June 2011 Investor Presentation
Great Plains Energy
Investor Presentation
June 2011
Exhibit 99.1
 
 

 
2
June 2011 Investor Presentation
Statements made in this presentation that are not based on historical facts are forward-looking, may involve risks and
uncertainties, and are intended to be as of the date when made. Forward-looking statements include, but are not limited to,
the outcome of regulatory proceedings, cost estimates of capital projects and other matters affecting future operations. In
connection with the safe harbor provisions of the Private Securities Litigation Reform Act of 1995, Great Plains Energy and
KCP&L are providing a number of important factors that could cause actual results to differ materially from the provided
forward-looking information. These important factors include: future economic conditions in regional, national and
international markets and their effects on sales, prices and costs, including but not limited to possible further deterioration in
economic conditions and the timing and extent of any economic recovery; prices and availability of electricity in regional and
national wholesale markets; market perception of the energy industry, Great Plains Energy and KCP&L; changes in business
strategy, operations or development plans; effects of current or proposed state and federal legislative and regulatory actions
or developments, including, but not limited to, deregulation, re-regulation and restructuring of the electric utility industry;
decisions of regulators regarding rates the companies can charge for electricity; adverse changes in applicable laws,
regulations, rules, principles or practices governing tax, accounting and environmental matters including, but not limited to,
air and water quality; financial market conditions and performance including, but not limited to, changes in interest rates
and credit spreads and in availability and cost of capital and the effects on nuclear decommissioning trust and pension plan
assets and costs; impairments of long-lived assets or goodwill; credit ratings; inflation rates; effectiveness of risk
management policies and procedures and the ability of counterparties to satisfy their contractual commitments; impact of
terrorist acts; ability to carry out marketing and sales plans; weather conditions including, but not limited to, weather-
related damage and their effects on sales, prices and costs; cost, availability, quality and deliverability of fuel; the inherent
uncertainties in estimating the effects of weather, economic conditions and other factors on customer consumption and
financial results; ability to achieve generation goals and the occurrence and duration of planned and unplanned generation
outages; delays in the anticipated in-service dates and cost increases of additional generation, transmission, distribution or
other projects; the inherent risks associated with the ownership and operation of a nuclear facility including, but not limited
to, environmental, health, safety, regulatory and financial risks; workforce risks, including, but not limited to, increased
costs of retirement, health care and other benefits; and other risks and uncertainties.
This list of factors is not all-inclusive because it is not possible to predict all factors. Other risk factors are detailed from time
to time in Great Plains Energy’s and KCP&L’s quarterly reports on Form 10-Q and annual report on Form 10-K filed with the
Securities and Exchange Commission. Each forward-looking statement speaks only as of the date of the particular
statement. Great Plains Energy and KCP&L undertake no obligation to publicly update or revise any forward-looking
statement, whether as a result of new information, future events or otherwise.
Forward-Looking Statement
 
 

 
3
June 2011 Investor Presentation
Company Overview
 
 

 
4
June 2011 Investor Presentation
 Solid Midwest electric utility operating under the KCP&L brand
 Transformational events in 2008 to focus business model on fully
 regulated utility operations
  Sale of Strategic Energy
  Acquisition of Aquila (now KCP&L Greater Missouri Operations,
 or “GMO”)
 Company attributes
  ~824,600 customers / 3,200 employees
  ~6,600 MW of primarily low-cost coal baseload generation
  5-year projected synergies post-GMO acquisition of ~$760M
  ~$8.8bn in assets at 2010YE
  ~$5.6bn in rate base
Service Territories: KCP&L and GMO
Business Highlights
2010 Retail MWh Sold by Customer Type*
2010 Retail MWh Sales by Jurisdiction*
2010 MWh Generated by Fuel Type*
Total: ~ 23,806 MWhs
Total: ~ 23,806 MWhs
Total: ~ 26,679 MWhs
Solid Vertically-Integrated Midwest Utility
* In thousands
 
 

