Exhibit 99.1

    




 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North & South America (excluding Brazil)
 
 
ENSCO DS-3
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
High 490s
 
U.S. Gulf of Mexico
 
Jun. 16
 
Zero rate for 11 days in 3Q13. Plus cost adjustments
ENSCO DS-5
 
Drillship, DP3 Samsung
 
10000/12000
 
Petrobras
 
Mid 430s
 
U.S. Gulf of Mexico
 
Jul. 16
 
Zero rate for 25 days in 3Q13 and approx. 13 days in 4Q13. Eligible for bonus opportunity up to 17%, plus cost adjustments
ENSCO 8500
 
Semisubmersible DP
 
8500/10000
 
Anadarko/Eni
 
Low 300s
 
U.S. Gulf of Mexico
 
Sep. 14
 
Planned inspection for approx. 20 days in 1Q14. Plus cost adjustments and three 1-year same-rate options
ENSCO 8501
 
Semisubmersible DP
 
8500/10000
 
Noble Energy
 
Mid 520s
 
U.S. Gulf of Mexico
 
Aug. 14
 
Planned inspection for approx. 20 days in 2Q14. Plus cost adjustments and three 1-year unpriced options
ENSCO 8502
 
Semisubmersible DP
 
8500/10000
 
Marathon
 
Low 530s
 
U.S. Gulf of Mexico
 
1Q15
 
Zero rate for approx. 8 days in 4Q13. -----. Next to Stone Feb. 14 to Sep. 14, low 530s. Then expect to work into 1Q15
ENSCO 8503
 
Semisubmersible DP
 
8500/10000
 
Cobalt
 
High 540s
 
U.S. Gulf of Mexico
 
2Q14
 
Plus approx. $54,000 per day for reimbursable mobilization expenses and upgrade costs amortized Dec. 11 to Dec. 13. Plus cost adjustments. Then expect to work into 2Q14
ENSCO 8505
 
Semisubmersible DP
 
8500/10000
 
Anadarko/Apache/
Noble Energy
 
High 480s
 
U.S. Gulf of Mexico
 
Jul. 14
 
Plus cost adjustments and two 1-year unpriced options
ENSCO 8506
 
Semisubmersible DP
 
8500/10000
 
Anadarko
 
High 530s
 
U.S. Gulf of Mexico
 
Jul. 15
 
Plus cost adjustments


Page 1 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Brazil
 
 
ENSCO DS-4
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
Mid 550s
 
Brazil
 
Jul. 16
 
Plus cost adjustments
ENSCO 7500
 
Semisubmersible DP
 
8000
 
Petrobras
 
Low 320s
 
Brazil
 
Aug. 14
 
Zero rate for 32 days in 3Q13 and approx. 14 days in 4Q13. Eligible for bonus opportunity up to 5%. Plus approx. $20,000 per day for mobilization revenue and expenses amortized Jan. 12 to Aug. 14. Plus cost adjustments
ENSCO 6001
 
Semisubmersible - DP Megathyst
 
5700
 
Petrobras
 
Mid 370s
 
Brazil
 
Jun. 18
 
Planned shipyard upgrade for approx. 45 days in 2014, mid 210s. Plus approx. $12,000 per day amortized Jun. 13 to Jun. 18 for capital upgrades. Plus cost adjustments
ENSCO 6002
 
Semisubmersible - DP Megathyst
 
5700
 
Petrobras
 
Mid 370s
 
Brazil
 
Jul. 18
 
Zero rate for approx. 5 days in 4Q13. Planned shipyard upgrade for approx. 45 days in 2014, mid 210s. Plus approx. $12,000 per day amortized Jul. 13 to Jul. 18 for capital upgrades. Plus cost adjustments
ENSCO 6003
 
Semisubmersible - DP Megathyst
 
5700
 
Petrobras
 
Low 320s
 
Brazil
 
Jan. 17
 
Zero rate for 7 days in 3Q13 and approx. 7 days in 4Q13. Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 6004
 
Semisubmersible - DP Megathyst
 
5700
 
Petrobras
 
Low 320s
 
Brazil
 
Oct. 16
 
Zero rate for 18 days in 3Q13. Eligible for bonus opportunity up to 15%, plus cost adjustments
ENSCO 5002(*)
 
