building momentum to become more effective in our working capital performance.

With respect to the Company’s trade accounts receivable, while our credit risk could be significant based on the fact that we provide services to clients operating in a wide range of industries as well as in a number of countries outside the U.S., we manage these issues closely to reduce exposures as much as possible and historically have not experienced material losses.  Nevertheless, and as disclosed previously, the Company incurred a loss during the second quarter of fiscal 2016 relating to the bankruptcy of a client of the Industrial LOB.  Our private sector customers include large, well-known, and well-established multi-national companies, and our government customers consist of national, state, and local agencies located principally in the U.S., the U.K., and Australia. Although we have not historically experienced significant collection issues with any of our governmental or commercial customers, we are currently reassessing how we extend credit to certain customers and markets that we service.

We used $139.6 million of cash and cash equivalents for investing activities during fiscal 2016. This compares to $96.1 million and $1.5 billion during fiscal 2015 and 2014, respectively. The increase in investing activities in fiscal 2016 when compared to fiscal 2015 was primarily the result of two small acquisitions in fiscal 2016 and the cash used in the sale of Jacobs France subsidiary.   The acquisition activity in fiscal 2014 was primarily related to the Company's acquisition of SKM for $1.2 billion ($1.1 billion net of cash acquired).

Additions to property and equipment totaled $67.7 million, $88.4 million, and $132.1 million for fiscal years 2016, 2015, and 2014, respectively. Included in fiscal 2015 and 2014 activity are significant expenditures for leasehold improvements relating primarily to the consolidation of certain office space, expansion of office space and relocations of certain office space, all occurring in a number of locations.

Our financing activities resulted in net cash outflow of $317.0 million during fiscal 2016 as compared to net cash outflow of $553.3 million and net cash inflow of $304.9 million during fiscal 2015 and 2014, respectively. The $236.3 million in incremental cash inflow during fiscal 2016 as compared to the previous year was due primarily to a $269.8 million decrease in cash used to repurchased shares of Company common stock (discussed in further detail in Part II, Item 5 of this Annual Report on Form 10-K).  The $858.2 million in incremental cash outflows during fiscal 2015 as compared to fiscal 2014 was due primarily to a $502.7 million increase in cash used to pay-off long-term debt during fiscal 2015, combined with a $343.9 million increase in cash used to repurchase shares of Company common stock

The Company had $655.7 million of cash and short-term equivalents at September 30, 2016. Of this amount, approximately $149.2 million was held in the U.S. and $506.5 million was held outside of the U.S., primarily in Canada, the U.K., and the Eurozone. Other than the tax cost of repatriating funds held outside the U.S. to the U.S. (see Note 10— Income

Page 48


Taxes of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K), there are no impediments to repatriating these funds to the U.S.

The total amount utilized under the 2014 Facility at September 30, 2016 was $387.8 million ($385.3 million in the form of direct borrowings and $2.5 million utilized in the form of letters of credit). Please refer to Note 6— Borrowings of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K for additional information regarding the 2014 Facility.

We believe we have adequate liquidity and capital resources to fund our operations, support our acquisition strategy, support the existing share repurchase authorization, and service our debt for the next twelve months.  We had $655.7 million in cash and cash equivalents at September 30, 2016, compared to $460.9 million at October 2, 2015. Our consolidated working capital position at September 30, 2016 was $1.08 billion; a decrease of $59.7 million from October 2, 2015.

Additionally, there was $1.21 billion of borrowing capacity available at September 30, 2016 under the 2014 Facility. We believe that the remaining capacity, terms and conditions of the 2014 Facility, combined with cash on-hand and the other committed and uncommitted facilities we have in place, are adequate for our working capital and general business requirements.

The Company had $256.0 million of letters of credit outstanding at September 30, 2016. Of this amount, $2.5 million were issued under the 2014 Facility and $253.5 million were issued under separate, committed and uncommitted letter-of-credit facilities.

Off-Balance Sheet Arrangements

We are party to financial instruments with off-balance sheet risk in the form of guarantees not reflected in our balance sheet that arise in the normal course of business. However, such off-balance sheet arrangements are not reasonably likely to have an effect on our financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or resources that are material to investors. See Note 11 – Commitments and Contingencies, and Derivative Financial Instruments of Notes to Consolidated Financial Statements beginning on page F-1 of this Annual Report on Form 10-K.

New Accounting Pronouncements

From time to time, the Financial Accounting Standards Board ("FASB") issues accounting standards updates (each being an "ASU") to its Accounting Standards Codification ("ASC"), which constitutes the primary source of U.S. GAAP. The Company regularly monitors ASUs as they are issued and considers their applicability to its business. All ASUs applicable to the Company are adopted by the due date and in the manner prescribed by the FASB. A discussion of those recently issued ASUs most likely to affect the presentation of the Company's consolidated financial statements follows.

In May 2014, the FASB issued ASU No. 2014-09— Revenue from Contracts with Customers. The new guidance provided by ASU 2014-09 is intended to remove inconsistencies and perceived weaknesses in the existing revenue requirements, provide a more robust framework for addressing revenue issues, improve comparability, provide information that is more useful and simplify the preparation of financial statements. ASU 2014-09 was initially effective for annual and interim reporting periods beginning after December 15, 2016. On July 9, 2015, the FASB approved a one-year deferral of the effective date of this standard. The revised effective date for the standard is for annual reporting periods beginning after December 15, 2017 and interim periods therein. The FASB also approved changes allowing for early adoption of the standard as of the original effective date. The Company has completed its initial assessment of the new standard and is in the process of developing a plan to assess its contracts with customers.  The Company currently intends to adopt the new standard using the Modified Retrospective application.  This standard could have a significant impact on the Company’s Consolidated Financial Statements and an administrative impact on its operations.  The Company will further assess the impact through its implementation program.

In February 2016, the FASB issued ASU 2016-02— Leases. ASU 2016-02 requires lessees to recognize assets and liabilities for most leases. ASU 2016-02 is effective for public entity financial statements for annual periods beginning after December 15, 2018, and interim periods within those annual periods. Early adoption is permitted, including adoption in an interim period. The guidance must be adopted using a modified retrospective approach for leases that exist or are entered into after the beginning of the earliest comparative period in the financial statements. The Company is evaluating the impact of the new guidance on its consolidated financial statements. This standard could have a significant impact on the Company’s

Page 49


Consolidated Financial Statements and an administrative impact on its operations.  The Company will further assess the impact through its implementation program.

In March 2016, the FASB issued ASU 2016-09— Improvements to Employee Share-Based Payment Accounting.  ASU 2016-09 simplifies several aspects of the accounting for share-based payment transactions, including the income tax consequences, classification of awards as either equity or liabilities, and classification on the statement of cash flows. ASU 2016-09 is effective for annual periods beginning after December 15, 2016, and interim periods within those annual periods. Early adoption is permitted for any entity in any interim or annual period for which financial statements have not been issued or made available for issuance. If an entity early adopts the amendments in an interim period, any adjustments must be reflected as of the beginning of the fiscal year that includes that interim period. An entity that elects early adoption must adopt all of the amendments in the same period. The Company is evaluating the impact of the new guidance on its consolidated financial statements and does not expect it to have a material impact.

During the second quarter of fiscal 2016, the Company adopted the provisions of ASU 2015-17— Balance Sheet Classification of Deferred Taxes on a retrospective basis for all periods presented.  ASU 2015-17 removes the requirement to separate deferred income tax liabilities and assets into current and noncurrent amounts in a classified statement of financial position. Instead, the update requires that deferred tax liabilities and assets be classified as noncurrent in a classified statement of financial position. As a result of the Company’s adoption of ASU 2015-17 in the second quarter of fiscal 2016, the current deferred taxes and noncurrent deferred tax assets included in miscellaneous noncurrent assets on the October 2, 2015 Consolidated Balance Sheet were reclassified to noncurrent deferred taxes, which increased noncurrent deferred tax assets by $160.3 million and decreased miscellaneous noncurrent assets by $213.8 million.

 

 

 

Page 50


Item 7A.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

We do not enter into derivative financial instruments for trading, speculation or other purposes that would expose the Company to market risk. In the normal course of business, our results of operations are exposed to risks associated with fluctuations in interest rates and currency exchange rates.

Interest Rate Risk

Please refer to the discussion of the 2014 Facility and the 2012 Facility in the liquidity and capital resources discussion in Management's Discussion and Analysis of Financial Condition and Results of Operations in this Annual Report on Form 10-K, and Note 5 - Borrowings in Notes to Consolidated Financial Statements beginning on Page F-1 of this Annual report on Form 10-K.

Foreign Currency Risk

In situations where our operations incur contract costs in currencies other than their functional currency, we attempt to have a portion of the related contract revenues denominated in the same currencies as the costs. In those situations where revenues and costs are transacted in different currencies, we sometimes enter into foreign exchange contracts in order to limit our exposure to fluctuating foreign currencies. We follow the provisions of ASC 815-10 - Derivatives and Hedging in accounting for our derivative contracts. The Company does not currently have exchange rate sensitive instruments that would have a material effect on our consolidated financial statements or results of operations.

 

 

 

Item 8.

FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

The information required by this Item 8 is submitted as a separate section beginning on page F-1of this Annual Report on Form 10-K and is incorporated herein by reference.

 

 

 

Item 9.

CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

 

 

Item 9A.

CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company’s management, with the participation of its Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of the Company’s disclosure controls and procedures as defined by Rule 13a-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”) as of September 30, 2016, the end of the period covered by this Annual Report on Form 10-K (the “Evaluation Date”). Based on that evaluation, the Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were functioning effectively as of the Evaluation Date to provide reasonable assurance that the information required to be disclosed by the Company in reports filed under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to the Company’s management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Management’s Annual Report on Internal Control Over Financial Reporting

Management is responsible for establishing and maintaining adequate internal controls over financial reporting, as defined in Rule 13a-15(f) under the Exchange Act. Management, with the participation of its Chief Executive Officer and Chief Financial Officer, has assessed the effectiveness of the Company’s internal control over financial reporting as of the Evaluation Date based on the framework established in “Internal Control—Integrated Framework,” issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework). Based on this evaluation, management has concluded that the Company’s internal controls over financial reporting as of the Evaluation Date were effective. The Company’s independent registered public accounting firm, Ernst & Young LLP, has issued an attestation report on the Company’s internal control over financial reporting which appears later in this Annual Report on Form 10-K.

Page 51


Changes in Internal Control

There were no changes in the Company’s internal control over financial reporting during the Company’s fiscal quarter ended September 30, 2016 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

Limitations on Effectiveness of Controls

The Company’s management, including its Chief Executive Officer and Chief Financial Officer, does not expect that its disclosure controls and procedures or its system of internal control over financial reporting will prevent or detect all errors and all fraud. A control system, no matter how well designed or operated, can provide only reasonable, but not absolute, assurance that the objectives of the system of internal control are met. The design of the Company’s control system reflects the fact that there are resource constraints, and that the benefits of such control systems must be considered relative to their costs. Further, because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control failures and instances of fraud, if any, within the Company have been detected. These inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the intentional acts of individuals, by collusion of two or more people, or by management override of the controls. The design of any system of controls is also based in part on certain assumptions about the likelihood of future events, and there can be no assurance that the design of any particular control will always succeed in achieving its objective under all potential future conditions.

Item 9B.

OTHER INFORMATION

None.

 

 

Page 52


PART III

Item 10.

DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

Directors, Executive Officers, Promoters and Control Persons

The information required by Paragraph (a), and Paragraphs (c) through (g) of Item 401 of Regulation S-K (except for information required by Paragraph (e) of that Item to the extent the required information pertains to our executive officers) and Item 405 of Regulation S-K is set forth under the captions “The Board of Directors and its Committees” and “Section 16(a) Beneficial Ownership Reporting Compliance” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference. The information required by Paragraph (b) of Item 401 of Regulation S-K, as well as the information required by Paragraph (e) of that Item to the extent the required information pertains to our executive officers, is set forth in Part I, Item 1 of this Annual Report on Form 10-K under the heading “Executive Officers of the Registrant.”

Code of Ethics

We have adopted a code of ethics for our chief executive, chief financial, and principal accounting officers; a code of business conduct and ethics for members of our Board of Directors and corporate governance guidelines. The full text of the codes of ethics and corporate governance guidelines is available at our website at www.jacobs.com. In the event we make any amendment to, or grant any waiver from, a provision of the code of ethics that applies to the principal executive officer, principal financial officer or principal accounting officer that requires disclosure under applicable SEC rules, we will disclose such amendment or waiver and the reasons therefor on our website. We will provide any person without charge a copy of any of the aforementioned codes of ethics upon receipt of a written request. Requests should be addressed to: Jacobs Engineering Group Inc., 1999 Bryan Street, Suite 1200, Dallas, Texas 75201, Attention: Corporate Secretary.

Corporate Governance

The information required by Items 407(d)(4) and (d)(5) of Regulation S-K is set forth under the caption “The Board of Directors and its Committees - Committees of the Board of Directors - Audit Committee” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

Item 11.

EXECUTIVE COMPENSATION

The information required by this Item is set forth under the captions “The Board of Directors and its Committees - Compensation of Directors for Fiscal 2016,” “The Board of Directors and its Committees - Committees of the Board of Directors - Compensation Committee Interlocks and Insider Participation,” “Compensation Committee Report,” “Compensation Discussion and Analysis,” and “Executive Compensation” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

Item 12.

SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

Securities Authorized for Issuance Under Equity Compensation Plans

The following table presents certain information about our equity compensation plans as of September 30, 2016:

 

 

 

Column A

 

 

Column B

 

 

Column C

 

Plan Category

 

Number of securities to

be issued upon

exercise of outstanding

options,

warrants, and rights

 

 

Weighted- average

exercise price of

outstanding options,

warrants, and rights

 

 

Number of securities remaining

available for future issuance under

equity compensation

plans (excluding securities reflected

in Column A)

 

Equity compensation plans approved by

   shareholders (a)

 

 

3,577,512

 

 

$

45.70

 

 

 

7,552,708

 

Equity compensation plans not approved by

   shareholders

 

 

 

 

 

 

 

 

 

Total

 

 

3,577,512

 

 

$

45.70

 

 

 

7,552,708

 

Page 53


 

(a)

The number in Column A excludes purchase rights accruing under our two, broad-based, shareholder-approved employee stock purchase plans: The Jacobs Engineering Group Inc. 1989 Employee Stock Purchase Plan (the “1989 ESPP”), and the Global Employee Stock Purchase Plan (the “GESPP”). These plans give employees the right to purchase shares at an amount and price that are not determinable until the end of the specified purchase periods, which occur monthly. Our shareholders have authorized a total of 27.8 million shares of common stock to be issued through the 1989 ESPP and the GESPP. From the inception of the 1989 ESPP and the GESPP through September 30, 2016, a total of 27.2 million shares have been issued, leaving 0.6 million shares of common stock available for future issuance at that date.

The information required by Item 403 of Regulation S-K is set forth under the caption “Security Ownership” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

Item 13.

CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required by this Item is set forth under the captions “The Board of Directors and its Committees - Independence of Directors,” “The Board of Directors and its Committees - Committees of the Board of Directors,” and “Certain Relationships and Related Transactions” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

Item 14.

PRINCIPAL ACCOUNTING FEES AND SERVICES

The information required by this Item is set forth under the captions “Report of the Audit Committee” and “Audit and Non-Audit Fees” in our definitive proxy statement to be filed with the SEC pursuant to Regulation 14A within 120 days after the close of our fiscal year and is incorporated herein by reference.

 

 

Page 54


PART IV

Item 15.

EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

(a) Documents filed as part of this report:

 

(1)

The Company’s Consolidated Financial Statements at September 30, 2016 and October 2, 2015and for each of the three years in the period ended September 30, 2016, October 2, 2015 and September 26, 2014 and the notes thereto, together with the report of the independent auditors on those Consolidated Financial Statements are hereby filed as part of this report, beginning on page F-1.

 

(2)

Financial statement schedules – no financial statement schedules are presented as the required information is either not applicable, or is included in the consolidated financial statements or notes thereto.

 

(3)

See Exhibit Index below.

Page 55


(b) Exhibit Index:

 

2.1

 

Merger Implementation Deed between Sinclair Knight Merz Management Pty Limited and Sinclair Knight Merz Holdings Limited and Jacobs Engineering Group Inc. and Jacobs Australia Holdings Company Pty. Ltd, dated as of September 8, 2013. Filed as Exhibit 2.2 to the Registrant’s fiscal 2013 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

2.2

 

Sales Agreement between Sinclair Knight Merz Management Pty Limited, Sinclair Knight Merz Holdings Limited, Jacobs Engineering Group Inc. and Jacobs Australia Holdings Company Pty, Ltd., dated as of December 13, 2013.  Filed as Exhibit 2.3 to the Registrant’s Quarterly Report on Form 10-Q for the first quarter of fiscal 2014 and incorporated herein by reference.

 

 

 

3.1

 

Amended and Restated Certificate of Incorporation of the Registrant. Filed as Exhibit 3.1 to the Registrant’s Current Report on Form 8-K on January 28, 2014 and incorporated herein by reference.

 

 

 

3.2

 

Amended and Restated Bylaws of the Registrant. Filed as Exhibit 3.1 to the Registrant’s Current Report on Form 8-K on July 16, 2015 and incorporated herein by reference.

 

 

 

4.1

 

See Sections 5 through 18 of Exhibit 3.1.

 

 

 

4.2

 

See Article II, Section 3.03 of Article III, Article VI and Section 7.04 of Article VII of Exhibit 3.2.

 

 

 

10.1#

 

The Jacobs Engineering Group Inc. Incentive Bonus Plan for Officers and Key Managers as amended and restated on May 22, 2014. Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2015 and incorporated herein by reference.

 

 

 

10.2#

 

The Executive Security Program of Jacobs Engineering Group Inc. Filed as Exhibit 10.2 to the Registrant’s fiscal 2014 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.3#

 

Amendment to the Executive Security Program of Jacobs Engineering Group Inc., dated December 23, 2008. Filed as Exhibit 10.3 to the Registrant’s fiscal 2014 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.4#

 

Amendment to the Executive Security Program of Jacobs Engineering Group Inc., dated May 31, 2009. Filed as Exhibit 10.4 to the Registrant’s fiscal 2014 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.5#

 

Jacobs Engineering Group Inc. 1991 Executive Deferral Plan, effective June 1, 1991. Filed as Exhibit 10.5 to the Registrant’s fiscal 2012 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.6#

 

Jacobs Engineering Group Inc. 1993 Executive Deferral Plan, effective December 1, 1993. Filed as Exhibit 10.6 to the Registrant’s fiscal 2012 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.7#

 

Jacobs Engineering Group Inc. 1995 Executive Deferral Plan, effective January 1, 1995. Filed as Exhibit 10.7 to the Registrant’s fiscal 2014 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.8#

 

Jacobs Engineering Group Inc. Amended and Restated Executive Deferral Plan. Filed as Exhibit 10.8 to the Registrant’s fiscal 2012 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.9#

 

The Jacobs Engineering Group Inc. 1989 Employee Stock Purchase Plan, as Amended and Restated-effective January 22, 2009. Filed as Exhibit 10.9 to the Registrant’s fiscal 2014 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.10#

 

The Jacobs Engineering Group Inc. Global Employee Stock Purchase Plan. Filed as Exhibit 10.10 to the Registrant’s fiscal 2011 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.11#

 

Jacobs Engineering Group Inc. 401(k) Plus Savings Plan and Trust, as Amended and Restated April 1, 2003. Filed as Exhibit 10.12 to the Registrant’s fiscal 2012 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.12#

 

Jacobs Engineering Group Inc. 1999 Stock Incentive Plan, as Amended and Restated. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K (File No. 333-157014) on January 28, 2014 and incorporated herein by reference.

Page 56


 

 

 

10.13#

 

Form of Indemnification Agreement entered into between the Registrant and certain of its officers and directors. Filed as Exhibit 10.1 to the Registrant's Quarterly Report on Form 10-Q for the third quarter of fiscal 2012 and incorporated herein by reference.

 

 

 

10.14#

 

Form of Jacobs Engineering Group Inc. Non-Qualified Stock Option Agreement. Filed as Exhibit 4.3 to the Registrant’s Registration Statement on Form S-8 filed on January 29, 2009 and incorporated herein by reference.

 

 

 

10.15#

 

Form of Jacobs Engineering Group Inc. Restricted Stock Agreement. Filed as Exhibit 10.3 to the Registrant's Quarterly Report on Form 10-Q for the second quarter of fiscal 2012 and incorporated herein by reference.

 

 

 

10.16#

 

Form of Restricted Stock Unit Award Agreement. Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2012 and incorporated herein by reference.

 

 

 

10.17#

 

Form of Restricted Stock Award Agreement. Filed as Exhibit 10.3 to the Registrant’s Current Report on Form 8-K on June 1, 2011 and incorporated herein by reference.

 

 

 

10.18#

 

Jacobs Engineering Group Inc. 1999 Outside Director Stock Plan, as Amended and Restated. Filed as Exhibit 10.21 to the Registrant’s fiscal 2012 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.19#

 

Form of Restricted Stock Unit Award Agreement (Performance Shares - Net Earnings Growth 2013 Award). Filed as Exhibit 10.3 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2013 and incorporated herein by reference.

 

 

 

10.20#

 

Form of Restricted Stock Unit Award Agreement. (Performance Shares - TSR 2013 Award). Filed as Exhibit 10.4 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2013 and incorporated herein by reference.