 
5
June 2011 Investor Presentation
 Strong Midwest electric utilities focused on regulated operations in Missouri and Kansas
 Diversified customer base includes ~824,600 residential, commercial, and industrial customers
 ~6,600 Megawatts of generation capacity
 Low-cost generation mix: 80% coal, 17% nuclear (Wolf Creek), 2% natural gas/oil and 1% wind in 2010
100% Regulated
Electric Utility
Operations Focus
 Growth and stability in earnings driven by sizable regulated investments as part of the Comprehensive Energy Plan
 (“CEP”)
  Wind, environmental retrofits and Iatan 2 baseload coal plant all in-service
 Organic growth potential through environmental, transmission, renewable energy and on-going reliability-related
 investment
Attractive Platform for
Long-Term Earnings
Growth
 Constructive outcomes in 2006, 2007 and 2008 rate cases in Missouri and Kansas
 Recent cases
  Kansas - In 2010, the KCC authorized a revenue increase of $22 million and brought Iatan 2 into rate base
 with minimal disallowance
  Missouri - In 2011, the MPSC authorized revenue increases totaling $100.3*million for KCP&L -MO and GMO
 and brought Iatan 2 into rate base with minimal disallowance
Diligent Regulatory
Approach
 Cash flow and earnings heavily driven by regulated operations and cost recovery mechanisms
 Ample liquidity currently available under $1.25bn credit facilities
 Sustainable dividend and pay-out, right-sized to fund growth and to preserve liquidity
 Stable Outlook at Moody’s and S&P
Improved Financial
Position
Strong Platform
* Approximately $7.7 million of the GMO - L&P division increase is deferred and will be phased in, including carrying costs, over a two-year period
 
 

 
6
June 2011 Investor Presentation
Comprehensive Energy Plan
 
Project description 
Comments
 
 
 100 MW plant in Spearville, KS
 Began construction in 2005
ü Completed in Q3 2006
ü In rate base from 1/1/2007
ü No regulatory disallowance
 
 
 Selective Catalytic Reduction (SCR) unit at LaCygne 1
ü  Completed in Q2 2007
ü  In rate base from 1/1/2008
ü  No regulatory disallowance
 
 
 Air Quality Control System at Iatan 1
üCompleted in Q2 2009
üIncluded in KCP&L KS, KCP&L MO and GMO rate base with
 minimal disallowance
 
 
 Construction of Iatan 2 super-critical coal plant (850 MW;
 73% GXP ownership share)1
ü In-service on 8/26/2010; Included in KCP&L KS, KCP&L MO
 and GMO rate base with minimal (1%) disallowance
Great Plains Energy effectively executed all elements of its Comprehensive Energy Plan and
 received constructive regulatory treatment
Iatan 2
Iatan 1
Environmental
LaCygne
Environmental
Wind
1 Includes post-combustion environmental technologies including an SCR system, wet flue gas desulphurization system and fabric filter to control emissions
Strong Track Record of Execution
 
 

 
7
June 2011 Investor Presentation
 
 Rate Jurisdiction
Initial Request
Amount
Approved
 Effective Date
Rate Base
Return on Equity
Rate-making
Equity Ratio
KCP&L - Missouri
$55.8
$50.6
1/1/2007
$1,270
11.25%
53.69%
KCP&L - Missouri
$45.4
$35.3
1/1/2008
$1,298
10.75%
57.62%
KCP&L - Missouri
$101.5
$95.0
9/1/2009
 $1,4961
n/a4
46.63%
KCP&L - Missouri
$92.1
$34.8
5/4/2011
$2,036
10.00%
46.30%
KCP&L - Kansas
$42.3
$29.0
1/1/2007
$1,0001
n/a2
n/a
KCP&L - Kansas
$47.1
$28.0
1/1/2008
$1,1001
n/a3
n/a
KCP&L - Kansas
$71.6
$59.0
8/1/2009
$1,2701
n/a4
50.75%
KCP&L - Kansas
$55.2
$22.0
12/1/2010
$1,781
10.00%
49.66%
GMO - MPS
$94.5
$45.2
6/1/2007
$918
10.25%
48.17%
GMO - MPS
$66.0
$48.0
9/1/2009
$1,1881
n/a5
45.95%
GMO - MPS
$75.8
$35.7
6/25/20117
$1,336
10.00%
46.58%
GMO - L&P
$24.4
$13.6
6/1/2007
$186
10.25%
48.17%
GMO - L&P
$17.1
$15.0
9/1/2009
$2861
n/a5
45.95%
GMO - L&P
$22.1
$29.86
6/25/20117
$422
10.00%
46.58%
1 Rate Base amounts are approximate amounts since the cases were black box settlements; 2 Iatan 2 AFUDC calculation was set at 8.5%; 3  Iatan 2 AFUDC
calculation was set at 8.3%; 4 Iatan 2 AFUDC calculation was set at 8.25%; 5 Iatan 2 AFUDC calculation was set at 10.2%; 6 Approximately $7.7 million is
deferred and will be phased in, including carrying costs, over a two-year period; 7 Current effective date
Focused Regulatory Approach
 