Semisubmersible - Conv Aker H-3
 
1000
 
OGX
 
Low 220s
 
Brazil
 
Nov. 13
 
 
ENSCO 5004(*)
 
Semisubmersible - Conv F & G Enhanced Pacesetter
 
1500
 
OGX
 
Mid 230s
 
Brazil
 
Nov. 13
 
Mobilize to the Mediterranean ----- upon completion of current contract for contract preparations. Next to Mellitah from 2Q14 to 4Q16, initial rate low 300s at commencement. Plus periodic rate increases resulting in mid 310s average rate over contract. Plus mob fee to be amortized over primary contract term
ENSCO 6000
 
Semisubmersible - DP Amethyst
 
3400/4000
 
Petrobras
 
Mid 270s
 
Brazil
 
Apr. 14
 
Currently outfitted for workover activity
(*)We previously disclosed on our 30 July 2013 conference call that our second quarter 2013 balance sheet included $18 million of OGX receivables associated with ENSCO 5002 and ENSCO 5004 drilling services.  During third quarter 2013, only $2 million of these receivables were collected.
Additionally, we previously disclosed that our third quarter 2013 revenue outlook included $27 million of OGX revenue backlog for ENSCO 5002 and ENSCO 5004. Based on information currently available, we anticipate that we will not recognize revenue in connection with OGX for third quarter 2013.

Page 2 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Europe & Mediterranean
 
 
ENSCO 5006
 
Semisubmersible - Conv Bingo 8,000
 
6200/7500
 
Noble Energy
 
Low 430s
 
-----Israel
 
Dec. 17
 
Next mobilize to Singapore shipyard in early Jan. 14 under contract to Inpex for 40 month drilling program in Australia with estimated commencement 3Q14, initially low 460s. Plus periodic rate increases resulting in low 490s average rate over drilling program. Plus estimate of $164,000 per day amortized over the duration of the drilling program for capital upgrades and day rates during shipyard stay and mobilizations
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Middle East & Africa
 
 
ENSCO DS-1
 
Drillship - DP Gusto 10,000
 
6000/10000
 
TOTAL
 
High 350s
 
Angola
 
Mar. 16
 
Zero rate for 13 days in 3Q13. Planned inspection and upgrade for approx. 60 days in 2Q14. Plus cost adjustments and unpriced options. Eligible for bonus opportunity up to 5%
ENSCO DS-2
 
Drillship - DP Gusto 10,000
 
6000/10000
 
Inspection
 
 
 
Angola
 
2Q15
 
Planned inspection and maintenance for 59 days in 3Q13 and approx. 45 days in 4Q13. Next to Total Nov. 13 to Nov. 14, high 430s. Then mobilize to shipyard for survey and capital upgrade to 2Q15
ENSCO DS-6
 
Drillship, DP3 Samsung
 
10000/12000
 
BP
 
Mid 530s
 
Angola
 
Feb. 18
 
Plus approx. $102,000 per day amortized Feb.13 to Feb. 18 for special day rate ahead of mobilization, upgrade costs and reimbursable mobilization expenses. Plus cost adjustments and two 1-year options at mutually agreed rates
ENSCO DS-7
 
Drillship, DP3 Samsung
 
10000/12000
 
Delivered/Mobilizing/ Load Out
 
 
 
Angola
 
Dec. 16
 
Contracted to Total from Dec. 13 to Dec. 16, initial rate mid 610s for first 90 days after commencement. Plus periodic rate increases resulting in high 640s average rate over three-year contract. Mob fee of $31 million to be amortized over primary contract term
ENSCO 5001
 
Semisubmersible - Conv Sonat
 
5000/6500
 
PetroSA
 
Mid 280s
 
South Africa
 
Jan. 15
 
Zero rate for 12 days in 3Q13. Plus approx. $7,500 per day for reimbursable mobilization expenses amortized Jan. 13 to Jan. 15. Plus two 1-well options, low 320s
ENSCO 5000
 
Semisubmersible - Conv Neptune Pentagon
 
2300/2650
 
-----Shipyard
 
 
 
South Africa
 
 
 
Planned inspection

Page 3 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'(1)
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(2)
 
Comments
Floaters
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Asia & Pacific Rim
 