 

 

 

10.21

 

Credit Agreement dated as of March 29, 2012 among Jacobs Engineering Group Inc. and certain of its subsidiaries as borrowers, and the Bank of America, N.A, (as Administrative Agent); BNP Paribas, and Wells Fargo Bank, N.A. (as Co-Syndication Agents); Union Bank, N.A. (as Documentation Agent); Merrill Lynch, Pierce, Fenner & Smith Incorporated (as Sole Book Manager); and Merrill Lynch, Pierce, Fenner & Smith Incorporated, BNP Paribas Securities Corp, and Wells Fargo Securities, LLC (as Joint Lead Arrangers). Filed as Exhibit 10.1 to the Registrant's Quarterly Report on Form 10-Q for the second quarter of fiscal 2012 and incorporated herein by reference.

 

 

 

10.22#

 

Employment agreement between Jacobs Engineering Group Inc. and Michael Tyler dated May 28, 2013. Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2013 and incorporated herein by reference.

 

 

 

10.23#

 

Retirement Agreement dated April 14, 2014 between the Registrant and Thomas R. Hammond.  Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2014 and incorporated herein by reference.

 

 

 

10.24#

 

Jacobs Engineering Group Inc. 2005 Executive Deferral Plan, effective January 1, 2005. Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2010 and incorporated herein by reference.

 

 

 

10.28#

 

Amendment No. 2 to Consulting Agreement between the Registrant and Noel G. Watson dated July 1, 2013. Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2013 and incorporated herein by reference.

 

 

 

10.34#

 

Employment Agreement dated December 23, 2010 between the Registrant and Gary Mandel. Filed as Exhibit 10.6 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2011 and incorporated herein by reference.

 

 

 

10.35

 

Amended and Restated Credit Agreement dated as of February 7, 2014 among Jacobs Engineering Group Inc. and certain of its subsidiaries as borrowers, and the Bank of America, N.A. (as Administrative Agent); Bank of America, N.A., BNP Paribas, and Wells Fargo Bank, N.A. (as Co-Syndication Agents); The Bank of Tokyo-Mitsubishi UFJ, LTD, and TD Bank, N.A. (as Co-Documentation Agents); Merrill Lynch, Pierce, Fenner & Smith Incorporated (as Sole Book Manager); and Merrill Lynch, Pierce, Fenner & Smith Incorporated, BNP Paribas Securities Corp, and Wells Fargo Securities, LLC (as Joint Lead Arrangers).  Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on February 11, 2014 and incorporated herein by reference.

Page 57


 

 

 

10.36#

 

Form of Restricted Stock Unit Award Agreement (Performance Shares - Net Earnings Growth - 2014 Award).  Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2014 and incorporated herein by reference.

 

 

 

10.37#

 

Form of Restricted Stock Unit Award Agreement (Performance Shares - TSR - 2014 Award).  Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2014 and incorporated herein by reference.

 

 

 

10.39#

 

Offer Letter by and between Jacobs Engineering Group Inc. and Kevin C. Berryman, effective November 12, 2014.  Filed as Exhibit 99.1 to Amendment No. 1 to the Registrant’s Current Report on Form 8-K/A on November 17, 2014 and incorporated herein by reference.

 

 

 

10.40#

 

Transition Agreement with Craig L. Martin, dated as of December 19, 2014. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on December 23, 2014 and incorporated herein by reference.

 

 

 

10.41#

 

Letter Agreement with Noel G. Watson, dated as of February 25, 2015. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on March 2, 2015 and incorporated herein by reference.

 

 

 

10.42

 

Amendment Agreement, dated as of March 4, 2015, among Jacobs Engineering Group, Inc., certain subsidiaries thereof party thereto, each lender party thereto, each issuer of letters of credit party thereto and Bank of America, N.A., as Administrative Agent and Swing Line Lender. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on March 5, 2015 and incorporated herein by reference.

 

 

 

10.43#

 

Form of Transition Agreement. Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2015 and incorporated herein by reference.

 

 

 

10.44#

 

Form of Stock Option Agreement (December 2014 grants). Filed as Exhibit 10.3 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2015 and incorporated herein by reference.

 

 

 

10.45#

 

Offer Letter with Steven J. Demetriou, dated as of July 10, 2015. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on July 16, 2015 and incorporated herein by reference.

 

 

 

10.46#

 

Form of Nonqualified Stock Option Agreement. Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2015 and incorporated herein by reference.

 

 

 

10.47#

 

Form of Restricted Stock Unit Award Agreement (Performance Shares - Net Earnings Growth). Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2015 and incorporated herein by reference.

 

 

 

10.48#

 

Separation Agreement with Santo Rizzuto dated October 16, 2015. Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on October 22, 2015 and incorporated herein by reference.

 

 

 

10.49#

 

Separation Agreement with Cora Carmody, effective September 15, 2015.  Filed as Exhibit 10.49 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.50#

 

Jacobs Engineering Group Inc. Management Incentive Plan, as Amended and Restated, effective November 19, 2015.  Filed as Exhibit 10.50 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.51#

 

Form of Restricted Stock Agreement (awarded pursuant to the 1999 Stock Incentive Plan).  Filed as Exhibit 10.51 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.52#

 

Form of Restricted Stock Unit Agreement (awarded pursuant to the 1999 Stock Incentive Plan).  Filed as Exhibit 10.52 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.53#

 

Form of Restricted Stock Unit Agreement (Performance Shares - Earnings Per Share Growth).  Filed as Exhibit 10.53 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.54#

 

Form of Restricted Stock Unit Agreement (Performance Shares - TSR).  Filed as Exhibit 10.54 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

10.55#

 

Form of Restricted Stock Unit Agreement (Cash Settled Non-US Employees).  Filed as Exhibit 10.55 to the Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

 

 

Page 58


10.56#

 

Form of Nonqualified Stock Option Agreement (1999 Stock Incentive Plan).  Filed as Exhibit 10.56 to the

Registrant’s fiscal 2015 Annual Report on Form 10-K and incorporated herein by reference.

 

10.57#

 

Form of Restricted Stock Unit Award Agreement (awarded pursuant to the 1999 Outside Directors Stock Plan).  Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2016 and incorporated herein by reference.

 

10.58#

 

Form of Stock Option Award Agreement (awarded pursuant to the 1999 Outside Directors Stock Plan).  Filed as Exhibit 10.2 to the Registrant’s Quarterly Report on Form 10-Q for the second quarter of fiscal 2016 and incorporated herein by reference.

 

10.59#

 

Retirement Agreement with Phillip J. Stassi dated June 1, 2016.  Filed as Exhibit 10.1 to the Registrant’s Quarterly Report on Form 10-Q for the third quarter of fiscal 2016 and incorporated herein by reference.

 

10.60#

 

Offer letter with William Benton Allen, Jr..  Filed as Exhibit 10.1 to the Registrant’s Current Report on Form 8-K on October 14, 2016 and incorporated herein by reference.

 

†10.61#

 

Offer letter with Robert V. Pragada, dated January 28, 2016.

 

 

 

†21.

 

List of Subsidiaries of Jacobs Engineering Group Inc.

 

 

 

†23.

 

Consent of Ernst & Young LLP, Independent Registered Public Accounting Firm.

 

 

 

†31.1

 

Certification of Chief Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

†31.2

 

Certification of Chief Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

†32.1

 

Certification of Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

†32.2

 

Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

†95.

 

Mine Safety Disclosure.

 

 

 

†101.INS

 

XBRL Instance Document

 

 

 

†101.SCH

 

XBRL Taxonomy Extension Schema Document

 

 

 

†101.CAL

 

XBRL Taxonomy Extension Calculation Linkbase Document

 

 

 

†101.DEF

 

XBRL Taxonomy Extension Definition Linkbase Document

 

 

 

†101.LAB

 

XBRL Taxonomy Extension Label Linkbase Document

 

 

 

†101.PRE

 

XBRL Taxonomy Extension Presentation Linkbase Document

 

Being filed herewith.

#

Management contract or compensatory plan or arrangement.

 

 

Page 59


SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

 

 

JACOBS ENGINEERING GROUP INC.

Dated:

 

November 22, 2016

 

By:

 

/S/ Steven J. Demetriou

 

 

 

 

 

 

Steven J. Demetriou

 

 

 

 

 

 

President, Chief Executive Officer, and Chairman

(Principal Executive Officer)

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the Registrant and in the capacities and on the dates indicated:

 

Signature

 

Title

 

Date

/S/ Steven J. Demetriou

 

Chairman of the Board and  Chief Executive Officer (Principal Executive Officer)

 

November 22, 2016

Steven J. Demetriou

 

 

 

 

/S/ Joseph R. Bronson

 

Director

 

November 22, 2016

Joseph R. Bronson

 

 

 

 

/S/ John F. Coyne

 

Director

 

November 22, 2016

John F. Coyne

 

 

 

 

/S/ Juan Jose Suarez Coppel

 

Director

 

November 22, 2016

Juan Jose Suarez Coppel

 

 

 

 

/S/ Robert C. Davidson, Jr.

 

Director

 

November 22, 2016

Robert C. Davidson, Jr.

 

 

 

 

/S/ Ralph E. Eberhart

 

Director

 

November 22, 2016

Ralph E. Eberhart

 

 

 

 

/S/ Dawne S. Hickton

 

Director

 

November 22, 2016

Dawne S. Hickton

 

 

 

 

/S/ Linda Fayne Levinson

 

Director

 

November 22, 2016

Linda Fayne Levinson

 

 

 

 

 

 

Director

 

 

Peter J. Robertson

 

 

 

 

/S/ Christopher M.T. Thompson

 

Director

 

November 22, 2016

Christopher M.T. Thompson

 

 

 

 

/S/ Noel G. Watson

 

Director

 

November 22, 2016

Noel G. Watson

 

 

 

 

/S/ Kevin C. Berryman

 

Executive Vice President,

Chief Financial Officer

(Principal Financial Officer)

 

November 22, 2016

Kevin C. Berryman

 

 

 

 

/S/ William B. Allen

 

Senior Vice President and Chief Accounting Officer

(Principal Accounting Officer)

 

November 22, 2016

William B. Allen

 

 

 

 

 

 

 

Page 60


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

CONSOLIDATED FINANCIAL STATEMENTS

WITH REPORTS OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

September 30, 2016

 

 

F-1


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

INDEX TO CONSOLIDATED FINANCIAL STATEMENTS

September 30, 2016

 

Consolidated Balance Sheets at September 30, 2016 and October 2, 2015

 

F-3

 

 

 

Consolidated Statements of Earnings for the Fiscal Years Ended September 30, 2016, October 2, 2015, and  September 26, 2014

 

F-4

 

 

 

Consolidated Statements of Comprehensive Income for the Fiscal Years Ended September 30, 2016, October  2, 2015 and September  26, 2014

 

F-5

 

 

 

Consolidated Statements of Changes in Stockholders’ Equity for the Fiscal Years Ended September 30, 2016, October  2, 2015 and September  26, 2014

 

F-6

 

 

 

Consolidated Statements of Cash Flows for the Fiscal Years Ended September 30, 2016, October 2, 2015, and September 26, 2014

 

F-7

 

 

 

Notes to Consolidated Financial Statements

 

F-8

 

 

 

Reports of Ernst & Young LLP, Independent Registered Public Accounting Firm

 

F-45

 

 

F-2


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

CONSOLIDATED BALANCE SHEETS

(In thousands, except share information)

At September 30, 2016 and October 2, 2015

 

 

 

2016

 

 

2015

 

ASSETS

 

 

 

 

 

 

 

 

Current Assets:

 

 

 

 

 

 

 

 

Cash and cash equivalents

 

$

655,716

 

 

$

460,859

 

Receivables

 

 

2,115,663

 

 

 

2,548,743

 

Prepaid expenses and other current assets

 

 

93,091

 

 

 

113,076

 

Total current assets

 

 

2,864,470

 

 

 

3,122,678

 

Property, Equipment, and Improvements, Net

 

 

319,673

 

 

 

381,238

 

Other Noncurrent Assets:

 

 

 

 

 

 

 

 

Goodwill

 

 

3,079,628

 

 

 

3,048,778

 

Intangibles

 

 

336,922

 

 

 

353,419

 

Miscellaneous

 

 

759,329

 

 

 

879,813

 

Total other noncurrent assets

 

 

4,175,879

 

 

 

4,282,010

 

 

 

$

7,360,022

 

 

$

7,785,926

 

LIABILITIES AND STOCKHOLDERS’ EQUITY

 

 

 

 

 

 

 

 

Current Liabilities:

 

 

 

 

 

 

 

 

Notes payable

 

$

2,421

 

 

$

13,364

 

Accounts payable

 

 

522,427

 

 

 

566,866

 

Accrued liabilities

 

 

938,378

 

 

 

1,090,985

 

Billings in excess of costs

 

 

319,460

 

 

 

309,951

 

Total current liabilities

 

 

1,782,686

 

 

 

1,981,166

 

Long-term Debt

 

 

385,330

 

 

 

584,434

 

Other Deferred Liabilities

 

 

861,824

 

 

 

863,868

 

Commitments and Contingencies

 

 

 

 

 

 

 

 

Stockholders’ Equity:

 

 

 

 

 

 

 

 

Capital stock:

 

 

 

 

 

 

 

 

Preferred stock, $1 par value, authorized—1,000,000 shares; issued and

   outstanding—none

 

 

 

 

 

 

Common stock, $1 par value, authorized—240,000,000 shares; issued and

   outstanding—120,950,899 shares and 123,152,966 shares, respectively

 

 

120,951

 

 

 

123,153

 

Additional paid-in capital

 

 

1,168,272

 

 

 

1,137,144

 

Retained earnings

 

 

3,586,647

 

 

 

3,496,212

 

Accumulated other comprehensive loss

 

 

(610,594

)

 

 

(464,764

)

Total Jacobs stockholders’ equity

 

 

4,265,276

 

 

 

4,291,745

 

Noncontrolling interests

 

 

64,906

 

 

 

64,713

 

Total Group stockholders’ equity

 

 

4,330,182

 

 

 

4,356,458

 

 

 

$

7,360,022

 

 

$

7,785,926

 

 

See the accompanying Notes to Consolidated Financial Statements.

 

 

F-3


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF EARNINGS

For the Fiscal Years Ended September 30, 2016,  October 2, 2015, and September 26, 2014

(In thousands, except per share information )

 

 

 

2016

 

 

2015

 

 

2014

 

Revenues

 

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

Costs and Expenses:

 

 

 

 

 

 

 

 

 

 

 

 

Direct costs of contracts

 

 

(9,196,326

)

 

 

(10,146,494

)

 

 

(10,621,373

)

Selling, general and administrative expenses

 

 

(1,429,233

)

 

 

(1,522,811

)

 

 

(1,545,716

)

Operating Profit

 

 

338,598

 

 

 

445,527

 

 

 

528,068

 

Other (Expense) Income:

 

 

 

 

 

 

 

 

 

 

 

 

Interest income

 

 

7,848

 

 

 

7,262

 

 

 

9,693

 

Interest expense

 

 

(15,260

)

 

 

(19,503

)

 

 

(11,437

)

Loss on disposal of business and investments

 

 

(41,410

)

 

 

(2,909

)

 

 

 

Gain on sale of intellectual property, net

 

 

 

 

 

 

 

 

12,147

 

Miscellaneous income (expense), net

 

 

(3,053

)

 

 

(240

)

 

 

3,695

 

Total other income (expense), net

 

 

(51,875

)

 

 

(15,390

)

 

 

14,098

 

Earnings Before Taxes

 

 

286,723

 

 

 

430,137

 

 

 

542,166

 

Income Tax Expense

 

 

(72,208

)

 

 

(101,255

)

 

 

(190,054

)

Net Earnings of the Group

 

 

214,515

 

 

 

328,882

 

 

 

352,112

 

Net Earnings Attributable to Noncontrolling Interests

 

 

(4,052

)

 

 

(25,911

)

 

 

(24,004

)

Net Earnings Attributable to Jacobs

 

$

210,463

 

 

$

302,971

 

 

$

328,108

 

Net Earnings Per Share:

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

$

1.75

 

 

$

2.42

 

 

$

2.51

 

Diluted

 

$

1.73

 

 

$

2.40

 

 

$

2.48

 

 

 

F-4


CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

For the Fiscal Years Ended September 30, 2016,  October 2, 2015, and September 26, 2014

(In thousands)

 

 

 

2016

 

 

2015

 

 

2014

 

Net Earnings of the Group

 

$

214,515

 

 

$

328,882

 

 

$

352,112

 

Other Comprehensive (Loss) Income:

 

 

 

 

 

 

 

 

 

 

 

 

Foreign currency translation adjustments

 

 

(46,515

)

 

 

(136,168

)

 

 

(33,316

)

Change in pension liability

 

 

(111,488

)

 

 

33,208

 

 

 

(15,303

)

Gains (losses) on cash flow hedges

 

 

(1,403

)

 

 

2,949

 

 

 

1,022

 

Other Comprehensive Income (Loss) Before Income Taxes

 

 

(159,406

)

 

 

(100,011

)

 

 

(47,597

)

Income Tax Benefit (Expense):

 

 

 

 

 

 

 

 

 

 

 

 

Foreign currency translation adjustments

 

 

 

 

 

 

 

 

3,250

 

Change in pension liability

 

 

13,303

 

 

 

(438

)

 

 

(14,562

)

Gains (losses) on cash flow hedges

 

 

273

 

 

 

(766

)

 

 

(513

)

Income Tax Benefit (Expense)

 

 

13,576

 

 

 

(1,204

)

 

 

(11,825

)

Net Other Comprehensive Income (Loss)

 

 

(145,830

)

 

 

(101,215

)

 

 

(59,422

)

Net Comprehensive Income of the Group

 

 

68,685

 

 

 

227,667

 

 

 

292,690

 

Net Comprehensive Income Attributable to Noncontrolling

   Interests

 

 

(4,052

)

 

 

(25,911

)

 

 

(24,004

)

Total Comprehensive Income

 

$

64,633

 

 

$

201,756

 

 

$

268,686

 

 

See the accompanying Notes to Consolidated Financial Statements including the Company's note on Other Comprehensive Income for a presentation of amounts reclassified to net income during the period

 

 

F-5


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY

For the Fiscal Years Ended September 30, 2016,  October 2, 2015, and September 26, 2014

(In thousands)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Accumulated

 

 

Total

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other Comp-

 

 

Jacobs

 

 

 

 

 

 

Group

 

 

 

 

 

 

 

Additional

 

 

 

 

 

 

rehensive

 

 

Stock-

 

 

Non-

 

 

Stock-

 

 

 

Common

 

 

Paid-in

 

 

Retained

 

 

Income

 

 

holders’

 

 

controlling

 

 

holders’

 

 

 

Stock

 

 

Capital

 

 

Earnings

 

 

(Loss)

 

 

Equity

 

 

Interests

 

 

Equity

 

Balances at September 27, 2013

 

 

131,639

 

 

 

1,084,624

 

 

 

3,300,961

 

 

 

(304,127

)

 

 

4,213,097

 

 

 

35,238

 

 

 

4,248,335

 

Net earnings

 

 

 

 

 

 

 

 

328,108

 

 

 

 

 

 

328,108

 

 

 

24,004

 

 

 

352,112

 

Foreign currency translation adjustments,

   net of deferred tax benefit of $3,250

 

 

 

 

 

 

 

 

 

 

 

(30,066

)

 

 

(30,066

)

 

 

 

 

 

(30,066

)

Pension liability, net of deferred tax

   expense of $14,562

 

 

 

 

 

 

 

 

 

 

 

(29,865

)

 

 

(29,865

)

 

 

 

 

 

(29,865

)

Gain on derivatives, net of deferred

   tax expense of $513

 

 

 

 

 

 

 

 

 

 

 

509

 

 

 

509

 

 

 

 

 

 

509

 

Noncontrolling interest

   acquired / consolidated

 

 

 

 

 

4,779

 

 

 

(15,704

)

 

 

 

 

 

(10,925

)

 

 

(17,724

)

 

 

(28,649

)

Distributions to noncontrolling interests

 

 

 

 

 

 

 

 

(968

)

 

 

 

 

 

(968

)

 

 

(5,113

)

 

 

(6,081

)

Issuances of equity securities, net of

   deferred tax expense of $1,264

 

 

2,254

 

 

 

114,953

 

 

 

 

 

 

 

 

 

117,207

 

 

 

 

 

 

117,207

 

Repurchases of equity securities

 

 

(2,140

)

 

 

(30,498

)

 

 

(85,204

)

 

 

 

 

 

(117,842

)

 

 

 

 

 

(117,842

)

Balances at September 26, 2014

 

 

131,753

 

 

 

1,173,858

 

 

 

3,527,193

 

 

 

(363,549

)

 

 

4,469,255

 

 

 

36,405

 

 

 

4,505,660

 

Net earnings

 

 

 

 

 

 

 

 

302,971

 

 

 

 

 

 

302,971

 

 

 

25,911

 

 

 

328,882

 

Foreign currency translation adjustments

 

 

 

 

 

 

 

 

 

 

 

(136,168

)

 

 

(136,168

)

 

 

 

 

 

(136,168

)

Pension liability, net of deferred tax

   expense of $438

 

 

 

 

 

 

 

 

 

 

 

32,770

 

 

 

32,770

 

 

 

 

 

 

32,770

 

Gain on derivatives, net of deferred

   tax expense of $766

 

 

 

 

 

 

 

 

 

 

 

2,183

 

 

 

2,183

 

 

 

 

 

 

2,183

 

Noncontrolling interest

   acquired / consolidated

 

 

 

 

 

 

 

 

(9,709

)

 

 

 

 

 

(9,709

)

 

 

9,627

 

 

 

(82

)

Distributions to noncontrolling interests

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(7,230

)

 

 

(7,230

)

Issuances of equity securities, net of

   deferred tax expense of $10,332

 

 

1,590

 

 

 

80,801

 

 

 

 

 

 

 

 

 

82,391

 

 

 

 

 

 

82,391

 

Repurchases of equity securities

 

 

(10,190

)

 

 

(117,515

)

 

 

(324,243

)

 

 

 

 

 

(451,948

)

 

 

 

 

 

(451,948

)

Balances at October 2, 2015

 

 

123,153

 

 

 

1,137,144

 

 

 

3,496,212

 

 

 

(464,764

)

 

 

4,291,745

 

 

 

64,713

 

 

 

4,356,458

 

Net earnings

 

 

 

 

 

 

 

 

210,463

 

 

 

 

 

 

210,463

 

 

 

4,052

 

 

 

214,515

 

Foreign currency translation adjustments

 

 

 

 

 

 

 

 

 

 

 

(46,516

)

 

 

(46,516

)

 

 

 

 

 

(46,516

)

Pension liability, net of deferred tax

   income of $13,303

 

 

 

 

 

 

 

 

 

 

 

(98,185

)

 

 

(98,185

)

 

 

 

 

 

(98,185

)

Gain on derivatives, net of deferred

   tax income of $274

 

 

 

 

 

 

 

 

 

 

 

(1,129

)

 

 

(1,129

)

 

 

 

 

 

(1,129

)

Noncontrolling interest

   acquired / consolidated

 

 

 

 

 

(127

)

 

 

 

 

 

 

 

 

(127

)

 

 

(1,150

)

 

 

(1,277

)

Distributions to noncontrolling interests

 

 

 

 

 

 

 

 

(3,146

)

 

 

 

 

 

(3,146

)

 

 

(2,709

)

 

 

(5,855

)

Issuances of equity securities, net of

   deferred tax expense of $3,382

 

 

1,351

 

 

 

72,055

 

 

 

 

 

 

 

 

 

73,406

 

 

 

 

 

 

73,406

 

Repurchases of equity securities

 

 

(3,553

)

 

 

(40,800

)

 

 

(116,882

)

 

 

 

 

 

(161,235

)

 

 

 

 

 

(161,235

)

Balances at September 30, 2016

 

$

120,951

 

 

$

1,168,272

 

 

$

3,586,647

 

 

$

(610,594

)

 

$

4,265,276

 

 

$

64,906

 

 

$

4,330,182

 

 

See the accompanying Notes to Consolidated Financial Statements.

