NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - July 6, 2011
Approximate actual & estimated unpaid down time days *
 
RIG
 
RIG DESIGN
 
YEAR BUILT / REBUILT
 
WATER DEPTH
 
LOCATION
 
OPERATOR
 
ESTIMATED CONTRACT START DATE
 
ESTIMATED CONTRACT EXPIRATION DATE
 
FULL CONTRACT DAYRATE ($000)
 
COMMENTS
2Q-11
3Q-11
3Q-11
4Q-11
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A
A
E
E
This fleet status report contains information on contracts and letters of intent or awards with our customers. Letters of intent or awards are noted in the comments section and may not result in an actual drilling contract. The information contained in this fleet status report is as of the date of the report only and is subject to change without notice to the recipient, and we assume no duty to update any portion of the information contained herein. This fleet status report contains statements that are not historical facts, which are “forward-looking statements” within the meaning of the U.S. federal securities laws. Forward-looking statements include, but are not limited to, statements about estimated duration of client contracts, contract dayrate amounts, future contract commencement dates, shipyard projects, our business, financial performance and prospects. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially.
       
         
Full Contract Dayrate reflects the full daywork operating rate payable to the Company by the operator as provided in the applicable drilling contract unless otherwise specified. The average dayrate over the term of the contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond our control. Our client contracts and operations are generally subject to a number of risks and uncertainties. We discuss these factors, including risks, uncertainties and assumptions concerning actions by our clients, governments and other third parties, drilling activity levels, market conditions, operational difficulties, weather related events and other matters, from time to time in our filings with the U.S. Securities and Exchange Commission (“SEC”), which we urge you to review and which are available free of charge on the SEC’s Web site at www.sec.gov.
       
         
                                               
 
U.S. Gulf of Mexico Semisubmersibles (7)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Noble Danny Adkins (i)
 
Bingo 9000
 
1999/2009
 
12,000'-DP
 
US GOM
 
Shell
 
Early Mar 2011
 
Early May 2011
 
155-157
 
Standby/Suspension rate. Subsea System has been certified.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Early May 2011
 
Late Nov 2014
 
461-463
 
 
34
 
 
 
                                       
 
 
 
 
 
Noble Jim Day
 
Bingo 9000
 
1999/2009
 
12,000'-DP
 
US GOM
 
Shell
 
Mid Feb 2011
 
Late May 2011
 
155-157
 
Letter of intent. Standby/Suspension rate. Subsea System has been certified.
 
 
 
 
                 
US GOM
 
Shell
 
Early Jun 2011
 
Late Jul 2011
 
241-243
 
Letter of intent. Standby/Suspension rate.
 
 
 
 
                 
US GOM
 
Shell
 
Early Aug 2011
 
Late Jan 2012
 
484-486
 
Letter of intent. Eligible for a maximum 15% bonus. Beginning the sooner of 8/01/2011 or Shell securing a drilling permit for use of the unit.
 
 
 
 
                                       
 
 
 
 
 
Noble Amos Runner (a)
 
Noble EVA 4000™
 
1982/1999
 
8,000'
 
US GOM
 
LLOG
 
Mid Oct 2010
 
Early Jul 2011
 
334-336
 
Subsea System has been certified.
 
 
 
 
                                       
 
 
 
 
 
Noble Jim Thompson (a, i)
 
Noble EVA 4000™
 
1984/1999
 
6,000'
 
US GOM
 
Shell
 
Early Feb 2011
 
Early Apr 2011
 
84-86
 
Standby/Suspension rate.
3
 
 
 
                 
US GOM
 
Shell
 
Early Apr 2011
 
Late Nov 2014
 
359-361
 
Eligible for a maximum 15% bonus. Subsea System has been certified.
 
 
 
 
                             
 
       
 
 
 
 
 
Noble Paul Romano (a)
 
Noble EVA 4000™
 
1981/1998
 
6,000'
 
US GOM
 
Shipyard
 
Mid Jun 2010
 
 
 
-
 
Available. The unit is currently warm stacked. Subsea System has been certified.
 
 
 
 
                                       
 
 
 
 
 
Noble Driller (i)
 
Aker H-3 Twin Hull S1289 Column
 
1976/2007
 
5,000'
 
US GOM
 
Shell
 
Early Feb 2011
 
Early Jul 2011
 
84-86
 
Standby/Suspension rate. Subsea System is in the certification process.
 
 
 
 
                 
US GOM
 
Shell
 
Late Jul 2011
 
Late Jun 2013
 
382-384
 
Timing of resumption of operations at full dayrate estimated based on customer information regarding their ability to obtain necessary permits and is subject to change. Plus five one-year options.
 
 
 
 
                                       
 
 
 
 
 
Noble Lorris Bouzigard (b)
 
Pentagone 85
 
1975/2003
 
4,000'
 
US GOM
 
Shipyard
 
Early Oct 2010
 
 
 
-
 
The unit is currently cold stacked.
 