 
ENSCO 8504
 
Semisubmersible DP
 
8500/10000
 
Shell
 
Mid 550s
 
Malaysia
 
May 15
 
Planned inspection for approx. 10 days in 3Q14. Plus cost adjustments and two 6-month same-rate options. Plus approx. $8,000 per day for mobilization amortized Jul.13 to May 15
ENSCO 5005
 
Semisubmersible - Conv F & G Enhanced Pacesetter
 
1500/1700
 
Shipyard
 
 
 
Singapore
 
1Q14
 
Planned inspection and shipyard upgrades
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Under Construction
 
 
 
 
 
 
 
 
 
 
 
 
ENSCO DS-8
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction 
 
 
 
South Korea
 
3Q14
 
 
ENSCO DS-9
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction 
 
 
 
South Korea
 
4Q14
 
 
ENSCO DS-10
 
Drillship, DP3 Samsung GF12000
 
10000/12000
 
Under construction 
 
 
 
South Korea
 
3Q15
 
 

(1) For rigs that may be modified to drill in deeper water depths, both the currently outfitted and maximum upgrade capabilities are shown.
(2) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the expected delivery date from the shipyard.

Page 4 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North & South America (excluding Brazil)
 
 
U.S. Gulf of Mexico
 
 
ENSCO 68
 
MLT 84-CE
  
400
 
Chevron
 
Mid 130s
 
Gulf of Mexico
 
Jan. 15
 
Zero rate for approx. 15 days in 1Q14. Day rate does not include certain extra reimbursable costs. Rate increases Jan. 14 to mid 140s
ENSCO 69
 
MLT 84-Slot
 
300
 
Cold stacked
 
   
 
Gulf of Mexico
 
 
 
 
ENSCO 75
 
MLT Super 116-C 
  
400
 
-----Fieldwood
 
High 130s
 
Gulf of Mexico 
 
Jan. 14
 
Zero rate for approx. 12 days in 4Q13 for planned maintenance. Plus cost adjustments
ENSCO 81
 
MLT 116-C 
 
350
 
Stone
 
High 130s
 
Gulf of Mexico
 
Jan. 15
 
Next to Chevron Feb. 14 to Jan. 15, mid 140s
ENSCO 82
 
MLT 116-C 
  
300
 
Energy XXI
 
Low 140s
 
Gulf of Mexico 
 
Sep. 14
 
Plus cost adjustments
ENSCO 86
 
MLT 82 SD-C
  
250
 
-----Fieldwood
 
Low 110s
 
Gulf of Mexico
 
Dec. 13
 
-----
ENSCO 87
 
MLT 116-C
  
350
 
-----Fieldwood
 
Low 140s
 
Gulf of Mexico
 
Jan. 14
 
 
ENSCO 90
 
MLT 82 SD-C 
 
250
 
Energy XXI/
Chevron
 
Low 110s
 
Gulf of Mexico 
 
Feb. 14
 
Assigned to Chevron for remainder of contract term. Zero rate for approx. 15 days in 4Q13. Next to Ankor Nov. 13 to Feb. 14, mid 120s
ENSCO 99
 
MLT 82 SD-C
  
250
 
Energy XXI
 
Mid 120s
 
Gulf of Mexico 
 
Jul. 14
 
-----. Zero rate for approx. 14 days in 2Q14 for planned maintenance
Pride Wisconsin
 
MLT-Slot
 
300
 
Cold stacked
 
 
 
Gulf of Mexico
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Mexico
 
 
ENSCO 83
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Oct. 16
 
 
ENSCO 89
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Nov. 15
 
Planned inspection 4Q13 for approx. 14 days
ENSCO 93
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Jun. 15
 

ENSCO 98
 
MLT 82 SD-C
 
250
 
Pemex
 
Low 90s
 
Mexico
 
Aug. 15
 


Page 5 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Europe
 
 
North Sea
 
 
ENSCO 70
 
Hitachi K1032N
 
250
 
RWE Dea
 
Mid 140s
 
UK
 
May 16
 
Next planned shipyard upgrade and inspection for approx. 10 days in 4Q13 and approx. 80 days in 1Q14. Then to RWE Dea Mar. 14 to May 14, mid 140s. Plus one 1-well unpriced option. Then to Maersk in Denmark to May 16, low 160s. Plus approx. $18,000 per day for reimbursable upgrade costs and day rate during shipyard stay amortized Sep. 14 to Aug. 16. Plus cost adjustments and three 1-year unpriced options
ENSCO 71
 