 

 

F-6


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Fiscal Years Ended September 30, 2016,  October 2, 2015, and September 26, 2014

(In thousands)

 

 

 

2016

 

 

2015

 

 

2014

 

Cash Flows from Operating Activities:

 

 

 

 

 

 

 

 

 

 

 

 

Net earnings attributable to the Group

 

$

214,515

 

 

$

328,882

 

 

$

352,112

 

Adjustments to reconcile net earnings to net cash flows from operations:

 

 

 

 

 

 

 

 

 

 

 

 

Depreciation and amortization:

 

 

 

 

 

 

 

 

 

 

 

 

Property, equipment and improvements

 

 

82,363

 

 

 

99,924

 

 

 

98,592

 

Intangible assets

 

 

47,608

 

 

 

49,368

 

 

 

46,820

 

Loss on sales of investments

 

 

17,049

 

 

 

 

 

 

 

Loss on sales of business

 

 

24,361

 

 

 

2,909

 

 

 

 

Gain on sale of certain intellectual property

 

 

 

 

 

 

 

 

(12,147

)

Stock based compensation

 

 

32,370

 

 

 

41,412

 

 

 

43,400

 

Tax benefit (deficiency)  from stock based compensation

 

 

(377

)

 

 

(1,237

)

 

 

1,344

 

Equity in earnings of operating ventures, net

 

 

(11,892

)

 

 

5,483

 

 

 

(8,394

)

Change in pension plan obligations

 

 

(9,380

)

 

 

(5,980

)

 

 

(37,218

)

Change in deferred compensation plans

 

 

576

 

 

 

(3,229

)

 

 

(7,062

)

Losses (gains) on disposals of assets, net

 

 

10,680

 

 

 

30,985

 

 

 

(4,668

)

Changes in assets and liabilities, excluding the effects of businesses acquired:

 

 

 

 

 

 

 

 

 

 

 

 

Receivables

 

 

397,268

 

 

 

172,958

 

 

 

107,944

 

Prepaid expenses and other current assets

 

 

17,906

 

 

 

6,644

 

 

 

(7,217

)

Accounts payable

 

 

(44,214

)

 

 

(28,943

)

 

 

108,241

 

Accrued liabilities

 

 

(71,930

)

 

 

(120,847

)

 

 

(2,172

)

Billings in excess of costs

 

 

33,347

 

 

 

(52,441

)

 

 

29,833

 

Income taxes

 

 

(4,586

)

 

 

(22,685

)

 

 

(17,373

)

Deferred income taxes

 

 

(27,407

)

 

 

(31,177

)

 

 

30,799

 

Other deferred liabilities

 

 

(28,801

)

 

 

(15,759

)

 

 

3,725

 

Deferred gain on  synthetic lease transaction

 

 

 

 

 

23,343

 

 

 

 

Change in long-term receivables

 

 

 

 

 

 

 

 

2,828

 

Long-term insurance prepayment

 

 

 

 

 

 

 

 

(17,411

)

Other, net

 

 

717

 

 

 

4,962

 

 

 

9,740

 

Net cash provided by operating activities

 

 

680,173

 

 

 

484,572

 

 

 

721,716

 

Cash Flows from Investing Activities:

 

 

 

 

 

 

 

 

 

 

 

 

Additions to property and equipment

 

 

(67,688

)

 

 

(88,404

)

 

 

(132,146

)

Disposals of property and equipment

 

 

10,479

 

 

 

369

 

 

 

10,414

 

Purchases of intangibles

 

 

(10,027

)

 

 

 

 

 

 

Purchases of investments

 

 

(3,403

)

 

 

 

 

 

(25,137

)

Sales of investments

 

 

 

 

 

13

 

 

 

58

 

Sale of intellectual property

 

 

 

 

 

 

 

 

12,371

 

Acquisitions of businesses, net of cash acquired

 

 

(49,943

)

 

 

(8,101

)

 

 

(1,384,342

)

Sales of business

 

 

(19,039

)

 

 

 

 

 

 

Net cash used for investing activities

 

 

(139,621

)

 

 

(96,123

)

 

 

(1,518,782

)

Cash Flows from Financing Activities:

 

 

 

 

 

 

 

 

 

 

 

 

Proceeds from long-term borrowings

 

 

1,649,653

 

 

 

1,768,639

 

 

 

819,681

 

Repayments of long-term borrowings

 

 

(1,840,789

)

 

 

(1,907,109

)

 

 

(455,426

)

Proceeds from short-term borrowings

 

 

3,040

 

 

 

362,433

 

 

 

207,876

 

Repayments of short-term borrowings

 

 

(14,042

)

 

 

(382,190

)

 

 

(226,091

)

Proceeds from issuances of common stock

 

 

43,140

 

 

 

33,222

 

 

 

44,704

 

Common stock repurchases

 

 

(152,550

)

 

 

(422,316

)

 

 

(78,399

)

Tax benefit (deficiency) from stock based compensation

 

 

377

 

 

 

1,237

 

 

 

(1,344

)

Dividends paid to noncontrolling interests

 

 

(5,855

)

 

 

(7,230

)

 

 

(6,081

)

Net cash provided by (used for) financing activities

 

 

(317,026

)

 

 

(553,314

)

 

 

304,920

 

Effect of Exchange Rate Changes

 

 

(28,669

)

 

 

(106,923

)

 

 

(31,612

)

Net Increase (Decrease) in Cash and Cash Equivalents

 

 

194,857

 

 

 

(271,788

)

 

 

(523,758

)

Cash and Cash Equivalents at Beginning of Period

 

 

460,859

 

 

 

732,647

 

 

 

1,256,405

 

Cash and Cash Equivalents at End of Period

 

$

655,716

 

 

$

460,859

 

 

$

732,647

 

 

See the accompanying Notes to Consolidated Financial Statements.

 

 

 

F-7


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

 

 

1. Description of Business and Basis of Presentation

Description of Business

We provide a broad range of technical, professional, and construction services including engineering, design, and architectural services; construction and construction management services; operations and maintenance services; and process, scientific, and systems consulting services. We provide our services through offices and subsidiaries located primarily in North America, South America, Europe, the Middle East, India, Australia, Africa, and Asia. We provide our services under cost-reimbursable and fixed-price contracts. The percentage of revenues realized from each of these types of contracts for each of the last three fiscal years was as follows:

 

 

 

2016

 

 

2015

 

 

2014

 

Cost-reimbursable

 

 

82%

 

 

 

83

%

 

 

83

%

Fixed-price

 

 

18%

 

 

 

17

%

 

 

17

%

 

Basis of Presentation, Definition of Fiscal Year, and Other Matters

The accompanying Consolidated Financial Statements have been prepared in accordance with U.S. GAAP and include the accounts of Jacobs Engineering Group Inc. and its subsidiaries and affiliates which it controls. All significant intercompany accounts and transactions have been eliminated in consolidation.

The Company’s fiscal year ends on the Friday closest to September 30 (determined on the basis of the number of workdays) and, accordingly, an additional week of activity is added every five -to- six years.  Fiscal 2015 included an extra week of activity.

During the second quarter of fiscal 2016, we reorganized our operating and reporting structure around four lines of business (“LOB”).  This reorganization is intended to better serve our global clients, leverage our workforce, help streamline operations, and provide enhanced growth opportunities.  The four global LOBs are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial. Previously, the Company operated its business as a single segment.  For a further discussion of our segment information, please refer to Note 15-Segment Information.

Please refer to Note 17— Definitions for the definitions of certain terms used in the accompanying Consolidated Financial Statements and these Notes to Consolidated Financial Statements.

 

 

 

2. Significant Accounting Policies

Revenue Accounting for Contracts and Use of Joint Ventures

In general, we recognize revenues at the time we provide services. Depending on the commercial terms of the contract, we recognize revenues either when costs are incurred, or using the percentage-of-completion method of accounting by comparing contract costs incurred to date to the total estimated costs at completion. Contract losses are provided for in their entirety in the period they become known, without regard to the percentage-of-completion. For multiple contracts with a single customer we account for each contract separately. We also recognize as revenues, costs associated with claims and unapproved change orders to the extent it is probable that such claims and change orders will result in additional contract revenue and the amount of such additional revenue can be reliably estimated.

Certain cost-reimbursable contracts include incentive-fee arrangements. These incentive fees can be based on a variety of factors but the most common are the achievement of target completion dates, target costs, and/or other performance criteria. Failure to meet these targets can result in unrealized incentive fees. We recognize incentive fees based on expected results using the percentage-of-completion method of accounting. As the contract progresses and more information becomes available, the estimate of the anticipated incentive fee that will be earned is revised as necessary. We bill incentive fees based on the terms and conditions of the individual contracts. In certain situations, we are allowed to bill a portion of the incentive fees over the performance period of the contract. In other situations, we are allowed to bill incentive fees only after the target criterion has been achieved. Incentive fees which have been recognized but not billed are included in receivables in the accompanying Consolidated Balance Sheets.

F-8


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Certain cost-reimbursable contracts with government customers as well as certain commercial clients provide that contract costs are subject to audit and adjustment. In this situation, revenues are recorded at the time services are performed based upon the amounts we expect to realize upon completion of the contracts. Revenues are not recognized for non-recoverable costs. In those situations where an audit indicates that we may have billed a client for costs not allowable under the terms of the contract, we estimate the amount of such nonbillable costs and adjust our revenues accordingly.

When we are directly responsible for subcontractor labor or third-party materials and equipment, we reflect the costs of such items in both revenues and costs (and we refer to such costs as “pass-through” costs). On those projects where the client elects to pay for such items directly and we have no associated responsibility for such items, these amounts are not reflected in either revenues or costs.

The following table sets forth pass-through costs included in revenues for each of the last three fiscal years (in millions):

 

2016

 

 

2015

 

 

2014

 

$

2,489.9

 

 

$

2,602.6

 

 

$

2,954.9

 

As is common to the industry, we execute certain contracts jointly with third parties through various forms of joint ventures and consortiums. Although the joint ventures own and hold the contracts with the clients, the services required by the contracts are typically performed by us and our joint venture partners, or by other subcontractors under subcontracting agreements with the joint ventures. The assets of our joint ventures, therefore, consist almost entirely of cash and receivables (representing amounts due from clients), and the liabilities of our joint ventures consist almost entirely of amounts due to the joint venture partners (for services provided by the partners to the joint ventures under their individual subcontracts) and other subcontractors. In general, at any given time, the equity of our joint ventures represents the undistributed profits earned on contracts the joint ventures hold with clients. Very few of our joint ventures have employees. None of our joint ventures have third-party debt or credit facilities. Our joint ventures, therefore, are simply mechanisms used to deliver engineering and construction services to clients. Rarely do they, in and of themselves, present any risk of loss to us or to our partners separate from those that we would carry if we were performing the contract on our own. Under U.S. GAAP, our share of profits and losses associated with the contracts held by the joint ventures, if and when they occur, has always been reflected in our Consolidated Financial Statements.

Certain of our joint ventures meet the definition of a VIE. In evaluating our VIEs for possible consolidation, we perform a qualitative analysis to determine whether or not we have a “controlling financial interest” in the VIE as defined by U.S. GAAP. We consolidate only those VIEs over which we have a controlling financial interest.

For the Company’s unconsolidated joint ventures, we use either the equity method of accounting or proportional consolidation.

There were no changes in facts and circumstances during the period that caused the Company to reassess the method of accounting for its VIEs.

Fair Value Measurements

The net carrying amounts of cash and cash equivalents, trade receivables and payables, and notes payable approximate Fair Value due to the short-term nature of these instruments. Similarly, we believe the carrying value of long-term debt also approximates Fair Value based on the interest rates and scheduled maturities applicable to the outstanding borrowings. Certain other assets and liabilities, such as forward contracts and an interest rate swap agreement we purchased as cash-flow hedges discussed in Note 11 — Commitments and Contingencies and Derivative Financial Instruments are required to be carried in our Consolidated Financial Statements at Fair Value.

The Fair Value of the Company’s reporting units (used for purposes of determining whether there is an indication of possible impairment of the carrying value of goodwill) is determined using both an income approach and a market approach. Both approaches require us to make certain estimates and judgments. Under the income approach, Fair Value is determined by using the discounted cash flows of our reporting units. Under the market approach, the Fair Values of our reporting units are determined by reference to guideline companies that are reasonably comparable to our reporting units; the Fair Values are estimated based on the valuation multiples of the invested capital associated with the guideline companies. In assessing

F-9


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

whether there is an indication that the carrying value of goodwill has been impaired, we utilize the results of both valuation techniques and consider the range of Fair Values indicated. The range of values (both ends of the range) for each reporting unit exceeded the respective book values by over 28% to 90%.

With respect to equity-based compensation (i.e., share-based payments), we estimate the Fair Value of stock options granted to employees and directors using the Black-Scholes option-pricing model. Like all option-pricing models, the Black-Scholes model requires the use of subjective assumptions including (i) the expected volatility of the market price of the underlying stock, and (ii) the expected term of the award, among others. Accordingly, changes in assumptions and any subsequent adjustments to those assumptions can cause different Fair Values to be assigned to our stock option awards. For restricted stock units containing service and market conditions, compensation expense is based on the Fair Value of such units using a Monte Carlo simulation.

The Fair Values of the assets owned by the various pension plans that the Company sponsors are determined based on the type of asset, consistent with U.S. GAAP. Equity securities are valued by using market observable data such as quoted prices. Publicly traded corporate equity securities are valued at the last reported sale price on the last business day of the year. Securities not traded on the last business day are valued at the last reported bid price. Debt securities are valued at the last reported sale price on the last business day applicable. Real estate consists primarily of common or collective trusts, with underlying investments in real estate. These investments are valued using the best information available, including quoted market price, market prices for similar assets when available, internal cash flow estimates discounted at an appropriate interest rate, or independent appraisals, as appropriate. Insurance contracts, investments in infrastructure/raw goods, and hedge funds are valued using actuarial assumptions and values reported by the fund managers.

The methodologies described above and elsewhere in these Notes to Consolidated Financial Statements may produce a Fair Value measure that may not be indicative of net realizable value or reflective of future Fair Values. Furthermore, while the Company believes its valuation methods are appropriate and consistent with other market participants, the use of different methodologies or assumptions to determine the Fair Value of certain financial instruments could result in a different Fair Value measurement.

Cash Equivalents

We consider all highly liquid investments with original maturities of less than three months to be cash equivalents. Cash equivalents at September 30, 2016 and October 2, 2015 consisted primarily of money market mutual funds and overnight bank deposits.

Receivables and Billings in Excess of Costs

Receivables include billed receivables, unbilled receivables, and retentions receivable. Billed receivables represent amounts invoiced to clients in accordance with the terms of our client contracts. They are recorded in our financial statements when they are issued. Unbilled receivables and retentions receivable represent reimbursable costs and amounts earned and reimbursable under contracts in progress as of the respective balance sheet dates. Such amounts become billable according to the contract terms, which usually consider the passage of time, achievement of certain milestones or completion of the project. We anticipate that substantially all of such unbilled amounts will be billed and collected over the next fiscal year.

Certain contracts allow us to issue invoices to clients in advance of providing services. Billings in excess of costs represent billings to, and cash collected from, clients in advance of work performed. We anticipate that substantially all such amounts will be earned over the next twelve months.

Property, Equipment, and Improvements

Property, equipment and improvements are carried at cost, and are shown net of accumulated depreciation and amortization in the accompanying Consolidated Balance Sheets. Depreciation and amortization is computed primarily by using the straight-line method over the estimated useful lives of the assets. The cost of leasehold improvements is amortized using the straight-line method over the lesser of the estimated useful life of the asset or the remaining term of the related lease. Estimated useful lives range from 20 to 40 years for buildings, from 3 to 10 years for equipment and from 4 to 10 years for leasehold improvements.

F-10


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Goodwill and Other Intangible Assets

Goodwill represents the excess of the cost of an acquired business over the Fair Value of the net tangible and intangible assets acquired. Goodwill and intangible assets with indefinite lives are not amortized; instead, we test goodwill and intangible assets with indefinite lives for possible impairment. We conduct such tests annually (or more frequently if events occur or circumstances change that would more likely than not reduce the Fair Values of our reporting units below their respective carrying values).

In the second quarter of fiscal 2016, we reorganized of our operations around four global lines of business. The four global lines, which represent our reporting units are: Petroleum & Chemicals, Buildings & Infrastructure, Aerospace & Technology, and Industrial.   Previously, the Company had two reporting units, “Europe” and “Non-Europe”

In conjunction with the aforementioned reorganization, we performed a quantitative impairment test and we allocated goodwill among our new reporting units based on the relative fair value of the new reporting units. As a result, during the second quarter of fiscal 2016, we performed a quantitative assessment of goodwill for each of the Company’s reporting units (both immediately before and after the reorganization). Based on this quantitative assessment, the fair value of each of the reporting units (pre and post reorganization) exceeded their respective net book values, and accordingly no impairment charge was recorded as a result of the reorganization.

In performing the Company’s annual impairment test as of the end of the third quarter of fiscal 2016 the Company performed a qualitative assessment, and determined that it was more likely than not that the fair value of its reporting units exceeded their carrying amounts. As a result, the Company did not proceed to a quantitative impairment assessment.

 We have determined that the fair value of our reporting units substantially exceeded their respective carrying values for the Consolidated Balance Sheets presented.