 

 
8
June 2011 Investor Presentation
 
 
Coal Unit
 
 
MW
SCR
 
 
Scrubber
 
Bag
House
Other
Particulate
Control
(f)
 
Mercury
Controls
 
Cooling
Tower
Iatan 1
621(a)
 
 
 
 
 
 
Iatan 2
618(a)
 
 
 
 
 
 
LaCygne 1
368(a)
 
 
 
 
 
 
LaCygne 2
341(a)
 
 
 
 
 
 
Hawthorn 5
563
 
 
 
 
 
 
Sibley 1 and 2
102
 
 
 
 
 
 
Sibley 3
364
 
 
 
 
 
 
Montrose 1, 2 and 3
510
 
 
 
 
 
 
Lake Road 4
99
 
 
 
 
 
 
Jeffrey Energy Center 1, 2 and 3
173(a)
 
 
 
 
 
 
If a scrubber is installed on both LaCygne 2 and Sibley 3, roughly 81 percent of the installed coal capacity would have
scrubbers
(a) KCP&L’s share of jointly-owned facility
(b) LaCygne 1 currently has a scrubber installed; however, 2011-2013 capital expenditure plan includes the installation a new scrubber on the unit
(c) Existing scrubber removes particulate matter; a baghouse is expected to be installed
(d) Existing precipitator will be replaced by a baghouse
(e) Sibley 1 and 2 both have SNCRs installed
(f) Particulate control provided by existing baghouse for Iatan 1, Iatan 2 and Hawthorn 5
 Installed
Coal Fleet Emissions Control Equipment
 
 

 
9
June 2011 Investor Presentation
2010 Highlights and 2011
Regulatory / Operations
Update
 
 

 
10
June 2011 Investor Presentation
ü Completed Iatan 2 consistent with 2005 scheduled commitment of
 “summer 2010”
ü Achieved top-tier customer satisfaction
ü Completed KCP&L’s Kansas rate case; filed cases for KCP&L and GMO in
 Missouri
ü Improved generation fleet performance
ü Completed 48 MW Spearville 2 wind facility
ü Obtained improved outlooks (from “Negative” to “Stable”) at Moody’s
 and S&P
2010 Highlights
 
 

 
11
June 2011 Investor Presentation
2010 Milestones - Iatan 2
 
 

 
12
June 2011 Investor Presentation
Source: 2010 JD Power Residential Study Results (3Q09 to 2Q10)
Customer Satisfaction
 
 

 
13
June 2011 Investor Presentation
 Annual Revenue Increase of $22.0 million (vs. Updated Company Request of
 $50.9 Million)
 10.00% Authorized ROE (vs. Updated Company Request of 10.75%); Equity
 Ratio of 49.66%
 Iatan 2 in Service and Added to Rate Base
  Total project disallowance of $20.4 million of budgeted costs, or about
 1% ($5.1 million KCP&L Kansas jurisdictional share)
 Minimal Iatan 1 Environmental Project Disallowance
 Kansas Jurisdictional Rate Base of $1.781 Billion
 Requested Environmental Rider Denied
 New Rates Effective 12/1/10
KCP&L Kansas Rate Case Results
 
 

 
14
June 2011 Investor Presentation
 Annual Revenue Increase of $34.8 Million or 5.25% (vs. Updated Company
 Request of $66.5 million) Effective May 4, 2011
 10.00% Authorized ROE (vs. Updated Company Request of 10.75%); Equity
 Ratio of 46.3%
 Iatan 2 in Service and Added to Rate Base
 - Total Project Disallowance of $21.1 Million ($6.2 million for KCP&L
 Missouri Jurisdictional Share) or ~1 Percent of Total Project Cost
 Minimal Iatan 1 Environmental Project Disallowance
 KCP&L Missouri Jurisdictional Rate Base of $2.036 Billion
 Off-System Sales Margin Threshold Set at $45.9 Million Missouri Jurisdictional
 Share
 - Compares to Updated Company Request of $29.4 million
KCP&L Missouri Rate Case Results
 