Hitachi K1032N
 
225
 
Maersk
 
Low 140s
 
Denmark
 
May 14
 
Plus two 1-year options at escalating day rates and one 1-year at mutually agreed rate
ENSCO 72
 
Hitachi K1025N
 
225
 
Maersk
 
Low 140s
 
Denmark
 
Aug. 14
 
Plus two 1-year options at escalating day rates and one 1-year option at mutually agreed rate
ENSCO 80
 
MLT 116-CE
 
225
 
EOG
 
High 90s
 
UK
 
Apr. 17
 
Planned inspection for approx. 20 days in 1Q14. Rate increases Jan. 14 to low 130s, plus cost adjustments. Then to GDF Apr. 14 to Apr. 17, high 130s. Plus cost adjustments and unpriced option
ENSCO 92
 
MLT 116-C
 
225
 
-----Tullow
 
High 140s
 
Netherlands
 
Aug. 15
 
-----. Next to O.N.E. Jan. 14 to May 14, mid 140s. Planned inspection for approx. 14 days in 2Q14. Then to ConocoPhillips in UK Jun. 14 to Aug. 15, low 160s. All with cost adjustments
ENSCO 100
 
MLT 150-88-C
 
350
 
Ithaca
 
Mid 160s
 
UK
 
Dec. 14
 
Plus cost adjustments and two 1-well options
ENSCO 101
 
KFELS MOD V-A
 
400
 
Tullow
 
High 210s
 
UK
 
Oct. 15
 
Plus cost adjustments. Next to BP Oct. 13 to Oct. 15, low 220s. Plus cost adjustments and two 6-month unpriced options
ENSCO 102
 
KFELS MOD V-A
 
400
 
ConocoPhillips
 
Low 210s
 
UK
 
Jun. 16
 
Rate firm for 8 wells (est. through Apr. 15) thereafter at mutually agreed rate. Plus cost adjustments and unpriced options
ENSCO 120
 
ENSCO 120 Series
 
400
 
Delivered/Mobilizing/ Load Out
 
 
 
UK
 
Apr. 15
 
Contracted to Nexen from Dec. 13 to Apr. 15, low 230s. Plus cost adjustments and eleven 1-well options. Mob fee of approx. $8 million to be amortized over primary contract term

Page 6 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Middle East & Africa
 
 
Middle East
 
 
ENSCO 54
 
F&G L-780 Mod II-C
 
300
 
BG
 
Mid 140s
 
India
 
Oct. 17
 
-----. -----. Mobilize to shipyard in May 14 for capital upgrades. Next to Saudi Aramco Oct. 14 to Oct. 17, mid 110s. Plus approx. $39,000 per day for upgrade costs and mobilization amortized Oct. 14 to Oct. 17. Plus one 1-year priced option
ENSCO 58
 
F&G L-780 Mod II
 
250
 
Saudi Aramco
 
Mid 60s
 
Saudi Arabia
 
Jan. 14
 
Plus one 1-year same rate option
ENSCO 76
 
MLT Super 116-C
 
350
 
Saudi Aramco
 
Low 100s
 
Saudi Arabia
 
Jul. 14
 
Planned inspection for approx. 21 days in 2Q/3Q14. Plus one 1-year option, high 150s
ENSCO 84
 
MLT 82 SD-C
 
250
 
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Plus one 1-year option, mid 70s
ENSCO 88
 
MLT 82 SD-C
 
250
 
Shipyard
 
 
 
Qatar
 
Nov. 16
 
Planned shipyard upgrade and mobilization for 92 days in 3Q13 and approx. 45 days in 4Q13. Then to Saudi Aramco Nov. 13 to Nov. 16, low 100s. Plus one 1-year priced option
ENSCO 91
 
Hitachi Zosen Drill Hope C-150
 
270
 
Saudi Aramco
 
High 60s
 
Saudi Arabia
 
Aug. 14
 
Planned inspection for approx. 21 days in 4Q14. Plus one 1-year option, mid 90s
ENSCO 94
 
Hitachi 250-C
 
250
 
Saudi Aramco
 
Low 100s
 
Saudi Arabia
 
Jun. 16
 
Planned inspection for approx. 14 days in 3Q14. Plus one 1-year priced option
ENSCO 96
 