 
 
 
                                               
                                               
 
U.S. Gulf of Mexico Submersibles (2)
 
 
 
 
 
Noble Joe Alford
 
Pace Marine 85G
 
1982/2006
 
70’-C
 
US GOM
 
Shipyard
 
Mid Sep 2009
 
 
 
-
 
Cold Stacked.
 
 
 
 
                                       
 
 
 
 
 
Noble Lester Pettus
 
Pace Marine 85G
 
1982/2007
 
70’-C
 
US GOM
 
Shipyard
 
Early Jun 2009
     
-
 
Cold Stacked.
 
 
 
 
 
Mexico Semisubmersible (1) (c)
 
 
 
 
 
Noble Max Smith
 
Noble EVA 4000™
 
1980/1999
 
7,000'
 
Bay of Campeche
 
Pemex
 
Early Aug 2008
 
Late Jul 2011
 
483-485
 
We have received a request for an extension of the current contract with a start date of Early August 2011, which subject to finalizing the contract, would extend the contract to Early Mar 2012.
13
 
 
 
                                               
 
Mexico Jackups (12) (c, d)
 
 
 
 
 
Noble Bill Jennings
 
MLT Class 84-E.R.C.
 
1975/1997
 
390’-IC
 
Bay of Campeche
 
Pemex
 
Mid Mar 2011
 
Late Dec 2011
 
99-101
 
 
10
 
 
 
                                       
 
 
 
 
 
Noble Eddie Paul
 
MLT Class 84-E.R.C.
 
1976/1995
 
390’-IC
 
Bay of Campeche
 
Pemex
 
Late Jun 2011
 
Late Dec 2011
 
99-101
   
 
 
 
 
                                       
 
 
 
 
 
Noble Leonard Jones
 
MLT Class 53-E.R.C.
 
1972/1998
 
390’-IC
 
Bay of Campeche
 
Pemex
 
Mid Mar 2011
 
Mid Dec 2011
 
99-101
 
 
1
 
 
 
                                       
 
 
 
 
 
Noble Johnnie Hoffman
 
Baker Marine BMC 300
 
1976/1993
 
300’-IC
 
US GOM
 
Shipyard
 
Late Dec 2010
 
Late May 2011
 
-
   
 
 
 
 
                 
Bay of Campeche
 
Pemex
 
Late May 2011
 
Late Dec 2012
 
79-81
   
 
 
 
 
                                       
 
 
 
 
 
Noble Gene Rosser
 
Levingston Class 111-C
 
1977/1996
 
300’-IC
 
US GOM
 
Shipyard
 
Late Dec 2010
 
Mid Apr 2011
 
-
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Bay of Campeche
 
Pemex
 
Late Apr 2011
 
Late Dec 2011
 
79-81
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble John Sandifer
 
Levingston Class 111-C
 
1975/1995
 
300’-IC
 
Mexico
 
Shipyard
 
Mid Feb 2011
 
Mid Apr 2011
 
-
   
 
 
 
 
                 
Bay of Campeche
 
Pemex
 
Mid Apr 2011
 
Late Dec 2012
 
82-84
   
 
 
 
 
                                       
 
 
 
 
 
Noble Lewis Dugger
 
Levingston Class 111-C
 
1977/1997
 
300’-IC
 
US GOM
 
Shipyard
 
Mid Nov 2010
 
Late Apr 2011
 
-
 
We were recently informed by our customer that the contract commencement date changed from Late April 2011 to Late June 2011, which is the date our customer officially accepted the unit. We do not agree with our customer’s position and are in discussions, but pending resolution we do not plan to recognize the revenue for this period.
 
 
 
 
 
 
 
 
 
 
 
 
 
Bay of Campeche
 
Pemex
 
Late Jun
2011
 
Early Dec 2012
 
82-84
 
 
10
 
 
 
                                       
 
 
 
 
 
Noble Sam Noble
 
Levingston Class 111-C
 
1982
 
300’-IC
 
Bay of Campeche
 
Pemex
 
Mid Jul 2011
 
Late Dec 2011
 
80-82
   
 
 
 
 
                                       
 
 
 
 
 
Noble Roy Butler
 
F&G L-780 MOD II
 
1982/1998
 
 250’-IC (f)
 
Bay of Campeche
 
Pemex
 
Late July 2010
 
Mid Apr 2011
 
62-64
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Bay of Campeche
 
Pemex
 
Mid Apr 2011
 
Late May 2011
 
57-59
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
US GOM
 
Shipyard
 
Early Jun 2011
 
Late Sept 2011
 
-
 
Leg upgrade to increase water depth rating to 300'.
30
6
86
 
                                       
 
 
 
 
 
Noble Earl Frederickson
 
MLT Class 82-SD-C
 
1979/1999
 
250’-IC
 
Bay of Campeche
 
Pemex
 
Late Dec 2010
 
Late Apr 2011
 
-
   
 
 
 
 
                 
Bay of Campeche
 
Pemex
 
Early May 2011
 
Mid Sept 2011
 
57-59
   
 
 
 
 
                                       
 
 
 
 
 
Noble Tom Jobe
 
MLT Class 82-SD-C
 
1982
 
250’-IC
 
Bay of Campeche
 
Pemex
 
Early Feb 2010
 
Early May 2011
 
79-81
 
This contract commenced 8/07/2008. The contract reprices every three months based on an index of jackup rates in seven international regions. On 2/07/2010, the contract repriced at a new dayrate of $79k-$81k.
 