The Company had $3.0 billion of Goodwill at October 2, 2015.  The following table presents the components of our Goodwill at September 30, 2016 by Reporting Unit (in thousands):

 

 

 

2016

 

Aerospace & Technology

 

$

988,274

 

Buildings & Infrastructure

 

 

792,561

 

Industrial

 

 

591,757

 

Petroleum & Chemicals

 

 

707,036

 

Total Goodwill

 

$

3,079,628

 

F-11


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table provides certain information related to the Company’s acquired intangible assets for each of the fiscal years presented (in thousands):

 

 

 

Customer

Relationships,

Contracts, and

Backlog

 

 

Developed

Technology

 

 

Trade

Names

 

 

Patents

 

 

Other

 

 

Total

 

Balances, September 27, 2013

 

 

195,527

 

 

 

18,911

 

 

 

2,179

 

 

 

-

 

 

 

1,287

 

 

 

217,904

 

Acquisitions

 

 

249,164

 

 

 

 

 

 

15,049

 

 

 

 

 

 

 

 

 

264,213

 

Amortization

 

 

(37,737

)

 

 

(1,533

)

 

 

(3,251

)

 

 

-

 

 

 

(693

)

 

 

(43,214

)

Foreign currency translation

 

 

1,087

 

 

 

 

 

 

171

 

 

 

-

 

 

 

31

 

 

 

1,289

 

Balances, September 26, 2014

 

 

408,041

 

 

 

17,378

 

 

 

14,148

 

 

 

-

 

 

 

625

 

 

 

440,192

 

Acquisitions

 

 

(4,315

)

 

 

 

 

 

(1,292

)

 

 

 

 

 

300

 

 

 

(5,307

)

Amortization

 

 

(39,967

)

 

 

(1,533

)

 

 

(4,172

)

 

 

-

 

 

 

(277

)

 

 

(45,949

)

Foreign currency translation

 

 

(34,418

)

 

 

 

 

 

(1,085

)

 

 

-

 

 

 

(14

)

 

 

(35,517

)

Balances, October 2, 2015

 

 

329,341

 

 

 

15,845

 

 

 

7,599

 

 

 

-

 

 

 

634

 

 

 

353,419

 

Acquisitions

 

 

7,286

 

 

 

 

 

 

859

 

 

 

10,027

 

 

 

-

 

 

 

18,172

 

Amortization

 

 

(38,595

)

 

 

(1,534

)

 

 

(3,819

)

 

 

-

 

 

 

(454

)

 

 

(44,402

)

Foreign currency translation

 

 

9,605

 

 

 

 

 

 

147

 

 

 

-

 

 

 

(19

)

 

 

9,733

 

Balances, September 30, 2016

 

 

307,637

 

 

 

14,311

 

 

 

4,786

 

 

 

10,027

 

 

 

161

 

 

 

336,922

 

Weighted Average Amortization Period (years)

 

8.4

 

 

9.3

 

 

5

 

 

25

 

 

3.2

 

 

8.9

 

 

The weighted average amortization period includes the effects of foreign currency translation.

The above table excludes the values assigned to those intangible assets embedded in the Company’s equity method investment in AWE Management Ltd. (“AWE”) and Guimar Engenharia LTDA ("Guimar"). Those amounts are included in the carrying value of the Company’s investment in AWE and Guimar. The amount of amortization expense we estimate we will record during each of the next five fiscal years relating to intangible assets existing at September 30, 2016, including those associated with AWE and Guimar, is: fiscal 2017 - $44.5 million; fiscal 2018 - $44.6 million; fiscal 2019 - $43.2 million; fiscal 2020 - $41.1 million; and fiscal 2021 - $37.7 million. The amounts reported for future amortization include the effect of exchange rate changes.

Foreign Currencies

In preparing our Consolidated Financial Statements, it is necessary to translate the financial statements of our subsidiaries operating outside the U.S., which are denominated in currencies other than the U.S. dollar, into the U.S. dollar. In accordance with U.S. GAAP, revenues and expenses of operations outside the U.S. are translated into U.S. dollars using weighted-average exchange rates for the applicable periods being translated while the assets and liabilities of operations outside the U.S. are generally translated into U.S. dollars using period-end exchange rates. The net effect of foreign currency translation adjustments is included in stockholders’ equity as a component of accumulated other comprehensive income (loss) in the accompanying Consolidated Balance Sheets.

Share-Based Payments

We measure the value of services received from employees and directors in exchange for an award of an equity instrument based on the grant-date Fair Value of the award. The computed value is recognized as a non-cash cost on a straight-line basis over the period the individual provides services, which is typically the vesting period of the award with the exception of awards containing an internal performance measure which is recognized on a straight-line basis over the vesting period subject to the probability of meeting the performance requirements and adjusted for the number of shares expected to be earned. The cost of these awards is recorded in selling, general and administrative expense in the accompanying Consolidated Statements of Earnings.

F-12


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table presents our stock-based compensation expense for the various types of awards made by the Company for each of the fiscal years presented (in thousands):

 

Award Type

 

2016

 

 

2015

 

 

2014

 

Restricted Stock and Restricted Stock Units (excluding

   Market and Performance Awards)

 

$

21,156

 

 

$

20,779

 

 

$

17,307

 

Stock Options

 

 

7,165

 

 

 

10,683

 

 

 

10,829

 

Market and Performance Awards

 

 

4,049

 

 

 

9,950

 

 

 

15,264

 

Total Expense

 

$

32,370

 

 

$

41,412

 

 

$

43,400

 

 

The Company has two incentive plans whereby eligible employees and directors of Jacobs may be granted stock options, restricted stock, and/or restricted stock units.

Stock Options —Substantially all of the stock options granted during the year were awarded on the same date for all employees and directors (although the date is different for employees and directors). The following table presents the assumptions used in the Black-Scholes option-pricing model during each of the last three fiscal years for awards made to employees and directors:

 

 

 

Awards Made to Employees

 

 

Awards Made to Directors

 

 

 

2016

 

 

2015

 

 

2014

 

 

2016

 

 

2015

 

 

2014

 

Dividend yield

 

 

%

 

 

%

 

 

%

 

 

%

 

 

%

 

 

%

Expected volatility

 

 

27.77

%

 

 

27.00

%

 

 

34.25

%

 

 

29.21

%

 

 

29.28

%

 

 

35.30

%

Risk-free interest rate

 

 

1.82

%

 

 

1.67

%

 

 

1.79

%

 

 

1.44

%

 

 

1.63

%

 

 

1.76

%

Expected term of options (in years)

 

5.82

 

 

5.82

 

 

 

5.82

 

 

5.82

 

 

5.82

 

 

 

5.82

 

 

Market and Performance Awards — The Company granted restricted stock units containing service, performance, and market conditions. The PSUs are earned over a three-year performance period if the specified performance metrics are met.  During fiscal year 2014, the performance-based restricted stock unit award is split equally between Relative TSR Restricted Stock Units and Net Earnings Growth Restricted Stock Units. During fiscal year 2015, the Company only granted Net Earnings Growth Restricted Stock Units.  For fiscal 2016, half of the PSUs granted were Relative TSR Restricted Stock Units and the other half of the PSUs were EPS Based Restricted Stock Units.

The number of Relative TSR Restricted Stock Units in which the employee may ultimately vest shall be equal to the Relative TSR grant multiplied by the TSR Performance Multiplier. The TSR Performance Multiplier will be determined by comparing the Company's total stockholder return to the total stockholder return of each of the companies in a specified industry peer group over the three year period immediately following the award date. For purposes of computing total stockholder return, the beginning stock price will be the average closing stock price over the 30 calendar day period ending on the award date ("Performance Period"), and the ending stock price will be the average closing price over the 30 calendar day period ending on the last day of the Performance Period. Any dividend payments made over the Performance Period will be deemed re-invested on the ex-dividend date in additional shares of the related Company.

The following table presents the basis on which the Relative TSR Restricted Stock Units are determined:

 

Company TSR Percentile Rank

 

TSR Performance

Multiplier

 

Below 30th percentile

 

 

%

30th percentile

 

 

50

%

50th percentile

 

 

100

%

70th percentile or above

 

 

150

%

 

If the Company's total stockholder return over the Performance Period falls between any of the brackets described above, the TSR Performance Multiplier will be determined using straight line interpolation based on the actual percentile ranking.

F-13


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Substantially all of the TSR restricted stock units awarded during the year are awarded on the same date. The following table presents the assumptions used to value the TSR Restricted Stock Units:

 

 

 

2016

 

 

2015

 

 

2014

 

Dividend yield

 

 

%

 

 

%

 

 

%

Expected volatility

 

 

25.06

%

 

 

%

 

 

24.77

%

Risk-free interest rate

 

 

1.21

%

 

 

%

 

 

0.80

%

Expected term (in years)

 

 

3

 

 

 

-

 

 

 

3

 

 

2013 Awards

The number of Net Earnings Growth Restricted Stock Units awarded in fiscal year 2013 in which an employee may ultimately vest shall be equal to the sum of the following: (1) an amount, not less than zero, equal to one-third of the earned Net Earnings Growth Restricted Stock Units grant multiplied by the Net Earnings Growth Performance Multiplier (or, "NEGPM", as defined) determined based upon the growth in the Company's Net Earnings (as defined) over the period starting on the first day of the Company's third quarter of fiscal 2013 and ending on the last day of the Company's second quarter of fiscal 2014; plus, (2) an amount, not less than zero, equal to (A) two-thirds of the earned Net Earnings Growth Restricted Stock Units grant multiplied by the NEGPM determined based upon the average growth in the Company's Net Earnings over the period starting on the first day of the Company's third quarter of fiscal 2013 and ending on the last day of the Company's second quarter of fiscal 2015, minus (B) the amount determined pursuant to (1) above; plus, (3) an amount, not less than zero, equal to (A) the earned Net Earnings Growth Restricted Stock Units grant multiplied by the NEGPM determined based upon the average growth in the Company's Net Earnings over the period starting on the first day of the Company's third quarter of fiscal 2013 and ending on the last day of the Company's second quarter of fiscal 2016, minus (B) the amount determined pursuant to (1) and (2) above.

2014 and 2015 Awards

For Net Earnings Growth Restricted Stock Units awarded in fiscal years 2014 and 2015, all of the criteria referenced in the paragraph above are the same over the three year vesting period with the exception of the performance period. The performance periods for fiscal years 2014 and 2015 are based upon the Company's Net Earnings (as defined) over the period starting on the first day of the Company's third quarter of fiscal 2014 and ending on the last day of the Company's second quarter of fiscal 2017 and the Company's Net Earnings (as defined) over the period starting on the first day of the Company's third quarter of fiscal 2015 and ending on the last day of the Company's second quarter of fiscal 2018, respectively.

If the Company's average growth in Net Earnings over the applicable fiscal years during the respective performance periods is between 5% and 10%, 10% and 15%, or 15% and 20%, the Net Earnings Growth Performance Multiplier will be determined using straight line interpolation based on the actual average growth in the Company's consolidated net earnings attributable to Jacobs.

The following table presents the basis on which the Net Earnings Growth Restricted Stock Units are determined:

 

Average Net

Earnings Growth

 

 

Net Earnings Growth Performance

Multiplier

 

Less than 5%

 

 

 

%

 

5%

 

 

 

50

%

 

10%

 

 

 

100

%

 

15%

 

 

 

150

%

 

20%

 

 

 

200

%

 

Unless stated otherwise, the Net Earnings Growth Restricted Stock Units awards are valued based on the closing price of the Company's common stock as reported in the NYSE Composite Price History on their respective grant dates.

 

 

2016 Awards

F-14


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

For the EPS Based Awards issued in fiscal 2016, the number of restricted stock units to be issued on the maturity date of November 19, 2018 is based on the Company’s EPS growth over fiscal 2016, 2017 and 2018. The number of restricted stock units to be issued equals the sum of: (i) an amount, not less than zero, equal to one-third of the target number of restricted stock units multiplied by an EPS Performance Multiplier for that period determined based upon the growth in the Company’s EPS (“EPS Growth Rate”) from fiscal 2015 to fiscal 2016; (ii) an amount, not less than zero, equal to two-thirds of the target number of restricted stock units multiplied by an EPS Performance Multiplier determined based upon the Compound Annual EPS Growth Rate for fiscal 2017 as compared to fiscal 2015, minus the amount of shares earned pursuant to clause (i); and (iii) an amount, not less than zero, equal to the target number of restricted stock units multiplied by an EPS Performance Multiplier determined based upon the Compound Annual EPS Growth Rate for fiscal 2018 as compared to fiscal 2015, minus the amount of shares earned pursuant to clauses (i) and (ii).

 

The “Compound Annual EPS Growth Rate” for purposes of clauses (ii) and (iii) above means the EPS Growth Rate, which when multiplied twice times fiscal 2015 EPS (in the case of clause (ii)) or three times fiscal 2015 EPS (in the case of clause (iii)) results in a number equal to actual fiscal 2017 EPS and fiscal 2018 EPS, respectively. The “EPS Performance Multiplier” is determined by reference to the following table based upon the Company’s EPS Growth Rate or Compound Annual EPS Growth Rate over the relevant fiscal periods. The Compensation Committee set these metrics based on the Company’s plan at the start of the fiscal year.

 

EPS Growth Rate or Compound Annual EPS Growth Rate

 

 

EPS Performance Multiplier

 

Less than 4%

 

 

 

%

 

4%

 

 

 

50

%

7.5%

 

 

 

100

%

 

15%

 

 

 

150

%

20% or greater

 

 

 

200

%

 

 

 

 

 

 

 

If the EPS Growth Rate or Compound Annual EPS Growth Rate falls between 4% and 7.5%, 7.5% and 15%, or 15% and 20%, the EPS Performance Multiplier will be determined using linear interpolation based on the actual growth in EPS.

 

Unless stated otherwise, the EPS Based Restricted Stock Units awards are valued based on the closing price of the Company's common stock as reported in the NYSE Composite Price History on their respective grant dates.

Concentrations of Credit Risk

Our cash balances and cash equivalents are maintained in accounts held by major banks and financial institutions located primarily in North America, South America, Europe, the Middle East, India, Australia, Africa, and Asia. In the normal course of business, and consistent with industry practices, we grant credit to our clients without requiring collateral. Concentrations of credit risk is the risk that, if we extend a significant amount of credit to clients in a specific geographic area or industry, we may experience disproportionately high levels of default if those clients are adversely affected by factors particular to their geographic area or industry. Concentrations of credit risk relative to trade receivables are limited due to our diverse client base, which includes the U.S. federal government and multi-national corporations operating in a broad range of industries and geographic areas. Additionally, in order to mitigate credit risk, we continually evaluate the credit worthiness of our major commercial clients.

Use of Estimates and Assumptions

The preparation of financial statements in conformity with U.S. GAAP requires us to employ estimates and make assumptions that affect the reported amounts of certain assets and liabilities; the revenues and expenses reported for the periods covered by the financial statements; and certain amounts disclosed in these Notes to the Consolidated Financial Statements. Although such estimates and assumptions are based on management’s most recent assessment of the underlying facts and circumstances utilizing the most current information available and past experience, actual results could differ

F-15


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

significantly from those estimates and assumptions. Our estimates, judgments, and assumptions are evaluated periodically and adjusted accordingly.

Earlier in these Notes to Consolidated Financial Statements we discussed three significant accounting policies that rely on the application of estimates and assumptions: revenue recognition for long-term construction contracts; the process for testing goodwill for possible impairment; and the accounting for share-based payments to employees and directors. The following is a discussion of certain other significant accounting policies that rely on the use of estimates:

Accounting for Pensions — We use certain assumptions and estimates in order to calculate periodic pension cost and the value of the assets and liabilities of our pension plans. These assumptions involve discount rates, investment returns, and projected salary increases, among others. Changes in the actuarial assumptions may have a material effect on the plans’ liabilities and the projected pension expense. 

Accounting for Income Taxes — We determine our consolidated income tax expense using the asset and liability method prescribed by U.S. GAAP. Under this method, deferred tax assets and liabilities are recognized for the temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and income tax purposes. Such deferred tax assets and liabilities are adjusted, as appropriate, to reflect changes in tax rates expected to be in effect when the temporary differences reverse. If and when we determine that a deferred tax asset will not be realized for its full amount, we will recognize and record a valuation allowance with a corresponding charge to earnings. Judgment is required in determining our worldwide provision for income taxes. In the normal course of business, we may engage in numerous transactions every day for which the ultimate tax outcome (including the period in which the transaction will ultimately be included in taxable income or deducted as an expense) is uncertain. Additionally, we file income, franchise, gross receipts and similar tax returns in many jurisdictions. Our tax returns are subject to audit and investigation by the Internal Revenue Service, most states in the U.S., and by various government agencies representing many jurisdictions outside the U.S.

Contractual Guarantees, Litigation, Investigations, and Insurance — In the normal course of business we are subject to certain contractual guarantees and litigation. We record in the Consolidated Balance Sheets amounts representing our estimated liability relating to such guarantees, litigation, and insurance claims. We perform an analysis to determine the level of reserves to establish for both insurance-related claims that are known and have been asserted against us as well as for insurance-related claims that are believed to have been incurred based on actuarial analysis, but have not yet been reported to our claims administrators as of the respective balance sheet dates. We include any adjustments to such insurance reserves in our Consolidated Statements of Earnings. In addition, as a contractor providing services to various agencies of the U.S. federal government, we are subject to many levels of audits, investigations, and claims by, or on behalf of, the U.S. federal government with respect to contract performance, pricing, costs, cost allocations, and procurement practices. We adjust revenues based upon the amounts we expect to realize considering the effects of any client audits or governmental investigations.

Accounting for Business Combinations — U.S. GAAP requires that the purchase price paid for business combinations accounted for using the acquisition method be allocated to the assets and liabilities acquired based on their respective Fair Values. Determining the Fair Value of contract assets and liabilities acquired often requires estimates and judgments regarding, among other things, the estimated cost to complete such contracts. The Company must also make certain estimates and judgments relating to other assets and liabilities acquired as well as any identifiable intangible assets acquired.

New Accounting Pronouncements

In May 2014, the FASB issued ASU No. 2014-09— Revenue from Contracts with Customers. The new guidance provided by ASU 2014-09 is intended to remove inconsistencies and perceived weaknesses in the existing revenue requirements, provide a more robust framework for addressing revenue issues, improve comparability, provide information that is more useful and simplify the preparation of financial statements. ASU 2014-09 was initially effective for annual and interim reporting periods beginning after December 15, 2016. On July 9, 2015, the FASB approved a one-year deferral of the effective date of this standard. The revised effective date for the standard is for annual reporting periods beginning after December 15, 2017 and interim periods therein. The FASB also approved changes allowing for early adoption of the standard as of the original effective date. The Company has completed its initial assessment of the new standard and is in the process of developing a plan to assess its contracts with customers.  The Company currently intends to adopt the new standard using

F-16


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

the Modified Retrospective application.  This standard could have a significant impact on the Company’s Consolidated Financial Statements and an administrative impact on its operations.  The Company will further assess the impact through its implementation program.

In February 2016, the FASB issued ASU 2016-02— Leases. ASU 2016-02 requires lessees to recognize assets and liabilities for most leases. ASU 2016-02 is effective for public entity financial statements for annual periods beginning after December 15, 2018, and interim periods within those annual periods. Early adoption is permitted, including adoption in an interim period. The guidance must be adopted using a modified retrospective approach for leases that exist or are entered into after the beginning of the earliest comparative period in the financial statements. The Company is evaluating the impact of the new guidance on its consolidated financial statements. This standard could have a significant impact on the Company’s Consolidated Financial Statements and an administrative impact on its operations.  The Company will further assess the impact through its implementation program.

In March 2016, the FASB issued ASU 2016-09— Improvements to Employee Share-Based Payment Accounting.  ASU 2016-09 simplifies several aspects of the accounting for share-based payment transactions, including the income tax consequences, classification of awards as either equity or liabilities, and classification on the statement of cash flows. ASU 2016-09 is effective for annual periods beginning after December 15, 2016, and interim periods within those annual periods. Early adoption is permitted for any entity in any interim or annual period for which financial statements have not been issued or made available for issuance. If an entity early adopts the amendments in an interim period, any adjustments must be reflected as of the beginning of the fiscal year that includes that interim period. An entity that elects early adoption must adopt all of the amendments in the same period. The Company is evaluating the impact of the new guidance on its consolidated financial statements and does not expect it to have a material impact.

During the second quarter of fiscal 2016, the Company adopted the provisions of ASU 2015-17— Balance Sheet Classification of Deferred Taxes on a retrospective basis for all periods presented.  ASU 2015-17 removes the requirement to separate deferred income tax liabilities and assets into current and noncurrent amounts in a classified statement of financial position. Instead, the update requires that deferred tax liabilities and assets be classified as noncurrent in a classified statement of financial position. As a result of the Company’s adoption of ASU 2015-17 in the second quarter of fiscal 2016, the current deferred taxes and noncurrent deferred tax assets included in miscellaneous noncurrent assets on the October 2, 2015 Consolidated Balance Sheet were reclassified to noncurrent deferred taxes, which increased noncurrent deferred tax assets by $160.3 million and decreased miscellaneous noncurrent assets by $213.8 million.

 

 

3. Employee Stock Purchase and Stock Option Plans

Broad-Based, Employee Stock Purchase Plans

Under the 1989 ESPP and the GESPP, eligible employees who elect to participate in these plans are granted the right to purchase shares of the common stock of Jacobs at a discount that is limited to 5% of the per-share market value on the day shares are sold to employees. The following table summarizes the stock issuance activity under the 1989 ESPP and the GESPP during each of the last three fiscal years:

 

 

 

2016

 

 

2015

 

 

2014

 

Aggregate Purchase Price Paid for Shares

   Sold:

 

 

 

 

 

 

 

 

 

 

 

 

Under the 1989 ESPP

 

$

23,631,241

 

 

$

28,621,800

 

 

$

30,354,723

 

Under the GESPP

 

 

2,660,067

 

 

 

3,535,479

 

 

 

3,314,046

 

Total

 

$

26,291,308

 

 

$

32,157,279

 

 

$

33,668,769

 

Aggregate Number of Shares Sold:

 

 

 

 

 

 

 

 

 

 

 

 

Under the 1989 ESPP

 

$

564,461

 

 

$

696,853

 

 

$

553,201

 

Under the GESPP

 

 

63,196

 

 

 

84,361

 

 

 

59,883

 

Total

 

$

627,657

 

 

$

781,214

 

 

$

613,084

 

 

At September 30, 2016, there remains 599,506 shares reserved for issuance under the 1989 ESPP and 64,628 shares reserved for issuance under the GESPP.