Hitachi 250-C
 
250
 
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Planned shipyard upgrade for approx. 30 days in 4Q13 and approx. 50 days in 1Q14. Plus one 1-year option, mid 70s
ENSCO 97
 
MLT 82 SD-C
 
250
 
Saudi Aramco
 
Low 60s
 
Saudi Arabia
 
Nov. 14
 
Planned shipyard upgrade for approx. 65 days in 1Q14 and approx. 15 days in 2Q14. Plus one 1-year option, mid 70s

Page 7 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Asia & Pacific Rim
 
 
Southeast Asia / Australia
 
 
ENSCO 52
 
F&G L-780 Mod II-C
 
300
 
Murphy
 
Mid 80s
 
Malaysia
 
Aug. 14
 
Plus cost adjustments and one 1-year unpriced option. Plus $15,000 per day for upgrade costs amortized Jun. 13 to Nov. 13
ENSCO 53
 
F&G L-780 Mod II-C
 
300
 
Shell
 
Low 100s
 
Malaysia
 
Feb. 16
 
Inspection for 14 days in 3Q13. Mobilize to Abu Dhabi in late Dec. 13. Next to NDC Feb. 14 to Feb. 16, low 100s. Plus two 1-year unpriced options
ENSCO 56
 
F&G L-780 Mod II-C
 
300
 
Pertamina
 
Mid 110s
 
Indonesia
 
Jul. 15
 
Shipyard upgrade and mobilization for 7 days in 3Q13. Plus approx. $3,000 per day for mobilization amortized Jul. 13 to Jul. 15. Plus one 8-month unpriced option
ENSCO 67
 
MLT 84-CE
 
400
 
Pertamina
 
Mid 130s
 
Indonesia
 
Mar. 16
 
Plus one 8-month unpriced option
ENSCO 85
 
MLT 116-C 
 
300
 
Pertamina
 
Mid 130s
 
Indonesia
 
Feb. 14
 
Plus approx. $7,000 per day for mobilization amortized Jan. 13 to Jan. 14. Plus one 8-month unpriced option
ENSCO 104
 
KFELS MOD V-B
 
400
 
ENI
 
High 220s
 
Australia
 
Mar. 14
 
Plus cost adjustments. Plus approx. $16,000 per day for mobilization amortized Jun. 13 to Mar. 14
ENSCO 105
 
KFELS MOD V-B
 
400
 
Petronas Carigali
 
Mid 150s
 
Malaysia
 
Nov. 14
 
Mobilization and contract preparations for approx. 16 days in 4Q13. Next to Shell from Nov. 13 to Nov. 14, low 160s. Plus approx. $7,000 per day for mobilization amortized Nov. 13 to Nov. 14. Plus cost adjustments and one 6-month unpriced option and one 1-year unpriced option
ENSCO 106
 
KFELS MOD V-B
 
400
 
Newfield
 
Low 140s
 
Malaysia
 
Oct. 14
 
Rate increases mid Oct. 13 to mid 150s, plus cost adjustments
ENSCO 107
 
KFELS MOD V-B
 
400
 
Mitra/ENI
 
Low 170s
 
Vietnam
 
Jan. 15
 
Assigned to ENI. Next to Mitra Energy from Nov. 13 to Jan. 14, low 170s. Then contract preparations and mobilization for approx. 56 days in 1Q14 in advance of drilling operations for OMV in New Zealand Mar. 14 to Jan. 15, low 230s. Day rate earned during contract preparations and mob fee to be amortized over primary contract term. Plus cost adjustments and one 90-day unpriced option
ENSCO 108
 
KFELS MOD V-B
 
400
 
PTTEP
 
Mid 130s
 
Thailand
 
Apr. 14
 
Plus approx. $2,000 per day for upgrade costs amortized Apr. 12 to Apr. 14
ENSCO 109
 
KFELS MOD V-Super B
 
350
 
PTTEP
 
Low 200s
 
Australia
 
Dec. 13
 
Plus approx. $41,000 per day for mobilization amortized Sep. 13 to Nov. 13

Page 8 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Jackups
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Asia & Pacific Rim
 
 
Under Construction
 
 
ENSCO 121
 
ENSCO 120 Series
 
400
 
Under construction/
Contracted
 
 
 
Singapore
 
2Q16
 
Contracted to Wintershall in Danish and Dutch sector from 2Q14 to 2Q16, low 230s. Plus one 1-year unpriced option. Mob fee of approx. $8 million to be amortized over primary contract term
ENSCO 122
 
ENSCO 120 Series
 
400
 
Under construction
 
 
 
Singapore
 
3Q14
 
 
ENSCO 110
 
KFELS MOD V-B
 
400
 
Under construction
 
 
 
Singapore
 
1Q15
 
 

(1) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the expected delivery date from the shipyard.