 
 
 
 
 
 
 
 
 
 
 
 
Bay of Campeche
 
Pemex
 
Early May 2011
 
Early Dec 2011
 
74-76
 
On 5/07/2011, the contract repriced at a new dayrate of $74k-$76k. The next date on which the contract is expected to reprice is 8/07/2011.
4
 
 
18
                                       
 
 
 
 
 
Noble Carl Norberg
 
MLT Class 82-C
 
1976/2003
 
250'-IC
 
Bay of Campeche
 
Pemex
 
Early Mar 2011
 
Late Jul 2011
 
57-59
 
 
 
 
 
 
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
 
 
Page 1 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - July 6, 2011
Approximate actual & estimated unpaid down time days *
 
RIG
 
RIG DESIGN
 
YEAR BUILT / REBUILT
 
WATER DEPTH
 
LOCATION
 
OPERATOR
 
ESTIMATED CONTRACT START DATE
 
ESTIMATED CONTRACT EXPIRATION DATE
 
FULL CONTRACT DAYRATE ($000)
 
COMMENTS
2Q-11
3Q-11
3Q-11
4Q-11
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A
A
E
E
 
Brazil Semisubmersibles (4) (c )(h)
 
 
 
 
 
Noble Dave Beard (b)
 
F&G 9500 Enhanced Pacesetter
 
1986/2008
 
10,000'-DP
 
Brazil
 
Petrobras
 
Mid Mar 2010
 
Mid Mar 2015
 
219-221
 
Eligible for a maximum 15% performance bonus.
50
2
15
 
                                       
 
 
 
 
 
Noble Clyde Boudreaux (a)
 
F&G 9500 Enhanced Pacesetter
 
1987/2007
 
10,000'
 
US GOM
 
Shipyard
 
Mid Dec 2010
 
Early Apr 2011
 
-
 
Subsea System has been certified.
 
 
 
 
                 
Brazil
 
Shell
 
Early Apr 2011
 
Early Apr 2012
 
289-291
 
Plus $6 million mobilization fee. Eligible for a maximum 15% performance bonus.
21
 
 
 
                                       
 
 
 
 
 
Noble Paul Wolff
 
Noble EVA 4000™
 
1981/1999/ 2006
 
9,200'-DP
 
Brazil
 
Petrobras
 
Early Nov 2009
 
Early Nov 2014
 
427-429
 
Eligible for a maximum 15% performance bonus. Timing of survey subject to change.
37
 
10
 
                                       
 
 
 
 
 
Noble Therald Martin (b)
 
Pentagone 85
 
1977/2004
 
4,000'
 
Brazil
 
Petrobras
 
Mid Oct 2010
 
Mid Oct 2015
 
269-271
 
Eligible for a maximum of 10% performance bonus.
3
 
 
45
                                               
 
Brazil Drillships (3) (c )(h)
 
 
 
 
 
Noble Roger Eason (b)
 
NAM Nedlloyd-C
 
1977/2005
 
7,200'-DP
 
Brazil
 
Petrobras
 
Mid Mar 2010
 
Late Feb 2012
 
346-348
 
Eligible for a maximum of 15% performance bonus.
 
 
 
 
 
 
 
 
 
 
 
 
 
Brazil
 
Petrobras
 
Late Feb 2012
 
Mid Oct 2012
 
89-91
 
Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k.
19
 
 
 
 
 
 
 
 
 
 
 
 
Brazil
 
Petrobras
 
Mid Oct 2012
 
Mid Aug 2016
 
346-348
 
Eligible for a maximum of 15% performance bonus.
 
 
 
 
                                       
 
 
 
 
 
Noble Leo Segerius (b)
 
Gusto Engineering Pelican Class
 
1981/2002
 
5,600’-DP
 
Brazil
 
Petrobras
 
Late Jun 2009
 
Early Feb 2011
 
300-302
 
Eligible for a maximum of 15% performance bonus.
 
 
 
 
                 
Brazil
 
Petrobras
 
Early Feb 2011
 
Late Dec 2011
 
89-91
 
Anticipate +/- 240 days beginning in Early March 2011 for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k.
91
6
25
3
                 
Brazil
 
Petrobras
 
Late Dec 2011
 
Late Jan 2016
 
300-302
 
Eligible for a maximum of 15% performance bonus.
 
 
 
 
                                       
 
 
 
 
 
Noble Muravlenko
 
Gusto Engineering Pelican Class
 
1982/1997
 
4,900’-DP
 
Brazil
 
Petrobras
 
Early May 2009
 
4Q 2011
 
289-291
 
Eligible for a maximum of 15% performance bonus.
 