F-17


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Stock Incentive Plans

We also sponsor the 1999 SIP and the 1999 ODSP. The 1999 SIP provides for the issuance of incentive stock options, nonqualified stock options, share appreciation rights ("SAR"), restricted stock, and restricted stock units to employees. The 1999 ODSP provides for awards of shares of common stock, restricted stock, and restricted stock units, and grants of nonqualified stock options to our outside (i.e., nonemployee) directors. The following table sets forth certain information about the 1999 Plans:

 

 

 

1999 SIP

 

 

1999 ODSP

 

 

Total

 

Number of shares authorized

 

 

29,850,000

 

 

 

1,100,000

 

 

 

30,950,000

 

Number of remaining shares reserved for

   issuance at September 30, 2016

 

 

10,532,310

 

 

 

597,910

 

 

 

11,130,220

 

Number of shares relating to outstanding stock

   options at September 30, 2016

 

 

3,299,137

 

 

 

278,375

 

 

 

3,577,512

 

Number of shares available for future awards:

 

 

 

 

 

 

 

 

 

 

 

 

At September 30, 2016

 

 

7,233,173

 

 

 

319,535

 

 

 

7,552,708

 

At October 2, 2015

 

 

7,103,759

 

 

 

41,125

 

 

 

7,144,884

 

 

Effective September 28, 2012, all grants of shares under the 1999 SIP are issued on a fungible basis.  An award other than an option or SAR are granted on a 1.92-to-1.00 basis (“Fungible”). An award of an option or SAR are granted on a 1-to-1 basis (“Not Fungible”).

The following table presents the Fair Value of shares (of restricted stock and restricted stock units) vested during each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Restricted Stock and Restricted Stock Units

   (service condition)

 

$

17,481

 

 

$

18,568

 

 

$

6,820

 

Restricted Stock Units (service, market, and

   performance conditions at target)

 

 

4,336

 

 

 

11,264

 

 

 

18,675

 

Total

 

$

21,817

 

 

$

29,832

 

 

$

25,495

 

 

The following table presents the Company’s total pre-tax compensation cost relating to share-based payments included in the accompanying Consolidated Statements of Earnings (in thousands):  

 

2016

 

 

2015

 

 

2014

 

$

32,370

 

 

$

41,412

 

 

$

43,400

 

At September 30, 2016, the amount of compensation cost relating to nonvested awards not yet recognized in the financial statements is approximately $85.4 million. The majority of the unrecognized compensation costs will be recognized by the third quarter of fiscal 2019. The weighted average remaining contractual term of options currently exercisable is 5.4 years.

F-18


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Stock Options

The following table summarizes the stock option activity for each of the last three fiscal years:

 

 

 

Number of

Stock

Options

 

 

Weighted

Average

Exercise

Price

 

Outstanding at September 27, 2013

 

 

4,606,212

 

 

$

52.33

 

Granted

 

 

602,525

 

 

$

53.51

 

Exercised

 

 

(718,065

)

 

$

47.18

 

Cancelled or expired

 

 

(269,525

)

 

$

54.46

 

Outstanding at September 26, 2014

 

 

4,221,147

 

 

$

53.23

 

Granted

 

 

614,759

 

 

$

43.56

 

Exercised

 

 

(34,000

)

 

$

31.54

 

Cancelled or expired

 

 

(729,199

)

 

$

86.15

 

Outstanding at October 2, 2015

 

 

4,072,707

 

 

$

46.06

 

Granted

 

 

460,770

 

 

$

42.17

 

Exercised

 

 

(412,416

)

 

$

40.88

 

Cancelled or expired

 

 

(543,549

)

 

$

49.13

 

Outstanding at September 30, 2016

 

 

3,577,512

 

 

$

45.69

 

 

Stock options outstanding at September 30, 2016 consisted entirely of nonqualified stock options. The following table presents the total intrinsic value of stock options exercised during each of the last three fiscal years (in thousands):

 

 

2016

 

 

2015

 

 

2014

 

$

4,149

 

 

$

442

 

 

$

9,590

 

The total intrinsic value of stock options exercisable at September 30, 2016 was approximately $17.9 million. The following table presents certain other information regarding our 1999 Plans:

 

 

 

2016

 

 

2015

 

 

2014

 

At fiscal year end:

 

 

 

 

 

 

 

 

 

 

 

 

Range of exercise prices for options

   outstanding

 

$32.51–$80.63

 

 

$32.51–$80.63

 

 

$25.87–$94.11

 

Number of options exercisable

 

 

2,581,421

 

 

 

2,590,560

 

 

 

2,725,980

 

For the fiscal year:

 

 

 

 

 

 

 

 

 

 

 

 

Range of prices relating to options

   exercised

 

$36.88–$55.00

 

 

$25.87–$42.74

 

 

$20.98–$57.54

 

Estimated weighted average fair values of

   options granted

 

$

12.80

 

 

$

13.41

 

 

$

19.04

 

 

F-19


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table presents certain information regarding stock options outstanding, and stock options exercisable at September 30, 2016:

 

 

 

Options Outstanding

 

 

Options Exercisable

 

Range of Exercise Prices

 

Number

 

 

Weighted

Average

Remaining

Contractual

Life

(years)

 

 

Weighted

Average

Price

 

 

Number

 

 

Weighted

Average

Exercise

Price

 

$32.51 - $37.03

 

 

337,875

 

 

 

5.51

 

 

 

37.00

 

 

 

337,875

 

 

 

37.00

 

$37.43 - $46.37

 

 

2,096,554

 

 

 

5.87

 

 

 

42.67

 

 

 

1,328,450

 

 

 

42.60

 

$47.11 - $55.53

 

 

1,059,633

 

 

 

6.11

 

 

 

52.84

 

 

 

853,071

 

 

 

52.68

 

$60.08 - $80.63

 

 

83,450

 

 

 

5.48

 

 

 

65.99

 

 

 

62,025

 

 

 

67.93

 

 

 

 

3,577,512

 

 

 

5.90

 

 

 

45.69

 

 

 

2,581,421

 

 

 

45.81

 

 

The 1999 Plans allow participants to satisfy the exercise price of stock options by tendering shares of Jacobs common stock that have been owned by the participants for at least six months. Shares so tendered are retired and canceled, and are shown as repurchases of common stock in the accompanying Consolidated Statements of Stockholders’ Equity.

Restricted Stock

The following table presents the number of shares of restricted stock and restricted stock units issued under the 1999 SIP during each of the last three fiscal years:

 

 

 

2016

 

 

2015

 

 

2014

 

Restricted stock

 

 

597,091

 

 

 

507,882

 

 

 

589,150

 

Restricted stock units (service condition)

 

 

183,131

 

 

 

126,635

 

 

 

287,545

 

Restricted stock units (service and

   performance conditions)

 

 

372,794

 

 

 

219,965

 

 

 

432,700

 

 

The amount of restricted stock units issued for awards with performance and market conditions in the above table are based on the target amount. The number of shares ultimately issued, which could be greater or less than target, will be based on achieving specific performance conditions described in Note 2 – Significant Accounting Policies.

The share amounts in the above tables reflect the Non-Fungible share counting of 1 share for each share of restricted stock and restricted stock unit issued.

The following table presents the number of shares of restricted stock and restricted stock units cancelled and withheld for taxes under the 1999 SIP during each of the last three fiscal years:

 

 

 

2016

 

 

2015

 

 

2014

 

Restricted stock

 

 

512,903

 

 

 

326,480

 

 

 

147,221

 

Restricted stock units (service condition)

 

 

177,640

 

 

 

70,296

 

 

 

12,333

 

Restricted stock units (service and

   performance conditions)

 

 

275,933

 

 

 

194,116

 

 

 

52,000

 

 

The amount of restricted stock units cancelled for awards with market and performance conditions in the above table is based on the target amount.

The share amounts in the above tables reflect the Non-Fungible share counting of 1 share for each share of restricted stock and restricted stock unit issued.

F-20


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The restrictions attached to restricted stock and restricted stock units generally relate to the recipient’s ability to sell or otherwise transfer the stock or stock units. There are also restrictions that subject the stock and stock units to forfeiture back to the Company until earned by the recipient through continued employment or service.

 

The following table provides the number of shares of restricted stock and restricted stock units outstanding at September 30, 2016 under the 1999 SIP. Shares granted prior to September 29, 2012 are not Fungible (granted on a 1-to-1 basis). Shares Granted after September 28, 2012 are Fungible (granted on a 1.92 -to-1.00 basis):

 

 

 

Not Fungible

 

 

Fungible

 

 

Total

 

Restricted stock

 

 

245,150

 

 

 

1,444,927

 

 

 

1,690,077

 

Restricted stock units (service condition)

 

 

57,300

 

 

 

466,588

 

 

 

523,888

 

Restricted stock units (service and

   performance conditions at target)

 

 

 

 

 

721,934

 

 

 

721,934

 

 

The following table presents the number of shares of restricted stock and restricted stock units issued under the 1999 ODSP during each of the last three fiscal years:

 

 

 

2016

 

 

2015

 

 

2014

 

Restricted stock units (service condition)

 

 

23,090

 

 

 

13,500

 

 

 

15,000

 

 

The following table provides the number of shares of restricted stock and restricted stock units outstanding at September 30, 2016 under the 1999 ODSP:

 

 

 

2016

 

Restricted stock

 

 

34,000

 

Restricted stock units (service condition)

 

 

88,590

 

 

All shares granted under the 1999 ODSP are issued on a 1-to-1 basis.

 

 

4. Earnings Per Share

Basic and Diluted Earnings Per Share

The following table (i) reconciles the denominator used to compute Basic EPS to the denominator used to compute Diluted EPS for each of the last three fiscal years, and (ii) discloses the number of antidilutive stock options, shares of restricted stock, and restricted stock units outstanding at the end of each of the fiscal years indicated (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Shares used to calculate EPS:

 

 

 

 

 

 

 

 

 

 

 

 

Weighted average shares outstanding

   (denominator used to compute basic EPS)

 

 

120,133

 

 

 

125,007

 

 

 

130,483

 

Diluted effect of stock options and restricted stock

 

 

1,350

 

 

 

1,103

 

 

 

1,888

 

Denominator used to compute diluted EPS

 

 

121,483

 

 

 

126,110

 

 

 

132,371

 

Antidilutive stock options and restricted stock

 

 

2,142

 

 

 

3,237

 

 

 

2,074

 

 

Share Repurchases

On July 23, 2015, the Board of Directors approved a share repurchase program up to $500 million of the Company's common stock over the ensuing three years (the "2015 Share Repurchase Program").  As authorized, share repurchases may be executed through various means including, without limitation, open market transactions, privately negotiated transactions

F-21


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

or otherwise. The share repurchase program did not obligate the Company to purchase any shares, and expires on July 22, 2018.  The timing of shares repurchases may depend upon market conditions, other uses of capital, and other factors.

The following table summarizes the activity under this program during fiscal 2016 (in thousands, except per-share amounts):

 

Amount

Authorized

(in thousands)

 

 

Average

Price Per

Share (1)

 

 

Total

Shares

Retired

(In thousands)

 

 

Shares Repurchased

(In thousands)

2016

 

$

500,000

 

 

$

44.76

 

 

 

3,408

 

 

 

3,408

 

 

(1)

Includes commissions paid and calculated as the average price per share since the repurchase program authorization date.

 

 

5.  Restructuring Charges

        

          During the second quarter of fiscal 2015, the Company began implementing a series of initiatives intended to improve operational efficiency, reduce costs, and better position itself to drive growth of the business in the future (the “2015 Restructuring”).  The 2015 Restructuring was not completed in fiscal 2015, and actions related to the 2015 Restructuring continued throughout fiscal 2016.  Actions related to the 2015 Restructuring completed during fiscal 2015 and fiscal 2016 include involuntary terminations, the abandonment of certain leased offices, combining operational organizations, and the co-location of employees into other existing offices.  We are not exiting any service types or client-end-markets in connection with the 2015 Restructuring.

 

      The majority of the costs of the 2015 Restructuring are included in SG&A expense in the Consolidated Statement of Earnings for the fiscal year ended September 30, 2016.  The following table summarizes the impact of the 2015 Restructuring on the Company’s reportable segments for the fiscal year ended September 30, 2016 (in thousands):

 

 

2016

 

Aerospace & Technology

 

5,835

 

Buildings & Infrastructure

 

23,378

 

Industrial

 

29,690

 

Petroleum & Chemicals

$

87,188

 

Corporate

 

41,816

 

Total Restructuring Charges

$

187,907

 

 

The Company’s accrual for the 2015 Restructuring as of October 2, 2015 was $102.2 million.  There were $187.9 million of charges and $137.9 million of payments during fiscal 2016.  The accrual balance was $152.2 million at September 30, 2016.

 

 

 

 

6. Borrowings

Short-Term Credit Arrangements

The Company maintains both committed and uncommitted credit arrangements with several banks providing for short-term borrowing capacity and overdraft protection. There were borrowings of $2.4 million outstanding under these short-term credit facilities at a weighted average interest rate of 4.38% at September 30, 2016, and there were borrowings of $13.4 million outstanding under these short-term credit facilities at October 2, 2015.

F-22


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Long-term Debt

On February 7, 2014, Jacobs and certain of its subsidiaries entered into a $1.6 billion long-term unsecured, revolving credit facility (the "2014 Facility") with a syndicate of large U.S. and international banks and financial institutions. The following table presents certain information regarding the Company’s long-term revolving credit facilities at September 30, 2016 and October 2, 2015 (dollars in thousands):

 

2016

 

2015

Principal

Balance

Outstanding

 

 

Range

of Interest

Rates

 

Principal

Balance

Outstanding

 

 

Range

of Interest

Rates

$

385,330

 

 

1.0% – 1.65%

 

$

584,434

 

 

1.0% – 1.51%

 

The total amount outstanding under the 2014 Facility in the form of direct borrowings at September 30, 2016 was $385.3 million. The Company issued $2.5 million in letters of credit leaving $1.21 billion of available borrowing capacity under the 2014 Facility at September 30, 2016. In addition, the Company had $253.5 million issued under separate, committed and uncommitted letter-of-credit facilities for total issued letters of credit of $256.0 million at September 30, 2016.

The 2014 Facility expires in February 2019 and permits the Company to borrow under two separate tranches in U.S. dollars, certain specified foreign currencies, and any other currency that may be approved in accordance with the terms of the 2014 Facility. Depending on the Company's Consolidated Leverage Ratio, borrowings under the 2014 Facility will bear interest at either a eurocurrency rate plus a margin of between 1.0% and 1.5% or a base rate plus a margin of between 0% and 0.5%. The 2014 Facility also provides for a financial letter of credit subfacility of $300.0 million, permits performance letters of credit, and provides for a $50.0 million subfacility for swingline loans. Letters of credit are subject to fees based on the Company's Consolidated Leverage Ratio at the time any such letter of credit is issued. The 2014 Facility also provides an accordion feature that allows the Company and the lenders to increase the facility amount to $2.1 billion. The Company pays a facility fee of between 0.100% and 0.25% per annum depending on the Company's Consolidated Leverage Ratio. Amounts outstanding under the 2014 Facility may be prepaid at the option of the Company without premium or penalty, subject to customary breakage fees in connection with the prepayment of eurocurrency loans. The 2014 Facility contains affirmative, negative, and financial covenants customary for financings of this type including, among other things, limitations on certain other indebtedness, loans and investments, liens, mergers, asset sales and transactions with affiliates. In addition, the 2014 Facility contains customary events of default. We were in compliance with our debt covenants at September 30, 2016.

The following table presents certain additional information regarding the Company’s long-term debt for the fiscal years shown:

 

 

 

2016

 

 

2015

 

Maximum amount outstanding at any month-end

   during the fiscal year

 

$

958,460

 

 

$

1,006,899

 

Average amount outstanding during the year

 

$

825,641

 

 

$

943,258

 

Weighted average interest rate during the year

 

 

1.39

%

 

 

1.28

%

 

The following table presents the amount of interest paid by the Company during each of the last three fiscal years (in thousands):

 

2016

 

 

2015

 

 

2014

 

$

13,282

 

 

$

15,506

 

 

$

13,841

 

 

 

7. Pension and Other Postretirement Benefit Plans

Company-Only Sponsored Plans

We sponsor various defined benefit pension plans covering employees of certain U.S. and international subsidiaries. The pension plans provide pension benefits that are based on the employee’s compensation and years of service. Our funding

F-23


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

policy is to fund the actuarially determined accrued benefits where applicable, allowing for projected compensation increases using the projected unit method.

The accounting for pension and other post-retirement benefit plans requires the use of assumptions and estimates in order to calculate periodic benefit cost and the value of the plans’ assets and benefit obligations.  These assumptions include discount rates, investment returns, and projected salary increases, among others.  The discount rates used in valuing the plans' benefit obligations were determined with reference to high quality corporate and government bonds that are appropriately matched to the duration of each plan's obligations.  The expected long-term rate of return on plan assets is generally based on using country-specific simulation models which select a single outcome for expected return based on the target asset allocation.  The expected long-term-rates of return used in the valuation are the annual average returns generated by these assumptions over a 20-year period for each asset class based on the expected long-term rate of return of the underlying assets.

The following table sets forth the changes in the plans’ combined net benefit obligation (segregated between plans existing within and outside the U.S.) during each of the fiscal years presented (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Net benefit obligation at the beginning of the year

 

$

533,665

 

 

$

495,788

 

 

$

1,155,592

 

 

$

1,196,520

 

Service cost

 

 

9,875

 

 

 

12,045

 

 

 

14,378

 

 

 

21,374

 

Interest cost

 

 

16,746

 

 

 

20,629

 

 

 

38,892

 

 

 

44,659

 

Participants’ contributions

 

 

1,847

 

 

 

2,743

 

 

 

2,255

 

 

 

4,402

 

Actuarial (gains)/losses

 

 

29,129

 

 

 

42,749

 

 

 

382,691

 

 

 

30,238

 

Benefits paid

 

 

(14,143

)

 

 

(40,289

)

 

 

(32,277

)

 

 

(35,662

)

Curtailments/settlements

 

 

(35,224

)

 

 

 

 

 

(35,375

)

 

 

(5,763

)

Plan amendments

 

 

 

 

 

 

 

 

 

 

 

(1,612

)

Transfers *

 

 

(356,231

)

 

 

 

 

 

 

 

 

 

Effect of exchange rate changes

 

 

 

 

 

 

 

 

(162,374

)

 

 

(98,564

)

Net benefit obligation at the end of the year

 

$

185,664

 

 

$

533,665

 

 

$

1,363,782

 

 

$

1,155,592

 

      * Pension plan transferred to a new service provider for the plan

 

 

 

 

 

 

 

 

 

 

The following table sets forth the changes in the combined Fair Value of the plans’ assets (segregated between plans existing within and outside the U.S.) during each of the fiscal years presented (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Fair value of plan assets at the beginning of the year

 

$

379,907

 

 

$

415,350

 

 

$

896,298

 

 

$

876,171

 

Actual return on plan assets

 

 

28,835

 

 

 

(1,754

)

 

 

242,927

 

 

 

86,411

 

Employer contributions

 

 

10,213

 

 

 

3,857

 

 

 

23,217

 

 

 

39,326

 

Participants’ contributions

 

 

1,847

 

 

 

2,743

 

 

 

2,255

 

 

 

4,402

 

Gross benefits paid

 

 

(14,143

)

 

 

(40,289

)

 

 

(32,277

)

 

 

(35,662

)

Curtailments/settlements

 

 

(35,224

)

 

 

 

 

 

(1,863

)

 

 

(1,646

)

Transfers*

 

 

(228,971

)

 

 

 

 

 

 

 

 

 

Effect of exchange rate changes

 

 

 

 

 

 

 

 

(126,646

)

 

 

(72,704

)

Fair value of plan assets at the end of the year

 

$

142,464

 

 

$

379,907

 

 

$

1,003,911

 

 

$

896,298

 

      * Pension plan transferred to a new service provider for the plan

 

 

 

 

 

 

 

 

 

 

During fiscal 2016 we also curtailed our U.K. and French pension plans.

 

F-24


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table reconciles the combined funded statuses of the plans recognized in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 (segregated between plans existing within and outside the U.S.) (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Net benefit obligation at the end of the year

 

$

185,664

 

 

$

533,665

 

 

$

1,363,782

 

 

$

1,155,592

 

Fair value of plan assets at the end of the year

 

 

142,464

 

 

 

379,907

 

 

 

1,003,911

 

 

 

896,298

 

Under funded amount recognized at the end of the year

 

$

43,200

 

 

$

153,758

 

 

$

359,871

 

 

$

259,294

 

 

The following table presents the accumulated benefit obligation at September 30, 2016 and October 2, 2015 (segregated between plans existing within and outside the U.S.) (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

 

Accumulated benefit obligation at the end of the year

 

 

185,664

 

 

 

488,024

 

 

 

1,331,884

 

 

 

1,113,016

 

 

 

The following table presents the amounts recognized in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 (segregated between plans existing within and outside the U.S.) (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Prepaid benefit cost included in prepaid assets

 

$

 

 

$

 

 

$

492

 

 

$

4,054

 

Accrued benefit cost included in current liabilities

 

 

 

 

 

 

 

 

608

 

 

 

381

 

Accrued benefit cost included in noncurrent liabilities

 

 

43,200

 

 

 

153,758

 

 

 

359,755

 

 

 

262,967

 

Net amount recognized at the end of the year

 

$

43,200

 

 

$

153,758

 

 

$

359,871

 

 

$

259,294

 

 

In fiscal 2015 and through June 30, 2016, we were responsible for administering a U.S. pension plan for participating employees of which are assigned to, and worked exclusively on, a specific operating contract with the U.S. federal government. The costs of this pension plan were fully reimbursed by the U.S. federal government pursuant to applicable cost accounting standards.  Accordingly, included in “Miscellaneous Noncurrent Assets” in the accompanying Consolidated Balance Sheet at October 2, 2015 was a receivable from the U.S. federal government of approximately $115.5 million representing the underfunded amount for this pension plan.  As of June 30, 2016, we ceased performing on this operating contract, and, as such, we are no longer responsible for administering this pension plan. As a result of no longer administering the plan, we derecognized the plan benefit obligation and plan assets pertaining to the plan resulting in a decrease of plan benefit obligation by $356.2 million and plan assets by $229.0 million.