Page 9 of 10


 
 
Ensco plc
Fleet Status Report
17 October 2013
 
 
 
Monthly Changes: bolded rig names and underlined text signify changes in rig status from previous report.
Segment /
Region / Rig
 
Design
 
Water
Depth'
 
Customer/
Status
 
Day Rate
$000′s US
 
Location
 
Est. Avail(1)
 
Comments
Other
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Deepwater Drilling Management
 
 
Thunderhorse
 
Deepwater Semisubmersible
 
6000
 
BP
 
Low 100s
 
U.S. Gulf of Mexico
 
Jan. 14
 
Plus three 1-year priced options, plus cost adjustments
Mad Dog
 
Deepwater Spar Drilling Rig
 
4500
 
BP
 
Low 60s
 
U.S. Gulf of Mexico
 
Jan. 15
 
Plus one 1-year priced option, plus cost adjustments

(1) Estimated available date for rig after current and follow-on contracts (excluding option period) and shipyard stays have been completed. For newbuild rigs without a contract, the estimated available date is the expected delivery date from the shipyard.
 
Definitions and Disclaimers
 
Day Rate Definition. The day rates reflected in this Fleet Status Report are the operating day rates charged to customers, which may include estimated contractual adjustments for changes in operating costs and/or reimbursable cost adjustments for ongoing expenses such as crew, catering, insurance and taxes. The day rates, however, do not include certain types of non-recurring revenues such as lump sum mobilization payments, revenues earned during mobilizations, revenues associated with contract preparation and other non-recurring reimbursable items such as mobilizations and capital enhancements, and the impact of the fair market value adjustments to previously acquired drilling contracts. Routine and non-routine downtime may reduce the actual revenues recognized during the contract term. Additionally, the Company occasionally negotiates special rates with customers as noted in the comments that reduce revenues recognized during the contract term. Significant zero rate estimates are reflected in the comments section.
 
Forward Looking Statement. Statements contained in this Fleet Status Report that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements include words or phrases such as “anticipate,” “believe,” “estimate,” “expect,” “intend,” “plan,” “project,” “could,” “may,” “might,” “should,” “will” and similar words and specifically include statements involving future rig day rates; cost adjustments; utilization; estimated rig availability; contract duration, status, terms and other contract commitments; customers; rig enhancement projects; new rig commitments; the expected period of time and number of rigs that will be in a shipyard for repairs, maintenance, enhancement or construction; and scheduled delivery dates for new rigs. Such statements are subject to numerous risks, uncertainties and assumptions that may cause actual results to vary materially from those indicated, including governmental regulatory, legislative and permitting requirements affecting drilling operations; changes in worldwide rig supply and demand, competition and technology; future levels of offshore drilling activity; downtime and other risks associated with offshore rig operations, relocations, severe weather or hurricanes; possible cancellation or suspension of drilling contracts as a result of mechanical difficulties, performance or other reasons; risks inherent to shipyard rig construction, repair, maintenance or enhancement; actual contract commencement dates; environmental or other liabilities, risks or losses; our ability to attract and retain skilled personnel on commercially reasonable terms; governmental action, civil unrest and political and economic uncertainties; terrorism, piracy and military action; and the outcome of litigation, legal proceedings, investigations or other claims or contract disputes.  In addition to the numerous factors described above, you should also carefully read and consider “Item 1A. Risk Factors” in Part I and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II of our most recent annual report on Form 10-K, as updated in our subsequent quarterly reports on Form 10-Q, which are available on the SEC’s website at www.sec.gov or on the Investor Relations section of our website at www.enscoplc.com.  Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to publicly update or revise any forward looking statements, except as required by law.

Page 10 of 10