 
 
 
 
 
 
 
 
 
 
 
 
Brazil
 
Petrobras
 
4Q 2011
 
Mid May 2015
 
289-291
 
Eligible for a maximum of 15% performance bonus. Received Petrobras Board approval to swap the Noble Phoenix for the Noble Muravlenko to complete current Noble Muravlenko contract. Expect substitution to take place in 4Q 2011. Noble Muravlenko shipyard upgrade project cancelled.
5
 
 
 
                                               
 
North Sea Semisubmersible (1)
 
 
 
 
 
Noble Ton van Langeveld
 
Offshore Co. SCP III Mark 2
 
1979/2000
 
1,500'
 
United Kingdom
 
Centrica/Maersk
 
Early Dec 2010
 
Late Nov 2011
 
246-248
 
Plus two fixed-priced options.
 
 
 
 
                                               
 
North Sea/Mediterranean Semisubmersible (1)
 
 
 
 
 
Noble Homer Ferrington
 
F&G 9500 Enhanced Pacesetter
 
1985/2004
 
7,200
 
Israel
 
ExxonMobil / Noble Energy
 
Mid Apr 2009
 
Mid Apr 2012
 
504-506
 
Assignment to Repsol which began Mid Mar 2011 until Mid June 2011. Assignment to Noble Energy began Late June 2011.
3
 
 
 
                                               
 
North Sea Jackups (8)
 
 
 
 
 
Noble Hans Deul
 
F&G JU-2000E
 
2009
 
400'-IC
 
United Kingdom
 
Shell
 
Early Feb 2011
 
Early Feb 2013
 
174-176
 
 
3
 
 
 
                                       
 
 
 
 
 
Noble Julie Robertson
 
Baker Marine Europe Class
 
1981/2001
 
 390'-IC (e)
 
United Kingdom
 
Centrica
 
Early Apr 2011
 
Late Mar 2012
 
88-90
   
 
 
 
 
                 
 
                   
 
 
 
 
 
Noble Al White
 
CFEM T-2005-C
 
1982/2005
 
360’-IC
 
Netherlands
 
Total
 
Early Dec 2010
 
Early Jun 2011
 
111-113
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Netherlands
 
Total
 
Early Jun 2011
 
Early Dec 2011
 
95-97
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Netherlands
 
Total
 
Early Dec 2011
 
Early Oct 2012
 
101-103
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble Byron Welliver
 
CFEM T-2005-C
 
1982
 
300’-IC
 
Germany
 
ABB
 
Early Mar 2011
 
Early May 2011
 
64-66
 
Accommodation work. Plus four one-week priced options.
 
 
 
 
                 
Netherlands
 
Gaz de France
 
Early May 2011
 
Late May 2011
 
79-81
   
2
 
 
 
                 
Netherlands
 
Chevron
 
Early Jun 2011
 
Late Nov 2011
 
88-91
   
 
 
 
 
                 
United Kingdom
 
Centrica
 
Early Dec 2011
 
Early Mar 2012
 
90-92
 
Three well contract, estimated +/- 120 days.
 
 
 
 
                                       
 
 
 
 
 
Noble Lynda Bossler
 
MSC/CJ-46
 
1982
 
250’-IC
 
Netherlands
 
Gaz de France/Wintershall
 
Early Nov 2010
 
Early Apr 2011
 
79-81
 
Plus a 35-day priced option.
 
 
 
 
 
 
 
 
 
 
 
 
 
Netherlands
 
Dana (KNOC)
 
Early Apr 2011
 
Mid Dec 2011
 
87-89
 
Plus one 40-day priced option.
 
 
 
 
 
 
 
 
 
 
 
 
 
Netherlands
 
Gaz de France
 
Mid Dec 2011
 
Early May 2012
 
104-106
 
Two well contract, estimated +/- 140 days.
 
 
 
 
                                       
 
 
 
 
 
Noble Piet van Ede
 
MSC/CJ-46
 
1982
 
250’-IC
 
Netherlands
 
Gaz de France
 
Late Nov 2010
 
Late Nov 2011
 
85-87
   
 
 
 
 
                                       
 
 
 
 
 
Noble Ronald Hoope
 
MSC/CJ-46
 
1982
 
250’-IC
 
Netherlands
 
Gaz de France
 
Mid Dec 2010
 
Late Dec 2011
 
86-88
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble George Sauvageau
 
NAM Nedlloyd-C
 
1981
 
250’-IC
 
Netherlands
 
Wintershall
 
Early Jan 2011
 
Late Dec 2011
 
91-93
   
 
 
 
 
                                               
 
West Africa Drillship (1)
 
 
 
 
 
Noble Duchess
 
Conversion
 
1975
 
1,500'
 
Nigeria
 
Shipyard
 
Early Nov 2010
 
 
 
-
 
Available. The unit is currently cold stacked.
 
 
 
 
                                               
 
West Africa Jackups (5) (c )
 
 
 
 
 
Noble Percy Johns
 
F&G L-780 MOD II
 
1981/1995
 
300’-IC
 
Nigeria
 
ExxonMobil
 
Early Jul 2010
 
Mid Mar 2011
 
84-86
 
2-years firm plus a 1-year priced option; which is subject to a 240-day notice of cancellation. We experienced a fire on March 19, 2011 on the rig and anticipate +/- five months of downtime to complete the repairs.
91
6
86
 
 
 
 
 
 
 
 
 
 
Nigeria
 
Shipyard
 
Mid Mar 2011
 
Late Sept 2011
 
-
 
Rig was swapped for Noble Lloyd Noble to perform under contract with ExxonMobil in Mid Jun 2011.
 