 

 
15
June 2011 Investor Presentation
 Authorized Annual Combined Revenue Increase of $65.5* Million (vs.
 Updated Company Request of $89.1 Million) Currently Effective June 25,
 2011
 Same ROE as KCP&L Missouri; Equity Ratio of 46.58%
 Iatan 2 - Same Total Project Disallowance as in KCP&L Missouri’s Case; $3.8
 Million for GMO’s Share
 Minimal Iatan 1 Environmental Project Disallowance
 MPS Rate Base of $1.336 Billion and L&P Rate Base of $422 Million
 Crossroads Energy Center
 - Approximately $50 Million of Asset Cost Disallowed from Rate Base
 - About $5 Million of Related Transmission Costs Excluded from Cost of
 Service
GMO Rate Case Results
* Approximately $7.7 million of the GMO - L&P division increase is deferred and will be phased in, including carrying costs, over a
 two-year period
 
 

 
16
June 2011 Investor Presentation
 LaCygne Predetermination Filing in Kansas
 Plant Performance
 Recent EPA Proposals
 Customer Consumption
1Q11 Operations Update
 
 

 
17
June 2011 Investor Presentation
 Project includes the installation of:
  LaCygne 1 - Wet scrubber, baghouse, activated carbon injection
  LaCygne 2 - Selective Catalytic Reduction system (SCR), wet scrubber, baghouse, activated
 carbon injection and low NOx burners
 Predetermination filing is for total project cost of $1.23 billion; KCP&L’s total share is
 $615 million and Kansas jurisdictional share is $281 million
 Filing includes request for a LaCygne project-specific rider
 Predetermination case proceeding in parallel with KCC general investigation docket
 concerning environmental retrofits
 Decision in predetermination filing expected in August 2011
Kansas Predetermination Filing Update
 
Coal Unit
 
MW
 
SCR
 
Scrubber
 
Bag House
Other
Particulate
Control
Mercury
Controls
Cooling
Tower
LaCygne 1
368(a)
 
 
 
 
 
 
LaCygne 2
341(a)
 
 
 
 
 
 
(a) KCP&L’s share of jointly-owned facility
(b) LaCygne 1 currently has a scrubber installed; however, 2011-13 capital expenditure plan includes the installation of a new scrubber on the unit
(c) Existing scrubber removes particulate matter; a baghouse is expected to be installed
(d) Existing precipitator will be replaced by a baghouse
ü Installed
(c)
(d)
 
 

 
18
June 2011 Investor Presentation
Plant Performance
 
 

 
19
June 2011 Investor Presentation
Recent EPA Ruling and Proposals
Industrial Boiler Maximum Achievable Control Technology (MACT) Rule
 EPA final rule issued in February 2011; effective date delayed pending appeal / reconsideration
 Applies to most of GMO’s Lake Road boilers and auxiliary boilers at other generating facilities
 Expected cost of compliance for this rule and the currently effective CAIR and BART is approximately $1 billion
Utility Boiler MACT Rule
 EPA proposed rule issued in March 2011; plans to issue final rule by November 2011
 Proposed rule will impact all KCP&L and GMO coal plants
 If final rule is as proposed:
  Potential retrofit of about 1,250 MW of baseload coal generation. Expected cost of compliance to be
 within the approximate $1 billion estimate referenced above
  Potential retirement of older units totaling about 535 MW
 Final rule is expected to change from the current form
Section 316(B) Rule - Water Intake Structures
 EPA proposed rule issued in March 2011; plans to issue final rule by July 2012
 Proposed rule applicable to most KCP&L and GMO coal units
 If cooling towers are ultimately required, projected compliance costs would likely be significant; however, this
 is not likely
 Current form of proposed rule by itself would not be expected to lead to retirements
 Final rule is likely to change from the current form
 
 