The following table presents the significant actuarial assumptions used in determining the funded statuses and the following year's benefit cost of the Company’s U.S. plans for each fiscal year presented:

 

 

 

2016

 

 

2015

 

 

2014

 

Weighted average discount rates

 

 

3.2

%

 

3.9% to 4.0%

 

 

3.9% to 4.4%

 

Rates of compensation increases

 

 

%

 

 

3.0

%

 

 

2.95

%

Return on Assets

 

 

7.4

%

 

 

7.4

%

 

 

7.70

%

 

The following table presents the significant actuarial assumptions used in determining the funded statuses and the following year's benefit cost of the Company’s non-U.S. pension plans for each fiscal year presented:

 

 

 

2016

 

2015

 

2014

Weighted average discount rates

 

0.7% to 7.0%

 

1.6% to 7.8%

 

1.8% to 8.8%

Rates of compensation increases

 

2.5% to 7.5%

 

2.4% to 7.5%

 

2.6% to 7.5%

Expected long-term rates of return on assets

 

3.5% to 8.5%

 

3.5% to 8.5%

 

4.5% to 8.5%

 

F-25


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table presents certain amounts relating to our U.S. pension plans recognized in accumulated other comprehensive loss at September 30, 2016, October 2, 2015 and September 26,  2014 (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Arising during the period:

 

 

 

 

 

 

 

 

 

 

 

 

Net actuarial loss

 

$

4,337

 

 

$

12,237

 

 

$

1,378

 

Reclassification adjustments:

 

 

 

 

 

 

 

 

 

 

 

 

Net actuarial gain

 

 

(2,312

)

 

 

(2,347

)

 

 

(2,255

)

Total

 

$

2,025

 

 

$

9,890

 

 

$

(877

)

 

The following table presents certain amounts relating to our non-U.S. pension plans recognized in accumulated other comprehensive loss at September 30, 2016, October 2, 2015 and September 26,  2014(in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Arising during the period:

 

 

 

 

 

 

 

 

 

 

 

 

Net actuarial (gain) loss

 

$

102,925

 

 

$

(27,165

)

 

$

48,752

 

Prior service cost (benefit)

 

 

580

 

 

 

(1,512

)

 

 

(1

)

Total

 

 

103,505

 

 

 

(28,677

)

 

 

48,751

 

Reclassification adjustments:

 

 

 

 

 

 

 

 

 

 

 

 

Net actuarial gain

 

 

(7,508

)

 

 

(14,034

)

 

 

(12,914

)

Prior service benefit

 

 

163

 

 

 

51

 

 

 

(19

)

Total

 

 

(7,345

)

 

 

(13,983

)

 

 

(12,933

)

Total

 

$

96,160

 

 

$

(42,660

)

 

$

35,818

 

 

The following table presents certain amounts relating to our pension plans recorded in accumulated other comprehensive loss that have not yet been recognized as components of net periodic benefit cost at September 30, 2016, and October 2, 2015 (segregated between U.S. and non-U.S. plans) (in thousands):

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Plans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Net actuarial loss

 

$

61,483

 

 

$

59,458

 

 

$

304,345

 

 

$

208,929

 

Prior service cost

 

 

 

 

 

 

 

 

(1,203

)

 

 

(1,947

)

Total

 

$

61,483

 

 

$

59,458

 

 

$

303,142

 

 

$

206,982

 

 

The following table presents the amount of accumulated comprehensive income that will be amortized against earnings as part of our net periodic benefit cost in fiscal 2017 based on 2016 exchange rates (segregated between U.S. and non-U.S. plans) (in thousands):

 

 

 

U.S.

Pension

Plans

 

 

Non-U.S.

Pension

Plans

 

Unrecognized net actuarial loss

 

$

3,985

 

 

$

10,676

 

Unrecognized prior service cost

 

 

 

 

 

(313

)

Accumulated comprehensive loss to be recorded against

   earnings

 

$

3,985

 

 

$

10,363

 

 

We consider various factors in developing the estimates for the expected, long-term rates of return on plan assets. These factors include the projected, long-term rates of returns on the various types of assets in which the plans invest, as well as historical returns. In general, investment allocations are determined by each plan’s trustees and/or investment committees. The objectives of the plans’ investment policies are to (i) maximize returns while preserving capital; (ii) provide returns sufficient to meet the current and long-term obligations of the plan as the obligations become due; and (iii) maintain a diversified portfolio of assets so as to reduce the risk associated with having a disproportionate amount of the plans’ total assets invested in any one type of asset, issuer or geography. None of our pension plans hold Jacobs common stock directly

F-26


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

(although some plans may hold shares indirectly through investments in mutual funds). The plans’ weighted average asset allocations at September 30, 2016 and October 2, 2015 (the measurement dates used in valuing the plans’ assets and liabilities) were as follows:

 

 

 

U.S. Pension Plans

 

 

Non-U.S. Pension Pans

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Equity securities

 

 

71

%

 

 

70

%

 

 

25

%

 

 

25

%

Debt securities

 

 

20

%

 

 

21

%

 

 

32

%

 

 

31

%

Real estate investments

 

 

2

%

 

 

3

%

 

 

6

%

 

 

7

%

Other

 

 

7

%

 

 

6

%

 

 

37

%

 

 

37

%

 

The following table presents the Fair Value of the Company’s Domestic U.S. plan assets at September 30, 2016, segregated by level of Fair Value measurement inputs within the Fair Value hierarchy promulgated by U.S. GAAP (in thousands):

 

 

 

Fair Value, Determined Using Fair Value Measurement Inputs

 

 

 

Level 1

 

 

Level 3

 

 

Total

 

U.S. Domestic equities

 

$

85,494

 

 

$

 

 

$

85,494

 

Overseas equities

 

 

15,169

 

 

 

 

 

 

15,169

 

U.S. Domestic bonds

 

 

28,886

 

 

 

 

 

 

28,886

 

Cash and equivalents

 

 

3,723

 

 

 

 

 

 

3,723

 

Real estate

 

 

 

 

 

3,477

 

 

 

3,477

 

Hedge funds

 

 

 

 

 

5,715

 

 

 

5,715

 

Total

 

$

133,272

 

 

$

9,192

 

 

$

142,464

 

 

The following table presents the Fair Value of the Company’s non-U.S. pension plan assets at September 30, 2016, segregated by level of Fair Value measurement inputs within the Fair Value hierarchy promulgated by U.S. GAAP (in thousands):

 

 

 

Fair Value, Determined Using Fair Value Measurement Inputs

 

 

 

Level 1

 

 

Level 3

 

 

Total

 

U.S. Domestic equities

 

$

31,972

 

 

$

 

 

$

31,972

 

Overseas equities

 

 

220,179

 

 

 

 

 

 

220,179

 

U.S. Domestic bonds

 

 

258,949

 

 

 

 

 

 

258,949

 

Overseas bonds

 

 

61,974

 

 

 

 

 

 

61,974

 

Cash and equivalents

 

 

63,182

 

 

 

 

 

 

63,182

 

Real estate

 

 

 

 

 

55,665

 

 

 

55,665

 

Insurance contracts

 

 

 

 

 

39,473

 

 

 

39,473

 

Hedge funds

 

 

 

 

 

272,517

 

 

 

272,517

 

Total

 

$

636,256

 

 

$

367,655

 

 

$

1,003,911

 

 

The following table presents the Fair Value of the Company’s U.S. pension plan assets at October 2, 2015, segregated by level of Fair Value measurement inputs within the Fair Value hierarchy promulgated by U.S. GAAP (in thousands):

 

 

 

Fair Value, Determined Using Fair Value Measurement Inputs

 

 

 

Level 1

 

 

Level 3

 

 

Total

 

U.S. Domestic equities

 

$

225,362

 

 

$

 

 

$

225,362

 

Overseas equities

 

 

41,414

 

 

 

 

 

 

41,414

 

U.S. Domestic bonds

 

 

80,804

 

 

 

 

 

 

80,804

 

Cash and equivalents

 

 

6,041

 

 

 

 

 

 

6,041

 

Real estate

 

 

 

 

 

9,914

 

 

 

9,914

 

Hedge funds

 

 

 

 

 

16,372

 

 

 

16,372

 

Total

 

$

353,621

 

 

$

26,286

 

 

$

379,907

 

F-27


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

 

The following table presents the Fair Value of the Company’s non-U.S. pension plan assets at October 2, 2015, segregated by level of Fair Value measurement inputs within the Fair Value hierarchy promulgated by U.S. GAAP (in thousands):

 

 

 

Fair Value, Determined Using Fair Value Measurement Inputs

 

 

 

Level 1

 

 

Level 3

 

 

Total

 

U.S. Domestic equities

 

$

28,007

 

 

$

 

 

$

28,007

 

Overseas equities

 

 

198,309

 

 

 

 

 

 

198,309

 

U.S. Domestic bonds

 

 

203,266

 

 

 

 

 

 

203,266

 

Overseas bonds

 

 

71,545

 

 

 

 

 

 

71,545

 

Cash and equivalents

 

 

39,933

 

 

 

 

 

 

39,933

 

Real estate

 

 

 

 

 

61,996

 

 

 

61,996

 

Insurance contracts

 

 

 

 

 

32,522

 

 

 

32,522

 

Hedge funds

 

 

 

 

 

260,720

 

 

 

260,720

 

Total

 

$

541,060

 

 

$

355,238

 

 

$

896,298

 

 

At September 30, 2016 and October 2, 2015, the Company holds no assets in the U.S. or non-U.S. pension plans that use Level 2 fair value measurement inputs.

The following table summarizes the changes in the Fair Value of the Company’s U.S. Pension Plans’ Level 3 assets for the year ended September 30, 2016 (in thousands):

 

 

 

Real

Estate

 

 

Hedge

Funds

 

Balance, beginning of year

 

$

9,914

 

 

$

16,372

 

Purchases, sales, and settlements

 

 

(6,530

)

 

 

(10,788

)

Realized and unrealized gains (losses)

 

 

93

 

 

 

131

 

Balance, end of year

 

$

3,477

 

 

$

5,715

 

 

The following table summarizes the changes in the Fair Value of the Company’s non-U.S. Pension Plans’ Level 3 assets for the year ended September 30, 2016 (in thousands):

 

 

 

Real

Estate

 

 

Insurance

Contracts

 

 

Hedge

Funds

 

Balance, beginning of year

 

$

61,996

 

 

$

32,522

 

 

$

260,720

 

Purchases, sales, and settlements

 

 

(462

)

 

 

(165

)

 

 

(1,205

)

Realized and unrealized gains

 

 

2,572

 

 

 

6,451

 

 

 

57,656

 

Effect of exchange rate changes

 

 

(8,441

)

 

 

665

 

 

 

(44,654

)

Balance, end of year

 

$

55,665

 

 

$

39,473

 

 

$

272,517

 

 

The following table summarizes the changes in the Fair Value of the Company’s U.S. Pension Plans’ Level 3 assets for the year ended October 2, 2015 (in thousands):

 

 

 

Real

Estate

 

 

Hedge

Funds

 

Balance, beginning of year

 

$

-

 

 

$

16,304

 

Purchases

 

 

10,616

 

 

 

 

Sales

 

 

 

 

 

68

 

Realized and unrealized losses

 

 

(702

)

 

 

-

 

Balance, end of year

 

$

9,914

 

 

$

16,372

 

 

F-28


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table summarizes the changes in the Fair Value of the Company’s non-U.S. Pension Plans’ Level 3 assets for the year ended October 2, 2015 (in thousands):  

 

 

 

Real

Estate

 

 

Insurance

Contracts

 

 

Hedge

Funds

 

Balance, beginning of year

 

$

59,966

 

 

$

37,468

 

 

$

213,936

 

Purchases, sales, and settlements

 

 

1,271

 

 

 

526

 

 

 

4,760

 

Realized and unrealized gains

 

 

5,390

 

 

 

1,353

 

 

 

54,719

 

Effect of exchange rate changes

 

 

(4,631

)

 

 

(6,825

)

 

 

(12,695

)

Balance, end of year

 

$

61,996

 

 

$

32,522

 

 

$

260,720

 

 

The following table presents the amount of cash contributions we anticipate making into the plans during fiscal 2017 (in thousands):  

 

 

 

U.S.

Pension Plans

 

 

Non-U.S.

Pension  Pans

 

Anticipated cash contributions

 

 

 

 

$

20,016

 

 

The following table presents the total benefit payments expected to be paid to pension plan participants during each of the next five fiscal years, and in total for the five years thereafter (in thousands):

 

 

 

U.S.

Pension Plans

 

 

Non-U.S.

Pension  Pans

 

2017

 

$

11,589

 

 

$

27,902

 

2018

 

 

11,916

 

 

 

29,627

 

2019

 

 

11,935

 

 

 

31,039

 

2020

 

 

12,009

 

 

 

30,416

 

2021

 

 

12,095

 

 

 

31,933

 

For the periods 2022 through 2026

 

 

59,090

 

 

 

194,569

 

 

The following table presents the components of net periodic benefit cost for the Company’s U.S. pension plans recognized in the accompanying Consolidated Statements of Earnings for each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Service cost

 

$

9,875

 

 

$

12,045

 

 

$

12,077

 

Interest cost

 

 

16,746

 

 

 

20,629

 

 

 

22,041

 

Expected return on plan assets

 

 

(22,368

)

 

 

(29,526

)

 

 

(28,495

)

Actuarial loss

 

 

7,512

 

 

 

3,756

 

 

 

3,608

 

Prior service cost

 

 

(176

)

 

 

(239

)

 

 

(103

)

Net pension cost, before special items

 

 

11,589

 

 

 

6,665

 

 

 

9,128

 

Settlement loss

 

 

8,061

 

 

 

 

 

 

 

Total net periodic pension cost recognized

 

$

19,650

 

 

$

6,665

 

 

$

9,128

 

 

The fiscal 2016 settlement loss included in the U.S. pension plan net periodic benefit cost table above related to the previously discussed transfer of a U.S. pension plan to a new service provider.

F-29


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

 

The following table presents the components of net periodic benefit cost for the Company’s Non-U.S. pension plans recognized in the accompanying Consolidated Statements of Earnings for each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Service cost

 

$

14,378

 

 

$

21,374

 

 

$

25,374

 

Interest cost

 

 

38,892

 

 

 

44,659

 

 

 

54,208

 

Expected return on plan assets

 

 

(50,190

)

 

 

(53,052

)

 

 

(56,394

)

Actuarial loss

 

 

9,092

 

 

 

17,398

 

 

 

15,993

 

Prior service cost

 

 

(260

)

 

 

(96

)

 

 

(28

)

Net pension cost, before special items

 

 

11,912

 

 

 

30,283

 

 

 

39,153

 

Curtailments and settlements

 

 

(7,512

)

 

 

255

 

 

 

(15,894

)

Total net periodic pension cost recognized

 

$

4,400

 

 

$

30,538

 

 

$

23,259

 

 

The fiscal 2016 settlement loss included in the Non-U.S. pension plan net periodic benefit cost table above related to the previously discussed sale of the Company’s French subsidiary.  

Multiemployer Plans

In Canada and the U.S., we contribute to various trusteed pension plans covering hourly construction employees under industry-wide agreements. We also contribute to various trusteed plans in Australia and certain countries in Europe covering both hourly and certain salaried employees. Contributions are based on the hours worked by employees covered under these agreements and are charged to direct costs of contracts on a current basis.

The majority of the contributions the Company makes to multiemployer pension plans are outside the U.S. With respect to these multiemployer plans, the Company's liability to fund these plans is generally limited to the contributions we are required to make under collective bargaining agreements.

Based on our review of our multiemployer pension plans under the guidance provided in ASU 2011-09— Compensation-Retirement Benefits-Multiemployer Plans, we have concluded that none of the multiemployer pension plans into which we contribute are individually significant to our Consolidated Financial Statements.

The following table presents the Company’s contributions to these multiemployer plans during each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Canada

 

$

44,912

 

 

$

42,575

 

 

$

56,341

 

Europe

 

$

8,771

 

 

$

10,902

 

 

$

12,693

 

United States

 

$

5,058

 

 

$

5,968

 

 

$

4,485

 

Contributions to multiemployer pension plans

 

$

58,741

 

 

$

59,445

 

 

$

73,519

 

 

 

F-30


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

8. Other Comprehensive Income

The following table presents amounts reclassified from changes in pension liabilities in other comprehensive income to direct cost of contracts and selling, general and administrative expenses in the Company's Consolidated Statements of Earnings for the periods presented related to the Company's defined benefit pension plans (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Amortization of Defined Benefit Items:

 

 

 

 

 

 

 

 

 

 

 

 

Actuarial losses

 

$

(12,880

)

 

$

(21,153

)

 

$

(19,601

)

Prior service cost

 

 

260

 

 

 

96

 

 

 

28

 

Total Before Income Tax

 

 

(12,620

)

 

 

(21,057

)

 

 

(19,573

)

Income Tax Benefit

 

 

2,963

 

 

 

4,727

 

 

 

4,385

 

Total reclassifications after-tax

 

$

(9,657

)

 

$

(16,330

)

 

$

(15,188

)

 

 

9. Savings and Deferred Compensation Plans

Savings Plans

We sponsor various defined contribution savings plans which allow participants to make voluntary contributions by salary deduction. Such plans cover substantially all of our domestic, nonunion employees in the U.S. and are qualified under Section 401(k) of the U.S. Internal Revenue Code. Similar plans outside the U.S. cover various groups of employees of our international subsidiaries and affiliates. Several of these plans allow the Company to match, on a voluntary basis, a portion of the employee contributions. The following table presents the Company’s contributions to these savings plans during each of the last three fiscal years (in thousands):

 

2016

 

 

2015

 

 

2014

 

$

89,966

 

 

$

87,973

 

 

$

88,951

 

Deferred Compensation Plans

Our Executive Security Plan and Executive Deferral Plans are nonqualified deferred compensation programs that provide benefits payable to directors, officers, and certain key employees or their designated beneficiaries at specified future dates, upon retirement, or death. Benefit payments under both plans are funded by a combination of contributions from participants and the Company, and most of the participants are covered by life insurance policies with the Company designated as the beneficiary. The following table presents the amount charged to expense for the Company’s deferred compensation plans during each of the last three fiscal years (in thousands):

 

2016

 

 

2015

 

 

2014

 

$

5,792

 

 

$

5,536

 

 

$

5,321

 

 

 

F-31


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

10. Income Taxes

The following table presents the components of our consolidated income tax expense for each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Current income tax expense:

 

 

 

 

 

 

 

 

 

 

 

 

Federal

 

$

36,020

 

 

$

72,840

 

 

$

102,450

 

State

 

 

11,336

 

 

 

16,248

 

 

 

18,698

 

Foreign

 

 

52,259

 

 

 

43,344

 

 

 

38,107

 

Total current tax expense

 

 

99,615

 

 

 

132,432

 

 

 

159,255

 

Deferred income tax expense (benefit):

 

 

 

 

 

 

 

 

 

 

 

 

Federal

 

 

6,439

 

 

 

13,337

 

 

 

7,561

 

State

 

 

485

 

 

 

2,295

 

 

 

2,789

 

Foreign

 

 

(34,331

)

 

 

(46,809

)

 

 

20,449

 

Total deferred tax expense (benefit)

 

 

(27,407

)

 

 

(31,177

)

 

 

30,799

 

Consolidated income tax expense

 

$

72,208

 

 

$

101,255

 

 

$

190,054

 

 

Deferred taxes reflect the tax effects of temporary differences between the amounts recorded as assets and liabilities for financial reporting purposes and the comparable amounts recorded for income tax purposes.  Deferred tax assets and liabilities are measured using the enacted tax rates and laws that will be in effect when the differences are expected to reverse.  The following table presents the components of our net deferred tax assets at September 30, 2016 and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Deferred tax assets:

 

 

 

 

 

 

 

 

Obligations relating to:

 

 

 

 

 

 

 

 

Defined benefit pension plans

 

$

77,834

 

 

$

64,644

 

Other employee benefit plans

 

 

179,063

 

 

 

186,701

 

Net Operating Losses

 

 

139,125

 

 

 

134,467

 

Self-insurance programs

 

 

1,722

 

 

 

473

 

Contract revenues and costs

 

 

(8,177

)

 

 

25,579

 

Deferred Rent

 

 

7,955

 

 

 

9,428

 

Restructuring

 

 

47,792

 

 

 

6,722

 

Other

 

 

9,933

 

 

 

6,370

 

Valuation Allowance

 

 

(41,684

)

 

 

(60,320

)

Gross deferred tax assets

 

 

413,563

 

 

 

374,064

 

Deferred tax liabilities:

 

 

 

 

 

 

 

 

Depreciation and amortization

 

 

(154,939

)

 

 

(187,099

)

Other, net

 

 

(1,555

)

 

 

(3,994

)

Gross deferred tax liabilities

 

 

(156,494

)

 

 

(191,093

)

Net deferred tax assets

 

$

257,069

 

 

$

182,971

 

 

A valuation allowance is recorded to reduce deferred tax assets to the amount that is more likely than not to be realized based on an assessment of positive and negative evidence, including estimates of future taxable income necessary to realize future deductible amounts.  The valuation allowance at September 30, 2016 and October 2, 2015 was $41.7 million and $60.3 million, respectively.