 
 
 
 
 
 
 
 
 
 
 
 
Nigeria
 
ExxonMobil
 
Early Oct 2011
 
Late Jun 2012
 
84-86
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble Tommy Craighead
 
F&G L-780 MOD II
 
1982/2003
 
300’-IC
 
Cameroon
 
EurOil
 
Early May 2010
 
Late June 2011
 
89-91
 
Entered the shipyard in Late June 2011 for regulatory inspection and upgrades.
7
6
71
 
                                       
 
 
 
 
 
Noble Ed Noble
 
MLT Class 82-SD-C
 
1984/2003
 
250’-IC
 
Nigeria
 
ExxonMobil
 
Early Jul 2010
 
Late Jun 2012
 
84-86
 
2-years firm plus a 1-year priced option; which is subject to a 240-day notice of cancellation.
4
 
5
 
                                       
 
 
 
 
 
Noble Lloyd Noble
 
MLT Class 82-SD-C
 
1983/1990
 
250’-IC
 
Cameroon
 
Shipyard
 
Early Jan 2011
 
Early Jun 2011
 
-
 
Available.
 
 
 
 
                 
Nigeria
 
ExxonMobil
 
Mid Jun
2011
 
Late Sept 2011
 
84-86
 
Rig was swapped for Noble Percy Johns to perform under contract with ExxonMobil in Mid Jun 2011.
 
 
 
 
                                       
 
 
 
 
 
Noble Don Walker
 
Baker Marine BMC 150-SD
 
1982/1992
 
150’-IC
 
Cameroon
 
Shipyard
 
Mid Mar 2009
 
 
 
-
 
Available. The unit is currently cold stacked.
 
 
 
 
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
 
 
Page 2 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - July 6, 2011
Approximate actual & estimated unpaid down time days *
 
RIG
 
RIG DESIGN
 
YEAR BUILT / REBUILT
 
WATER DEPTH
 
LOCATION
 
OPERATOR
 
ESTIMATED CONTRACT START DATE
 
ESTIMATED CONTRACT EXPIRATION DATE
 
FULL CONTRACT DAYRATE ($000)
 
COMMENTS
2Q-11
3Q-11
3Q-11
4Q-11
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A
A
E
E
 
Arabian Gulf Jackups (14) (c )
 
 
 
 
 
Noble Scott Marks
 
F&G JU-2000E
 
2009
 
400'-IC
 
UAE (Hamriyah)
 
Shipyard
 
Mid Jan 2011
 
Late Jun 2011
 
-
 
Mobilization and contract preparation.
71
 
 
 
 
 
 
 
 
 
 
 
 
Saudi Arabia
 
Saudi Aramco
 
Early Jul 2011
 
Early Jul 2014
 
236-238
 
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contracted time.
 
 
 
 
                                       
 
 
 
 
 
Noble Roger Lewis
 
F&G JU-2000E
 
2007
 
400'-IC
 
Saudi Arabia
 
Saudi Aramco
 
Early Mar 2011
 
Early Mar 2014
 
131-133
 
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contracted time.
 
 
 
 
                                       
 
 
 
 
 
Noble Jimmy Puckett
 
F&G L-780 MOD II
 
1982/2002
 
300'-IC
 
Qatar
 
RasGas
 
Early Apr 2010
 
Early Apr 2012
 
71-73
 
Contract is subject to 120-day notice of cancellation. Plus a two-year priced option.
 
 
 
 
                                       
 
 
 
 
 
Noble Gus Androes
 
Levingston Class 111-C
 
1982/2004
 
300'-IC
 
Qatar
 
Maersk Oil Qatar
 
Mid Dec 2010
 
Late Sept 2011
 
52-54
 
Accommodation work.
 
 
 
 
                                       
 
 
 
 
 
Noble Harvey Duhaney
 
Levingston Class 111-C
 
1976/2001
 
300'-IC
 
Qatar
 
Total
 
Early Jun 2010
 
Early Dec 2011
 
59-61
 
Contract is subject to a 60-day notice of cancellation. Plus two six-month priced options.
 
 
 
 
                                       
 
 
 
 
 
Noble Alan Hay
 
Levingston Class 111-C
 
1980/2005
 
300'-IC
 
UAE (Dubai)
 
Dubai Petroleum
 
Mid Oct 2009
 
Mid Nov 2011
 
#
 
Rate withheld at request of operator. Contract is subject to a 90-day notice of cancellation.
 
 
 
 
                 
UAE (Dubai)
 
Dubai Petroleum
 
Mid Nov 2011
 
Mid Nov 2014
 
#
 
Rate withheld at request of operator. Contract is subject to a 270-day notice of cancellation after November 2012.
 
 
 
 
                                       
 
 
 
 
 
Noble Roy Rhodes
 
MLT Class 116-C
 
1979/2009
 
300’-IC
 
Qatar
 
Total E&P Qatar
 
Mid Mar 2011
 
Late Apr 2011
 
74-75
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
UAE (Hamriyah)
 
Shipyard
 
Late Apr 2011
 
Late Jun 2011
 
-
 
Contract preparation; including adding additional leg length.
61
 
 
 
 
 
 
 
 
 
 
328'-IC
 
UAE (Ras Al Khalmah)
 
RAK Al Khalij
 
Late Jun 2011
 
Mid Aug 2011
 
88-90
 
Plus up to 150-day priced option.
 
 
 
 
 
 
 
 
 
 
 
 
 
Oman
 
RAK Petroleum Oman
 
Mid Aug 2011
 
Early Jan 2012
 
92-94
 
Plus up to 200-day priced option.
 
 
 
 
                                       
 
 
 
 
 
Noble Joe Beall
 
Modec 300C-38
 
1981/2004
 
300'-IC
 
Qatar
 
McDermott
 
Early Nov 2010
 
Early May 2011
 
53-55
 
Accommodation work.
 
 
 
 
                 
UAE (Hamriyah)
 
Shipyard
 
Early May 2011
 
Early Sept 2011
 
-
 
Mobilization and contract preparation.
60
6
56
 
                 
Saudi Arabia
 
Saudi Aramco
 
Early Sept 2011
 
Early Sept 2014
 
80-82
 
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contract time. Plus a one-year priced option.
 
 
 
 
                                       
 
 
 
 
                                       
 
 
 
 
 
Noble David Tinsley
 
Modec 300C-38
 
1981/2004
 
300'-IC
 
UAE (Hamriyah)
 
Shipyard
 
Early Dec 2010
 
 
 
-
 
Available. The unit is currently warm stacked.
 
 
 
 
 
 
 
 
 
 
 
 
 
UAE (Dubai)
 
Dubai Petroleum
 
Mid Apr 2011
 
Mid Apr 2013
 
#
 
Rate withheld at request of operator. Contract is subject to a 180-day notice of cancellation after April 2012.
 
 
 
 
                                       
 
 
 
 
 
Noble Gene House
 
Modec 300C-38
 
1981/1998
 
300'-IC
 
Qatar
 
Maersk Oil Qatar
 
Early Jan 2011
 
Mid May 2011
 
49-51
 
Accommodation work.
 
 
 
 
                 
UAE (Hamriyah)
 
Shipyard
 
Mid May 2011
 
Early Sept 2011
 
-
 
Mobilization and contract preparation.
42
6
56
 
                 
Saudi Arabia
 
Saudi Aramco
 
Early Sept 2011
 
Early Sept 2014
 
80-82
 
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contract time. Plus a one-year priced option.
 
 
 
 
                                       
 
 
 
 
 
Noble Charles Copeland
 
MLT Class 82-SD-C
 
1979/2001
 
280’-IC
 
UAE (Hamriyah)
 
Shipyard
 
Early Dec 2009
 
Late May 2011
 
-
 
Available. The unit is currently warm stacked.
 
 
 
 
 
 
 
 
 
 
 
 
 
Qatar
 
Maersk Oil Qatar
 
Late May 2011
 
Late Aug 2011
 
57-59
 
Accommodation work.
 
 
 
 
                                       
 
 
 
 
 
Noble Chuck Syring
 
MLT Class 82-C
 
1976/1996
 
250’-IC
 
Qatar
 
RasGas
 
Early Feb 2010
 
Early Jan 2012
 
47-49
 
Accommodation work.
 
 
 
 
                                       
 
 
 
 
 
Dhabi II
 
Baker Marine BMC 150
 
1982/2006
 
150'-IC
 
UAE (Abu Dhabi)
 
ADOC
 
Mid Jul 2008
 
Mid Jul 2011
 
81-83
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
UAE (Abu Dhabi)
 
ADOC
 
Mid Jul 2011
 
Mid Jul 2013
 
54-56
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble Dick Favor
 
Baker Marine BMC 150
 
1982/2004
 
150'-IC
 
UAE (Hamriyah)
 
Shipyard
 
Mid Feb 2010
     
-
 
Available. The unit is currently cold stacked.
 
 
 
 
                                               
 
India Jackups (4) (c, d)
 
 
 
 
 
Noble Ed Holt
 
Levingston Class 111-C
 
1981/2003
 
300’-IC
 
India
 
Jindal/ONGC
 
Late Feb 2010
 
Late Feb 2015
 
54-56
 
Rig bareboat chartered to Jindal which is contracted with ONGC.
 
 
 
 
                                       
 
 
 
 
 
Noble George McLeod
 
F&G L-780 MOD II
 
1981/1995
 
300’-IC
 
India
 
Jindal/ONGC
 
Early Jan 2009
 
Early Jan 2012
 
132-134
 
Rig bareboat chartered to Jindal which is contracted with ONGC.
 