Net operating loss carry forwards of foreign subsidiaries at September 30, 2016 and October 2, 2015 totaled $483.4 million and $455.1 million, respectively. If unused, foreign net operating losses of $26.1 million will expire between 2017 and 2036.  Net operating losses of $361.5 million can be carried forward indefinitely.

F-32


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

The following table presents the income tax benefits realized from the exercise of nonqualified stock options and disqualifying dispositions of stock sold under our employee stock purchase plans during each of the last three fiscal years (in millions):

 

2016

 

 

2015

 

 

2014

 

$

1.50

 

 

$

0.20

 

 

$

3.40

 

The following table reconciles total income tax expense using the statutory U.S. federal income tax rate to the consolidated income tax expense shown in the accompanying Consolidated Statements of Earnings for each of the last three fiscal years (dollars in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Statutory amount

 

$

98,935

 

 

$

141,479

 

 

$

189,758

 

State taxes, net of the federal benefit

 

 

7,853

 

 

 

12,857

 

 

 

12,750

 

Tax differential on foreign earnings

 

 

11,337

 

 

 

(38,838

)

 

 

11,991

 

Foreign Tax Credits

 

 

(44,018

)

 

 

(21,313

)

 

 

(20,802

)

Uncertain Tax Positions

 

 

1,449

 

 

 

2,281

 

 

 

(9,847

)

Other, net

 

 

(3,348

)

 

 

4,789

 

 

 

6,204

 

Consolidated income tax expense

 

$

72,208

 

 

$

101,255

 

 

$

190,054

 

Rates used to compute statutory amount

 

 

35.0

%

 

 

35.0

%

 

 

35.0

%

Consolidated effective income tax rate

 

 

25.2

%

 

 

23.5

%

 

 

35.1

%

 

The Company’s consolidated effective income tax rate was 25.2% for fiscal 2016, compared to 23.5% in fiscal 2015. Contributing to the increase in the effective tax rate when compared to the prior year is the absence of a $23.1 million nonrecurring benefit related to foreign currency loss in 2015.  The fiscal 2016 effective tax rate is lower than the statutory rate due to an $11.2 million benefit related to a valuation allowance release, a $6.9 million benefit from a prior period adjustment to income taxes payable, and an $8.7 million benefit recorded upon the filing of a US amended tax return to claim additional foreign tax credits and an U.S. Internal Revenue Code Section 179D benefit for the design of energy efficient buildings.  Offsetting the current year benefits was an $8.9 million expense charge related to the revaluation of deferred tax assets due to a statutory tax rate change in the United Kingdom.

The following table presents income tax payments made during each of the last three fiscal years (in millions):

 

2016

 

 

2015

 

 

2014

 

$

116.30

 

 

$

156.50

 

 

$

173.60

 

The following table presents the components of our consolidated earnings before taxes for each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

United States earnings

 

$

206,159

 

 

$

283,504

 

 

$

288,800

 

Foreign earnings

 

 

80,564

 

 

 

146,633

 

 

 

253,366

 

 

 

$

286,723

 

 

$

430,137

 

 

$

542,166

 

 

United States income taxes, net of applicable credits, have been provided on the undistributed earnings of the Company’s foreign subsidiaries, except in those instances where the earnings have been permanently reinvested. At September 30, 2016, approximately $26.1 million of such undistributed earnings of certain foreign subsidiaries have been permanently reinvested. Should these earnings be repatriated, approximately $5.4 million of income taxes would be payable.

The Company accounts for unrecognized tax benefits in accordance with ASC Topic 740, Income Taxes. It accounts for interest and penalties on unrecognized tax benefits as interest and penalties (i.e., not as part of income tax expense). The Company’s liability for gross unrecognized tax benefits was $44.2 million and $42.7 million at September 30, 2016 and October 2, 2015, respectively, all of which, if recognized, would affect the Company’s consolidated effective income tax rate. The Company had $36.4 million and $42.1 million in accrued interest and penalties at September 30, 2016 and October 2,

F-33


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

2015, respectively. The Company estimates that, within 12 months, $4.3 million of gross, primarily non-U.S. unrecognized tax benefits will reverse due to the anticipated expiration of time to assess tax. As of September 30, 2016, the Company’s U.S. federal income tax returns for tax years 2013 through 2016 remain subject to examination.

The following table presents the reconciliation of the beginning and ending amount of unrecognized tax benefits for the years presented (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Balance, beginning of year

 

 

42,666

 

 

 

41,923

 

 

 

51,770

 

Additions based on tax positions related to the current

   year

 

 

5,670

 

 

 

6,440

 

 

 

6,528

 

Additions for tax positions of prior years

 

 

367

 

 

 

 

 

 

 

Reductions for tax positions of prior years

 

 

(2,451

)

 

 

(5,697

)

 

 

(16,375

)

Settlement

 

 

(2,085

)

 

 

 

 

 

 

Balance, end of year

 

 

44,167

 

 

 

42,666

 

 

 

41,923

 

 

 

11. Commitments and Contingencies, and Derivative Financial Instruments

Commitments Under Operating Leases

We lease certain of our facilities and equipment under operating leases with net aggregate future lease payments of approximately $794,068 million at September 30, 2016, payable as follows (in thousands):

 

In fiscal years,

 

 

 

 

2017

 

$

144,326

 

2018

 

 

129,837

 

2019

 

 

111,306

 

2020

 

 

91,827

 

2021

 

 

77,788

 

Thereafter

 

 

277,385

 

 

 

 

832,469

 

Amounts representing sublease income

 

 

(38,401

)

 

 

$

794,068

 

 

We recognize rent expense, inclusive of landlord concessions and tenant allowances, over the lease term on a straight-line basis. We also recognize rent expense on a straight-line basis for leases containing fixed escalation clauses and rent holidays. Contingent rentals are included in rent expense as accruable. Operating leases relating to many of our major offices generally contain renewal options, and provide for additional rental based on escalation in operating expenses and real estate taxes.

The following table presents rent expense and sublease income offsetting the Company’s rent expense during each of the last three fiscal years (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Rent expense

 

$

151,539

 

 

$

175,067

 

 

$

194,796

 

Sublease income

 

 

(7,212

)

 

 

(5,275

)

 

 

(6,102

)

Net rent

 

$

144,327

 

 

$

169,792

 

 

$

188,694

 

 

F-34


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Guarantee

We are party to a synthetic lease agreement involving certain real and personal property located in Houston, Texas that we use in our operations. A synthetic lease is a type of off-balance sheet transaction which provides us with certain tax and other financial benefits. Significant terms of the lease are as follows:

 

End of lease term

 

 

2025

 

End of term purchase option (in thousands)

 

$

76,950

 

Residual value guaranty (in thousands)

 

$

62,412

 

 

The Company refinanced the synthetic lease agreement effective July 28, 2015 with a ten-year term. The new lease agreement continues to gives us the right to request an extension of the lease term. We may also assist the owner in selling the property at the end of the lease term, the proceeds from which would be used to reduce our residual value guarantee. The minimum lease payments required by the lease agreement is included in the above lease pay-out schedule. We have determined that the estimated Fair Value of the aforementioned financial guarantee was not significant at September 30, 2016.

Derivative Financial Instruments

In situations where our operations incur contract costs in currencies other than their functional currency, we attempt to have a portion of the related contract revenues denominated in the same currencies as the costs. In those situations where revenues and costs are transacted in different currencies, we sometimes enter into foreign exchange contracts in order to limit our exposure to fluctuating foreign currencies. The Company does not currently have exchange rate sensitive instruments that would have a material effect on our consolidated financial statements or results of operations.

Letters of Credit

Letters of credit outstanding at September 30, 2016 totaled $256.0 million. Of this amount, $2.5 million has been issued under the 2014 Facility and $253.5 million are issued under separate, committed and uncommitted letter-of-credit facilities.

 

 

12. Contractual Guarantees, Litigation, Investigations, and Insurance

In the normal course of business, we are subject to certain contractual guarantees and litigation. The guarantees to which we are a party generally relate to project schedules and plant performance. Most of the litigation in which we are involved has us as a defendant in workers’ compensation, personal injury, environmental, employment/labor, professional liability, and other similar lawsuits.

We maintain insurance coverage for various aspects of our business and operations. Our insurance programs have varying coverage limits and maximums, and insurance companies may seek to not pay any claims we might make. We have also elected to retain a portion of losses that occur through the use of various deductibles, limits, and retentions under our insurance programs. As a result, we may be subject to future liability for which we are only partially insured or completely uninsured. We intend to mitigate any such future liability by continuing to exercise prudent business judgment in negotiating the terms and conditions of our contracts. Our insurers are also subject to business risk and, as a result, one or more of them may be unable to fulfill their insurance obligations due to insolvency or otherwise.

Additionally, as a contractor providing services to the U.S. federal government and several of its agencies, we are subject to many levels of audits, investigations, and claims by, or on behalf of, the U.S. federal government with respect to our contract performance, pricing, costs, cost allocations, and procurement practices. Furthermore, our income, franchise, and similar tax returns and filings are also subject to audit and investigation by the Internal Revenue Service, most states within the U.S., as well as by various government agencies representing jurisdictions outside the U.S.

We record in our Consolidated Balance Sheets amounts representing our estimated liability relating to such claims, guarantees, litigation, and audits and investigations. We perform an analysis to determine the level of reserves to establish for

F-35


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

insurance-related claims that are known and have been asserted against us, and for insurance-related claims that are believed to have been incurred based on actuarial analysis, but have not yet been reported to our claims administrators as of the respective balance sheet dates. We include any adjustments to such insurance reserves in our consolidated results of operations.

The Company believes, after consultation with counsel, that such guarantees, litigation, U.S. government contract-related audits, investigations and claims, and income tax audits and investigations should not have any material adverse effect on our consolidated financial statements.

On August 9, 2014, the Company received a Notice of Arbitration from Motiva Enterprises LLC (“Motiva”) alleging fraud and breach of fiduciary duty with respect to an expansion project at the Motiva, Port Arthur, Texas refinery. The arbitration relates to the professional services provided by Bechtel-Jacobs CEP Port Arthur Joint Venture (“BJJV”), a joint venture between Bechtel Corporation and Jacobs, in connection with that project. On March 1, 2016, Motiva submitted an amended Notice of Arbitration, asserting the same causes of actions in its original notice (fraud and breach of fiduciary duty) and alleged entitlement to monetary relief in excess of $8 billion of alleged actual damages,  punitive damages, attorneys' fees and interest. The non-appealable arbitration is pending in Houston, Texas before a panel utilizing the rules of the International Institute for Conflict Prevention and Resolution and an evidentiary hearing was conducted, which concluded on October 21, 2016.  Post-hearing briefing was requested by the arbitration panel and is expected to be submitted by late November 2016.  A decision is expected thereafter.   If BJJV is found liable, this matter could have a material adverse effect on the Company’s business, financial condition, results of operations and/or cash flows, particularly in the short term. However, BJJV has denied liability and is vigorously defending these claims, and based on the information currently available, the Company does not expect the resolution of this matter to have a material adverse effect on the Company’s business, financial condition, results of operations and/or cash flows.

On September 30, 2015, Nui Phao Mining Company Limited (“NPMC”) commenced arbitration proceedings against Jacobs E&C Australia Pty Limited (“Jacobs E&C”). The arbitration is pending in Singapore before the Singapore International Arbitration Centre. In March 2011, Jacobs E&C was engaged by NPMC for the provision of management, design, engineering, and procurement services for the Nui Phao mine/mineral processing project in Vietnam. In the Notice of Arbitration and in a subsequently filed Statement of Claim and Supplementary Statement of Claim dated February 1, 2016 and February 26, 2016, respectively, NPMC asserts various causes of action and alleges that the quantum of its claim exceeds $167 million. Jacobs has denied liability and is vigorously defending this claim. A hearing on the merits has been set for November 2017. The Company does not expect the resolution of this matter to have a material adverse effect on its financial condition, results of operations and/or cash flows.

 

On December 7, 2009, the Judicial Council of California, Administrative Office of the Courts (“AOC”) initiated an action in the San Francisco County Superior Court against Jacobs Facilities Inc. (“JFI”) and Jacobs Project Management (“JPM”).  On May 12, 2011, AOC filed an operative Second Amended Complaint, which added Jacobs as a defendant.  The action arises out of a contract between AOC and JFI pursuant to which JFI provided regular maintenance and repairs at certain AOC court facilities.

 

AOC alleged three causes of action: (i) breach of contract based on the expiration of JFI’s contractor’s license before JFI executed an assignment and assumption agreement to formally transfer the contract to JPM, a licensed entity; (ii) disgorgement of all fees AOC paid before the assignment and assumption agreement pursuant to California’s Contractors’ State License Law (“CSLL”); and (iii) breach of Jacobs’ parent guarantee agreement. JPM cross-claimed for unpaid sums for contract services that the licensed JPM had performed between August 2009 and November 2009.  A jury trial was held on the parties’ CSLL claims in April 2012 and, on May 2, 2012, the jury returned a special verdict in favor of the Jacobs entities finding, among other things, that JPM was owed approximately $4.7 million in unpaid fees and that JFI was not required to disgorge the approximate $18.3 million that AOC had paid for its work under the contract.

 

AOC subsequently dismissed its cause of action for breach of contract, and JPM dismissed its cross-claims other than those for its unpaid invoices.  AOC’s third cause of action for breach of the parent guaranty was resolved by a stipulation, which provided that if AOC obtains a judgment against JFI, the judgment will also be against its parent, Jacobs.  The trial court entered judgment in the Jacobs entities’ favor.

 

F-36


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

On August 20, 2015, the California Court of Appeal reversed the jury’s verdict, holding that JFI had violated the CSLL.  The Court of Appeal remanded to the San Francisco County Superior Court for an evidentiary hearing to determine whether the Jacobs’ entities had “substantially complied” with the CSLL under California Business and Professions Code Section 7031(e).  Establishing “substantial compliance” would prevent $18.3 million in disgorgement against Jacobs and permit Jacobs to recover $4.7 million in unpaid contract amounts. The evidentiary hearing on substantial compliance was conducted between July 18 and August 5, 2016.  On August 30, 2016, the California State Legislature amended the applicable substantial compliance provision of the CSLL.  On September 9, 2016, Jacobs filed a motion to apply the newly amended substantial compliance provision to the AOC contract.  AOC filed a response and agreed that the new statute “will apply” to the case “as of January 1, 2017,” the new law’s effective date.  The Court ordered the parties to submit proposed tentative statements of decision applying the newly amended and prior versions of substantial compliance in the alternative.  The parties submitted proposed tentative statements of decision on October 21, 2016.  A hearing regarding the parties’ proposed tentative statements of decision is scheduled for mid-December 2016.  In advance of that hearing, the Court issued a tentative ruling in favor of the Company but there is no assurance that the tentative decision will be the final ruling of the Court after it hears argument by the parties.

 

The Jacobs entities have contested, and will continue to vigorously contest, the AOC’s claims and will vigorously litigate JPM’s claim for unpaid sums.  The Company does not expect the resolution of this matter to have a material adverse effect on its financial condition, results of operations and/or cash flows.

 

 

13. Common and Preferred Stock

Jacobs is authorized to issue two classes of capital stock designated “common stock” and “preferred stock” (each has a par value of $1.00 per share). The preferred stock may be issued in one or more series. The number of shares to be included in a series as well as each series’ designation, relative powers, dividend and other preferences, rights and qualifications, redemption provisions, and restrictions are to be fixed by the Board of Directors at the time each series is issued. Except as may be provided by the Board of Directors in a preferred stock designation, or otherwise provided for by statute, the holders of shares of common stock have the exclusive right to vote for the election of directors and on all other matters requiring stockholder action. The holders of shares of common stock are entitled to dividends if and when declared by the Board of Directors from whatever assets are legally available for that purpose.

 

 

14. Other Financial Information

Receivables

The following table presents the components of “Receivables” as shown in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 as well as certain other related information (in thousands):

 

 

 

2016

 

 

2015

 

Amounts billed, net

 

$

1,110,042

 

 

$

1,213,892

 

Unbilled receivables and other

 

 

937,552

 

 

 

1,252,509

 

Retentions receivable

 

 

68,069

 

 

 

82,342

 

Total receivables, net

 

$

2,115,663

 

 

$

2,548,743

 

Other information about receivables:

 

 

 

 

 

 

 

 

Amounts due from the United States federal

   government included above, net of advanced

   billings

 

$

235,203

 

 

$

327,157

 

Claims receivable

 

$

26,061

 

 

$

32,511

 

 

Billed receivables, net consist of amounts invoiced to clients in accordance with the terms of the client contracts and are shown net of an allowance for doubtful accounts. We anticipate that substantially all of such billed amounts will be collected over the next twelve months.

Unbilled receivables and retentions receivable represent reimbursable costs and amounts earned and reimbursable under contracts in progress as of the respective balance sheet dates. Such amounts become billable according to the contract

F-37


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

terms, which usually consider the passage of time, achievement of certain milestones or completion of the project. We anticipate that substantially all of such unbilled amounts will be billed and collected over the next twelve months.

Claims receivable are included in “Receivables” in the accompanying Consolidated Balance Sheets and represent certain costs incurred on contracts to the extent it is probable that such claims will result in additional contract revenue and the amount of such additional revenue can be reliably estimated.

Property, Equipment, and Improvements, Net

The following table presents the components of our property, equipment, and improvements, net at September 30, 2016 and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Land

 

$

16,680

 

 

$

23,757

 

Buildings

 

 

91,194

 

 

 

97,597

 

Equipment

 

 

531,539

 

 

 

592,491

 

Leasehold improvements

 

 

221,437

 

 

 

259,544

 

Construction in progress

 

 

36,764

 

 

 

17,229

 

 

 

 

897,614

 

 

 

990,618

 

Accumulated depreciation and amortization

 

 

(577,941

)

 

 

(609,380

)

 

 

$

319,673

 

 

$

381,238

 

 

Miscellaneous Noncurrent Assets

The following table presents the components of “Miscellaneous noncurrent assets” shown in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Deferred income taxes

 

$

413,563

 

 

$

374,064

 

Cash surrender value of life insurance policies

 

 

122,364

 

 

 

115,440

 

Investments

 

 

178,256

 

 

 

222,941

 

Notes receivable

 

 

18,303

 

 

 

13,197

 

Reimbursable pension costs (a)

 

 

-

 

 

 

119,548

 

Other

 

 

26,843

 

 

 

34,623

 

Total

 

$

759,329

 

 

$

879,813

 

 

 

(a)

Consists primarily of costs incurred relating to a defined benefit pension plan covering employees providing services on a contract with, and for the benefit of, the U.S. federal government pursuant to which such costs are fully reimbursable. As of June 30, 2016, we ceased performing on this operating contract, and, as such, we are no longer responsible for administering this pension plan.  

F-38


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Accrued Liabilities

The following table presents the components of “Accrued liabilities” shown in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Accrued payroll and related liabilities

 

$

561,652

 

 

$

623,297

 

Project-related accruals

 

 

102,400

 

 

 

130,401

 

Non project-related accruals

 

 

87,813

 

 

 

102,324

 

Insurance liabilities

 

 

54,984

 

 

 

59,081

 

Sales and other similar taxes

 

 

37,029

 

 

 

53,476

 

Deferred rent

 

 

69,059

 

 

 

93,040

 

Other

 

 

25,441

 

 

 

29,366

 

Total

 

$

938,378

 

 

$

1,090,985

 

 

Other Deferred Liabilities

The following table presents the components of “Other deferred liabilities” shown in the accompanying Consolidated Balance Sheets at September 30, 2016 and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Liabilities relating to defined benefit pension and early

   retirement plans

 

$

402,955

 

 

$

416,725

 

Liabilities relating to nonqualified deferred compensation

   arrangements

 

 

123,926

 

 

 

129,982

 

Deferred income taxes

 

 

156,494

 

 

 

191,093

 

Miscellaneous

 

 

178,449

 

 

 

126,068

 

Total

 

$

861,824

 

 

$

863,868

 

 

Total Accumulated Other Comprehensive Loss

The following table presents the components of “Accumulated other comprehensive loss” shown in the accompanying Consolidated Balance Sheets at September 30, 2016, and October 2, 2015 (in thousands):

 

 

 

2016

 

 

2015

 

Foreign currency translation adjustments

 

$

(245,603

)

 

$

(199,087

)

Adjustments relating to defined benefit pension plans

 

 

(364,625

)

 

 

(266,440

)

Other

 

 

(366

)

 

 

763

 

Total

 

$

(610,594

)

 

$

(464,764

)

 

Supplemental Cash Flow Information

During fiscal 2016 and fiscal 2015, the Company acquired businesses for cash and stock of $49.9 million and $8.1 million, respectively. The following table presents the non-cash adjustments relating to these acquisitions made in preparing the accompanying Consolidated Statements of Cash Flows (in thousands):

 

 

 

2016

 

 

2015

 

Working capital

 

$

10,023

 

 

$

(8,749

)

Property and equipment

 

 

879

 

 

 

71

 

Noncurrent assets

 

 

8,192

 

 

 

(4,334

)

Deferred liabilities

 

 

 

 

 

(1,316

)

Goodwill

 

 

30,849

 

 

 

22,429

 

 

F-39


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

 

15. Segment Information

 

During the second quarter of fiscal 2016, we reorganized our operating and reporting structure around four lines of business (“LOB”).  This reorganization is intended to better serve our global clients, leverage our workforce, help streamline operations, and provide enhanced growth opportunities.  The four global LOBs are: Aerospace & Technology, Buildings & Infrastructure, Industrial, and Petroleum & Chemicals. Previously, the Company operated its business as a single segment.