 
 
 
                                       
 
 
 
 
 
Noble Charlie Yester
 
MLT Class 116-C
 
1980
 
300’-IC
 
India
 
Jindal/ONGC
 
Early Jun 2010
 
Early Jun 2013
 
49-51
 
Rig bareboat chartered to Jindal which is contracted with ONGC.
 
 
 
 
                                       
 
 
 
 
 
Noble Kenneth Delaney
 
F&G L-780 MOD II
 
1983/1998
 
300'-IC
 
India
 
Deepwater Drilling/ONGC
 
Early Oct 2010
 
Late Sep 2013
 
49-51
 
Rig bareboat chartered to Deepwater Drilling which is contracted with ONGC.
 
 
 
 
                                               
 
Southeast Asia Drillship (2)
 
 
 
 
 
Noble Phoenix
 
Gusto Engineering Pelican Class
 
1979/2009
 
5,000' DP
 
Shipyard & In-transit & acceptance testing
 
Noble
 
Mid Mar 2011
 
4Q 2011
 
-
 
Received Petrobras Board approval to swap the Noble Phoenix for Noble Muravlenko to complete current Noble Muravlenko contract. Expect substitution to take place in 4Q 2011.
91
6
86
 
                                       
 
 
 
 
 
Noble Discoverer
 
Arctic Class Hull ICE-05; Sonat Discoverer Class
 
1976/2009
 
1,000'
 
New Zealand
 
Shell
 
Early Jan 2011
 
Late Dec 2011
 
154-156
 
On April 25, 2011, the Noble Discoverer was operating off the coast of New Zealand when a severe weather event occurred. In anticipation of the severe weather, and in accordance with established procedures for severe weather events, the Noble Discoverer suspended drilling operations, ecured and disconnected from the well. Due to the severe weather, the riser and the lower marine riser package were damaged and released from the vessel. We believe we are entitled to continue receiving dayrate from our customer until repairs are complete. Plus two one-year priced options.
 
 
 
 
                                       
 
 
 
 
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
 
 
Page 3 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - July 6, 2011
Approximate actual & estimated unpaid down time days *
 
RIG
 
RIG DESIGN
 
YEAR BUILT / REBUILT
 
WATER DEPTH
 
LOCATION
 
OPERATOR
 
ESTIMATED CONTRACT START DATE
 
ESTIMATED CONTRACT EXPIRATION DATE
 
FULL CONTRACT DAYRATE ($000)
 
COMMENTS
2Q-11
3Q-11
3Q-11
4Q-11
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A
A
E
E
 
Newbuild Drillship (7)
 
 
 
 
 
Noble Globetrotter I - Newbuild
 
Globetrotter Class
 
2011
 
10,000'-DP
 
Dalian, China - STX / Netherlands - Huisman
 
Shipyard
 
 
 
Late Dec 2011
 
-
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
Late Dec 2011
 
Early Feb 2012
 
-
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
US GOM
 
Shell
 
Mid Feb 2012
 
Mid Feb 2022
 
409-411
 
Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. During the second five years, the unit will earn a dayrate based on a market index and also be eligible for a 15% performance bonus.
 
 
 
 
                                       
 
 
 
 
 
Noble Globetrotter II - Newbuild
 
Globetrotter Class
 
2013
 
10,000'-DP
 
Dalian, China - STX / Netherlands - Huisman
 
Shipyard
     
Early Jun 2013
 
-
   
 
 
 
 
                 
In-transit & acceptance testing
     
Early Jun 2013
 
Late Oct 2013
 
-
   
 
 
 
 
                 
TBA
 
Shell
 
Early Nov 2013
 
Late Oct 2023
 
409-411
 
Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. During the second five years, the unit will earn a dayrate based on a market index and also be eligible for a 15% performance bonus.
 
 
 
 
                                       
 
 
 
 
 
Noble Bully I (g) - Newbuild
 
GustoMSC Bully PRD 12000
 
2011
 
8,200'-DP
 
Keppel
 
Shipyard
 
 
 
Mid Aug 2011
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
Mid Aug 2011
 
Early Dec 2011
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
US GOM
 
Shell
 
Early Dec 2011
 
Early Dec 2016
 
440-445
 
Plus four 1-year priced options.
 
 
 
 
                                       
 
 
 
 
 
Noble Bully II (g) - Newbuild
 
GustoMSC Bully PRD 12000
 
2011
 
8,200'-DP
 
Keppel
 
Shipyard
     
Late Oct 2011
 
     
 
 
 
 
                 
In-transit & acceptance testing
     
Late Oct 2011
 
Late Jan 2012
 
   
 Actual start-up time will be influenced by the length of the customs importation process.
 
 
 
 
                 
Brazil
 
Shell
 
Early Feb 2012
 
Early Feb 2022
 
440-445
 
Contract is at a fixed dayrate the first five years. During the second five years, the unit will earn a dayrate based on a market index.
 
 
 
 
                                       
 
 
 
 
 
HHI Drillship I - Newbuild
 
Gusto P10,000
 
2013
 
12,000'-DP
 
Korea
 
Shipyard
 
 
 
2Q 2013
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
2Q 2013
 
2nd Half of 2013
 
TBA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TBA
 
Shell
 
2nd Half of 2013
 
Late 2018
 
409-411
 
Received Letter of Intent. Eligible for a 15% performance bonus. Drilling contract term will be 5 1/2 years.
 
 
 
 
                                       
 
 
 
 
 
HHI Drillship II - Newbuild
 
Gusto P10,000
 
2013
 
12,000'-DP
 
Korea
 
Shipyard
     
4Q 2013
       
 
 
 
 
                 
In-transit & acceptance testing
     
4Q 2013
 
TBA
       
 
 
 
 
                 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
   
 
 
 
 
                                       
 
 
 
 
 
HHI Drillship III - Newbuild
 
Gusto P10,000
 
2014
 
12,000'-DP
 
Korea
 
Shipyard
 
 
 
2Q 2014
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
2Q 2014
 
TBA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
 
Fixed price option for one additional drillship. The option must be declared by late August 2011 for delivery in 2014.
 
 
 
 
                                               
                                               
 
Newbuild Jackups (4)
 
 
 
 
 
Noble Jackup I - Newbuild
 
F&G JU-3000N
 
2012
 
400'-IC
 
Jurong
 
Shipyard
 
 
 
4Q 2012
 
 
 
Options for up to two additional units which must be exercised by January 1, 2012.
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
1Q 2013
 
TBA
 
 
 
Each option unit may be priced individually and is priced based on the original unit price, plus a potential escalation factor, with future deliveries scheduled in six-month increments beginning in late 2014.
 
 
 
 
 
 
 
 
 
 
 
 
 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble Jackup II - Newbuild
 
F&G JU-3000N
 
2013
 
400'-IC
 
Jurong
 
Shipyard
     
2Q 2013
       
 
 
 
 
                 
In-transit & acceptance testing
     
3Q 2013
 
TBA
       
 
 
 
 
                 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
   
 
 
 
 
                                       
 
 
 
 
 
Noble Jackup III - Newbuild
 
F&G JU-3000N
 
2013
 
400'-IC
 
Jurong
 
Shipyard
 
 
 
4Q 2013
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In-transit & acceptance testing
 
 
 
4Q 2013
 
TBA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
 
 
 
 
 
 
                                       
 
 
 
 
 
Noble Jackup IV - Newbuild
 
F&G JU-3000N
 
2014
 
400'-IC
 
Jurong
 
Shipyard
     
1Q 2014
       
 
 
 
 
                 
In-transit & acceptance testing
     
1Q 2014
 
TBA
       
 
 
 
 
                 
TBA
 
TBA
 
TBA
 
TBA
 
TBA
   
 
 
 
 
                                               
 
Other (1)
 
 
 
 
 
Noble Seillean - FPSO
 
A1 Floating Production & Storage Installation LMC, category 2B ship
 
1989/2008
 
6,500'-DP
 
US GOM
 
 
 
Late Oct 2010
 
 
 
-
 
Available. The unit is currently warm stacked.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
766
44
496
66
(a)
Unit has been upgraded to the NC-5SM mooring standard.
       
(b)
Rig utilizes the Aluminum Alloy Riser technology.
           
(c)
In various market segments, the Company contracts with certain parties for the provision of certain local services and advice. Compensation paid to such parties by the Company typically is based on a percentage of the drilling contract’s daywork operating rate, and the Company accounts for such payments in its financial statements in the contract drilling services operating costs and expenses line item.
 
2011 Total: (includes: planned shipyard and downtime days only.)
1840
     
(d)
Listed rigs are modified bareboat charter; cost structure varies by region.
 
Definitions of Date Ranges:
               
(e)
Leg extensions fabricated to enable the rig to operate in up to 390' of water in a non-harsh environment.
 
Early: 1st - 10th
               
(f)
Rig is currently equipped to operate in 250' of water. Leg extensions fabricated to enable the rig to operate in up to 300' of water.
 
Mid: 11th - 20th
               
(g)
Commitment split 50/50 - Joint Venture between Shell and Noble Corp.
 
Late: 21st - End of Month
               
(h)
The drilling contract provides the client with the right to terminate the contract in the event of excessive downtime.
       
(i)
In June 2010, Noble and Shell agreed to an arrangement to address the current situation in the U.S. Gulf of Mexico relating to the limitation on certain deepwater drilling activities including Shell’s inability to obtain necessary permits from the U.S. BOEMRE. The agreement allowed Shell to suspend the contracts, if necessary, on any rigs currently operating or anticipated to operate in the U.S. Gulf of Mexico during the imposed restriction. In exchange, Shell agreed to pay a reduced suspension rate designed to support Noble's personnel as well as certain operational support costs. The term of the contracts will be extended for a length of time equal to any suspension period at the original contract dayrate.
       
*
A = Actual approximate downtime incurred during the quarter indicated as of the report date; E = Estimated additional downtime days expected to occur as of the report date.
       
 
NOTE: In certain cases, we may have rights against our customers that may result in payment for days which we currently have estimated as downtime.
       
 # =
Rate withheld at request of operator.
       
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
 
 
 
 

 
Page 4 of 4