Under the new organization, each LOB has a president that reports directly to the Company's Chairman and CEO (who is also the Company’s Chief Operating Decision Maker, or “CODM”).  As part of the reorganization, the sales function, which had been managed centrally for many years, is now managed on a LOB basis, and accordingly, the associated cost is now embedded in the new segments and report to the respective LOB presidents.  In addition, a portion of the costs of other support functions (e.g., finance, legal, human resources, and information technology) are allocated to each LOB using methodologies which, we believe, effectively attribute the cost of these support functions to the revenue-generating activities of the Company on a rational basis.  In addition, the cost of the Company’s cash incentive plan, the Jacobs Engineering Group Inc. Management Incentive Plan (“MIP”) and the expense associated with the Jacobs Engineering Group Inc. Stock Incentive Plan (“1999 SIP”) have likewise been charged to the LOBs except for those amounts determined to relate to the business as a whole (which amounts remain in corporate’s results of operations).

Financial information for each LOB is reviewed by the CODM to assess performance and make decisions regarding the allocation of resources.  The Company does not track assets by LOB, nor does it provide such information to the CODM.

The CODM evaluates the operating performance of our LOBs using operating profit, which is defined as margin less “corporate charges” (e.g., the allocated amounts described above).  The Company incurs certain selling, general and administrative (“SG&A”) costs which relate to its business as a whole which are not allocated to the LOBs.

The following tables present total revenues and operating profit for each reportable segment. Prior period information has been restated to reflect the current period presentation (in thousands).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Revenues from External Customers:

 

 

 

 

 

 

 

 

 

 

 

     Aerospace & Technology

$

2,657,433

 

 

$

2,924,753

 

 

$

2,306,453

 

Buildings & Infrastructure

 

2,253,512

 

 

 

2,458,379

 

 

 

2,705,197

 

Industrial

 

2,793,713

 

 

 

2,517,571

 

 

 

2,956,391

 

Petroleum & Chemicals

 

3,259,499

 

 

 

4,214,129

 

 

 

4,727,116

 

Total

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

 

 

 

 

 

2016

 

 

2015

 

 

2014

 

Operating Profit:

 

 

 

 

 

 

 

 

 

 

 

Aerospace & Technology

$

203,808

 

 

$

205,368

 

 

$

139,684

 

Buildings & Infrastructure

 

174,648

 

 

 

145,299

 

 

 

164,439

 

Industrial

 

81,268

 

 

 

126,531

 

 

 

134,230

 

Petroleum & Chemicals

 

126,604

 

 

 

138,351

 

 

 

162,462

 

Total Segment Operating Profit

 

586,328

 

 

 

615,549

 

 

 

600,815

 

Other Corporate Items

 

(60,100

)

 

 

(15,739

)

 

 

20,583

 

Restructuring Charges

 

(187,630

)

 

 

(154,283

)

 

 

(93,330

)

(Loss) Gain on disposal of business and investments

 

(41,410

)

 

 

(2,909

)

 

 

12,147

 

Total Other Expense

 

(10,465

)

 

 

(12,481

)

 

 

1,951

 

Earnings Before Taxes

$

286,723

 

 

$

430,137

 

 

$

542,166

 

 

F-40


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

Included in “other corporate items” in the above table are costs and expenses which relate to general corporate activities as well as corporate-managed benefit and insurance programs.  Such costs and expenses include: (i) those elements of SG&A expenses relating to the business as a whole; (ii) those elements of the MIP and the 1999 SIP relating to corporate personnel whose other compensation costs are not allocated to the LOBs; (iii) the amortization of intangible assets acquired as part of purchased business combinations; (iv) the quarterly variances between the Company’s actual costs of certain of its self-insured integrated risk and employee benefit programs and amounts charged to the LOBs; and (v) certain adjustments relating to costs associated with the Company’s international defined benefit pension plans.  In addition, “other corporate items” includes adjustments to contract margins (both positive and negative) associated with projects where it has been determined, in the opinion of management, that such adjustments are not indicative of the performance of the related LOB and therefore should not be attributed to the LOB.

Included in (Loss) Gain on disposal of business and investments was the losses associated with the sale of the Company’s French subsidiary and a non-cash write-off on an equity investment.

 

We provide a broad range of technical, professional, and construction services including engineering, design, and architectural services; construction and construction management services; operations and maintenance services; and process, scientific, and systems consulting services. We provide our services through offices and subsidiaries located primarily in North America, South America, Europe, the Middle East, India, Australia, Africa, and Asia. We provide our services under cost-reimbursable and fixed-price contracts.

The following table presents certain financial information by geographic area for fiscal 2016, 2015, and 2014 (in thousands):

 

 

 

2016

 

 

2015

 

 

2014

 

Revenues:

 

 

 

 

 

 

 

 

 

 

 

 

United States

 

$

6,247,448

 

 

$

7,154,433

 

 

$

7,078,366

 

Europe

 

 

2,346,224

 

 

 

2,074,837

 

 

 

2,402,399

 

Canada

 

 

927,942

 

 

 

1,065,651

 

 

 

1,344,632

 

Asia

 

 

299,952

 

 

 

304,393

 

 

 

299,086

 

India

 

 

187,929

 

 

 

163,871

 

 

 

148,453

 

Australia and New Zealand

 

 

436,670

 

 

 

611,271

 

 

 

709,379

 

South America and Mexico

 

 

125,610

 

 

 

143,014

 

 

 

271,213

 

Middle East and Africa

 

 

392,382

 

 

 

597,362

 

 

 

441,629

 

Total

 

$

10,964,157

 

 

$

12,114,832

 

 

$

12,695,157

 

Long-Lived Assets:

 

 

 

 

 

 

 

 

 

 

 

 

United States

 

$

195,392

 

 

$

208,155

 

 

$

240,501

 

Europe

 

 

37,163

 

 

 

55,713

 

 

 

58,562

 

Canada

 

 

21,464

 

 

 

36,647

 

 

 

51,622

 

Asia

 

 

3,069

 

 

 

3,859

 

 

 

4,063

 

India

 

 

13,350

 

 

 

16,264

 

 

 

17,960

 

Australia and New Zealand

 

 

18,888

 

 

 

24,460

 

 

 

49,436

 

South America and Mexico

 

 

5,621

 

 

 

9,127

 

 

 

11,084

 

Middle East and Africa

 

 

24,726

 

 

 

27,013

 

 

 

23,569

 

Total

 

$

319,673

 

 

$

381,238

 

 

$

456,797

 

 

Revenues were earned from unaffiliated clients located primarily within the various and respective geographic areas shown. Long-lived assets consist of property and equipment, net of accumulated depreciation and amortization.

The following table presents the revenues earned directly or indirectly from the U.S. federal government and its agencies, expressed as a percentage of total revenues, for fiscal 2016, 2015 and 2014:

 

2016

 

 

2015

 

 

2014

 

 

21.4%

 

 

 

21.7%

 

 

 

17.8%

 

F-41


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

 

 

16. Selected Quarterly Information — Unaudited

The following table presents selected quarterly financial information for each of the last three fiscal years. (in thousands, except for per share amounts):

 

 

 

First

Quarter

 

 

Second

Quarter

 

 

Third

Quarter

 

 

Fourth

Quarter

 

 

Fiscal

Year

 

2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenues

 

$

2,847,934

 

 

$

2,781,763

 

 

$

2,693,873

 

 

$

2,640,587

 

 

$

10,964,157

 

Operating profit (a)

 

 

59,450

 

 

 

86,781

 

 

 

109,556

 

 

 

82,811

 

 

 

338,598

 

Earnings before taxes

 

 

57,787

 

 

 

90,456

 

 

 

102,807

 

 

 

35,673

 

 

 

286,723

 

Net earnings of the Group

 

 

50,306

 

 

 

63,389

 

 

 

70,937

 

 

 

29,883

 

 

 

214,515

 

Net earnings attributable to Jacobs

 

 

46,514

 

(b)

 

65,250

 

(b)

 

69,055

 

(b)

 

29,644

 

(b)

 

210,463

 

Earnings per share:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

 

0.38

 

(b)

 

0.54

 

(b)

 

0.58

 

(b)

 

0.25

 

(b)

 

1.75

 

Diluted

 

 

0.38

 

(b)

 

0.54

 

(b)

 

0.57

 

(b)

 

0.24

 

(b)

 

1.73

 

2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenues

 

$

3,187,005

 

 

$

2,903,332

 

 

$

2,907,541

 

 

$

3,116,954

 

 

$

12,114,832

 

Operating profit (a)

 

 

158,223

 

 

 

133,045

 

 

 

100,434

 

 

 

53,825

 

 

 

445,527

 

Earnings before taxes

 

 

154,695

 

 

 

128,962

 

 

 

97,188

 

 

 

49,292

 

 

 

430,137

 

Net earnings of the Group

 

 

106,195

 

 

 

88,110

 

 

 

97,308

 

 

 

37,269

 

 

 

328,882

 

Net earnings attributable to Jacobs

 

 

100,079

 

 

 

81,967

 

(c)

 

91,062

 

(c)

 

29,863

 

(c)

 

302,971

 

Earnings per share:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

 

0.78

 

 

 

0.65

 

(c)

 

0.74

 

(c)

 

0.00

 

(c)

 

2.42

 

Diluted

 

 

0.77

 

 

 

0.64

 

(c)

 

0.73

 

(c)

 

0.24

 

(c)

 

2.40

 

2014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenues

 

$

3,068,891

 

 

$

3,176,033

 

 

$

3,231,791

 

 

$

3,218,442

 

 

$

12,695,157

 

Operating profit (a)

 

 

145,047

 

 

 

122,434

 

 

 

123,937

 

 

 

136,650

 

 

 

528,068

 

Earnings before taxes

 

 

146,921

 

 

 

132,394

 

 

 

118,046

 

 

 

144,805

 

 

 

542,166

 

Net earnings of the Group

 

 

98,949

 

 

 

90,800

 

 

 

71,309

 

(d)

 

91,054

 

(d)

 

352,112

 

Net earnings attributable to Jacobs

 

 

93,732

 

 

 

83,460

 

(e)

 

64,842

 

 

 

86,074

 

 

 

328,108

 

Earnings per share:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

 

0.72

 

 

 

0.64

 

(e)

 

0.50

 

(d)

 

0.66

 

(d)

 

2.51

 

Diluted

 

 

0.71

 

 

 

0.63

 

(e)

 

0.49

 

(d)

 

0.65

 

(d)

 

2.48

 

 

(a)

Operating profit represents revenues less (i) direct costs of contracts, and (ii) selling, general and administrative expenses.

(b)

Includes costs of $48.1 million, or $0.39 per diluted share, in the first quarter of fiscal 2016, $25.7 million or $0.21 per diluted share in the second quarter of fiscal 2016, $25.8 million, or $0.21 per diluted share, in the third quarter, and $36.0 million or $0.3 per diluted share in the fourth quarter of fiscal 2016, in each case, related to the 2015 Restructuring.  Also included in the fourth quarter of fiscal 2016 were $17.1 million, or $0.14 per diluted share related to the loss on sale of our French subsidiary; and $10.4 million, or $0.09 per diluted share related to the non-cash write-off on an equity investment.

(c)

Includes costs of $9.6 million, or $0.08 per diluted share, in the second quarter of fiscal 2015, $30.1 million or $0.24 per diluted share in the third quarter of fiscal 2015, and $68.2 million, or $0.56 per diluted share, in the fourth quarter of fiscal 2015, in each case, related to the 2015 Restructuring.

(d)

Includes costs of $47.0 million, or $0.35 per diluted share, in the third quarter of fiscal 2014, and $30.4 million, or $0.23 per diluted share, in the fourth quarter of fiscal 2014, in each case, related to the 2014 Restructuring.

(e)

Includes $6.4 million, or $0.05 per diluted share, increase to net earnings related to a gain on the sale of certain intellectual property in the second quarter of fiscal 2014.

 

 

F-42


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

17. Definitions

The following terms used in the accompanying Consolidated Financial Statements and these Notes to Consolidated Financial Statements have the meanings set forth below:

“1989 ESPP” means the Jacobs Engineering Group Inc. 1989 Employee Stock Purchase Plan, as amended. The 1989 ESPP is a shareholder-approved, broad-based, employee stock purchase plan qualified under Section 423 of the U.S. Internal Revenue Code.

“1999 ODSP" means the Jacobs Engineering Group Inc. 1999 Outside Director Stock Plan, as amended. The 1999 ODSP is a shareholder-approved, equity-based compensation plan covering Jacobs' non-management directors.

“1999 SIP” means the Jacobs Engineering Group Inc. Stock Incentive Plan, as amended. The 1999 SIP is a shareholder-approved, equity-based compensation plan covering the Company's officers and key employees.

The "2015 Restructuring" refers to a series of initiatives intended to improve operational efficiency, reduce costs, and better position the Company to drive growth of the business in the future. Actions included involuntary terminations, the abandonment of certain leased offices, and the co-location of employees. Included in the Company's consolidated results of operations for fiscal 2016 and fiscal 2015 are pre-tax costs of $187.9 million and $157.2 million, respectively, relating to the 2015 Restructuring. These costs are primarily included in selling, general, and administrative expense in the accompanying Consolidated Statements of Earnings.

The "2014 Restructuring" refers to a series of initiatives intended to improve operational efficiency, reduce costs, accelerate the integration of SKM, and better position the Company to drive growth of the business in the future. Actions included involuntary terminations, the abandonment of certain leased offices, and the co-location of employees. Included in the Company's consolidated results of operations for fiscal 2014 are pre-tax costs of $93.3 million relating to the 2014 Restructuring. These costs are included in selling, general, and administrative expense in the accompanying Consolidated Statements of Earnings.

“ASC” refers to the Accounting Standards Codification as maintained by the FASB. The ASC is the primary source of U.S. GAAP to be applied by the Company and all other nongovernmental entities. The ASC organizes and presents hundreds of previously separate pieces of authoritative accounting guidance into a single on-line research database. The accounting principles promulgated by the ASC are organized therein by broad topics, and is updated by the FASB through the issuances of ASUs.

“ASU” means Accounting Standards Updates, the primary means by which the ASC is updated by the FASB.

“Company” (including “we”, “us” or “our”) means Jacobs Engineering Group Inc. and its consolidated subsidiaries and affiliates.

“Consolidated EBITDA" generally means consolidated net earnings attributable to Jacobs, plus consolidated (i) interest expense, (ii) tax expense, and (iii) depreciation and amortization expense (including amortization expense relating to intangible assets).

"Consolidated Funded Indebtedness" generally means the sum of (i) the balances outstanding under all loan, credit, and similar agreements for borrowed money (including purchase money indebtedness), (ii) all amounts representing direct obligations arising under letters of credit, (iii) indebtedness in respect of capital leases and similar financing arrangements, and (iv) the value of all guarantees issued with respect to the types of indebtedness described in (i) through (iii).

"Consolidated Leverage Ratio" means, as of any date of determination, the ratio of (i) the Company's Consolidated Funded Indebtedness as of such date to (ii) the Company's Consolidated EBITDA for the immediately preceding four consecutive fiscal quarters.

“EPS” means earnings-per-share. “Basic EPS” is computed by dividing the consolidated net earnings attributable to Jacobs by the weighted average number of shares of common stock outstanding during the period. “Diluted EPS” is

F-43


JACOBS ENGINEERING GROUP INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

computed in a manner similar to the computation of Basic EPS, but gives effect to all dilutive securities that were outstanding during the period. Our dilutive securities consist of nonqualified stock options and restricted stock (including restricted stock units)

“Fair Value” means the price that would be received from selling an asset, or paid to transfer a liability, in an orderly transaction between market participants as of the date fair value is determined (i.e., the “measurement date”). When determining fair value, U.S. GAAP requires that we consider the principal or most advantageous market in which we would transact any sale or purchase. U.S. GAAP also requires that the inputs (factors) we use (consider) to determine fair value be considered in the following order of priority:

 

Level 1 inputs are quoted prices in active markets for identical assets or liabilities;

 

Level 2 inputs are observable inputs (other than quoted prices in active markets included in Level 1) such as (i) quoted prices for similar assets or liabilities, (ii) quoted prices in markets that have insufficient volume or infrequent transactions (i.e., less active markets), and (iii) model-driven valuations in which all significant inputs are observable or can be derived principally from, or corroborated with, observable market data for substantially the full term of the asset or liability; and

 

Level 3 inputs are unobservable inputs to the valuation methodology that are significant to the fair value measurement.

“FASB” means the Financial Accounting Standards Board. The FASB is the designated organization within the U.S. for establishing standards of financial accounting that govern the preparation of financial reports by nongovernmental entities.

“GESPP” means the Jacobs Engineering Group Inc. Global Employee Stock Purchase Plan, as amended. The GESPP is a shareholder-approved, broad-based, employee stock purchase plan covering employees of certain of Jacobs' non-U.S. subsidiaries.

“Group” refers to the combined economic interests and activities of Jacobs and the persons and entities holding noncontrolling interests in the subsidiaries and affiliates that are consolidated into the accompanying Consolidated Financial Statements.

“Jacobs” means Jacobs Engineering Group Inc.

“U.S. GAAP” means those accounting principles and practices generally accepted in the United States.

“U.S. IRC” means the U.S. Internal Revenue Code of 1986, as amended.

“VIE” means a “Variable Interest Entity” as defined in U.S. GAAP. A VIE is a legal entity in which equity investors do not have sufficient equity at risk for the entity to finance its activities without additional subordinated financial support or, as a group, the holders of the equity investment at risk lack any one of the following three characteristics: (i) the power, through voting rights or similar rights, to direct the activities of a legal entity that most significantly impact the entity's economic performance; (ii) the obligation to absorb the expected losses of the legal entity; or (iii) the right to receive the expected residual returns of the legal entity. Accordingly, entities issuing consolidated financial statements (i.e., a “reporting entity”) shall consolidate a VIE if the reporting entity has a “controlling financial interest” in the VIE, as demonstrated by the reporting entity having both (i) the power to direct the activities of a VIE that most significantly impact the VIE's economic performance; and (ii) the right to receive benefits from the VIE that could potentially be significant to the VIE or the obligation to absorb losses of the VIE that could potentially be significant to the VIE.

 

 

 

F-44


 

Report of Ernst & Young LLP

Independent Registered Public Accounting Firm

The Board of Directors and Stockholders

Jacobs Engineering Group Inc.

We have audited the accompanying consolidated balance sheets of Jacobs Engineering Group Inc. and subsidiaries as of September 30, 2016 and October 2, 2015, and the related consolidated statements of earnings, comprehensive income, stockholders' equity, and cash flows for each of the three fiscal years in the period ended September 30, 2016. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.  

In our opinion, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of Jacobs Engineering Group Inc. and subsidiaries at September 30, 2016 and October 2, 2015, and the consolidated results of their operations and their cash flows for each of the three fiscal years in the period ended September 30, 2016, in conformity with U.S. generally accepted accounting principles.  

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), Jacobs Engineering Group Inc. and subsidiaries’ internal control over financial reporting as of September 30, 2016, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) and our report dated November 22, 2016 expressed an unqualified opinion thereon.

As discussed in Note 2 to the consolidated financial statements, the Company changed the presentation of its deferred tax assets and liabilities to noncurrent in the consolidated balance sheets as a result of the adoption of Accounting Standards Update No. 2015-17 - Balance Sheet Classification of Deferred Taxes.

 

/S/ Ernst & Young LLP

Los Angeles, California

November 22, 2016

 

 

F-45


 

Report of Ernst & Young LLP

Independent Registered Public Accounting Firm

The Board of Directors and Stockholders

Jacobs Engineering Group Inc.

We have audited Jacobs Engineering Group Inc. and subsidiaries’ internal control over financial reporting as of September 30, 2016, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) (the COSO criteria). Jacobs Engineering Group Inc. and subsidiaries’ management is responsible for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, Jacobs Engineering Group Inc. and subsidiaries maintained, in all material respects, effective internal control over financial reporting as of September 30, 2016, based on the COSO criteria.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheets of Jacobs Engineering Group Inc. and subsidiaries as of September 30, 2016 and October 2, 2015 and the related consolidated statements of earnings, comprehensive income, stockholders’ equity, and cash flows for each of the three fiscal years in the period ended September 30, 2016 of Jacobs Engineering Group Inc. and subsidiaries and our report dated November 22, 2016 expressed an unqualified opinion thereon.

 

/S/ Ernst & Young LLP

Los Angeles, California

November 22, 2016

 

 

F-46