 
20
June 2011 Investor Presentation
* We believe drivers contributing to the decline may include a) switching to natural gas heat; b) conversion to more efficient heat pumps; c)
conservation among KCP&L KS customers on an all-electric rate triggered by a substantial rate increase for this rate class in KCP&L’s 2010
KS rate case; and d) continued challenges in the local economy.
** Weighted average
13%
746
38.5
2,300
Industrial
45%
2,589
182.3
96,400
Commercial
42%
2,437
$201.5
725,500
Residential
% of MWh Sales
Sales (000s of MWhs)
Revenue (in millions)
Customers
Statistics by Customer Class First Quarter 2011
Retail MWh Sales and Customer Growth Rates
1Q 2011 Compared to 1Q 2010
 
 
Weather-Normalized
 
Total
Change in
MWh Sales
Customers
Use / Customers
Change MWh Sales
Residential
(4.0%)
(0.1%)
(5.7%)
(5.8%)*
Commercial
(1.3%)
0.3%
(2.0%)
(1.7%)
Industrial
(0.0%)
(0.9%)
1.1%
0.1%
 
(2.2%)
0.0%**
(3.1%)**
(3.2%)**
Customer Consumption
 
 

 
21
June 2011 Investor Presentation
Financial Overview
 
 

 
22
June 2011 Investor Presentation
 Electric Utility’s net income decreased $17.9 million including an $8.4 million decrease in gross
 margin*
 Common stock outstanding for the quarter averaged 138.2 million shares, about 1 percent higher
 than the same period in 2010
*Gross margin is defined and reconciled to GAAP operating revenues at the end of the presentation
 
Earnings (in Millions)
 
Earnings per Share
 
2011
2010
 
2011
2010
Electric Utility
$ 7.0
$ 24.9
 
$ 0.05
$ 0.18
Other
(4.7)
(4.6)
 
(0.04)
(0.03)
 Net income
2.3
20.3
 
0.01
0.15
Less: Net loss attributable to noncontrolling interest
0.1
-
 
-
-
 Net income attributable to Great Plains Energy
2.4
20.3
 
0.01
0.15
Preferred dividends
(0.4)
(0.4)
 
-
-
 Earnings available for common shareholders
$ 2.0
$ 19.9
 
$ 0.01
$ 0.15
Great Plains Energy Consolidated Earnings
and Earnings Per Share - Three Months Ended March 31
(Unaudited)
 
 

 
23
June 2011 Investor Presentation
(in millions)
* Gross margin is defined and reconciled to GAAP operating
 revenues at the end of the presentation
Electric Utility First Quarter Results
Decreased gross margin* of $8.4 million due to a
$5.7 million reduction in retail revenue from
reduced customer consumption and $4.6 million
of increased coal transportation costs not
recovered in KCP&L Missouri retail rates where
there is no fuel recovery mechanism;
Decreased income tax expense of $10.7 million
resulting from lower pre-tax income;
Decreased non-operating income and expenses
of $9.8 million primarily due to lower AFUDC
equity
Increased other operating expenses of $12.4
million primarily driven by $6.9 million loss
attributed to Iatan 1 and 2 construction costs plus
other costs resulting from the Missouri rate case
orders and a $4.0 million increase in general taxes
principally related to property taxes at Iatan 2;
A $9.7 million expense for the voluntary
separation program; and
Decreased depreciation and amortization of $9.8
million primarily driven by a reduction of KCP&L’s
regulatory amortization in Kansas;
Key Earnings Drivers
 
 

 
24
June 2011 Investor Presentation
Great Plains Energy Debt
($ in millions)
KCP&L
GMO (1)
GPE
Consolidated
 
Amount
Rate (2)
Amount
Rate (2)
Amount
Rate (2)
Amount
Rate (2)
Short-term debt
$ 383.8
0.61%
$ 205.0
3.06%
$ 14.0
3.06%
$ 602.8
1.50%
Long-term debt (3)
1,780.1
6.13%
863.9
10.20%
637.0
7.57%
3,281.0
7.45%
Total
$2,163.9
5.15%
$1,068.9
8.78%
$ 651.0
7.47%
$3,883.8
6.51%
Secured debt = $861.5 (22%), Unsecured debt = $3,022.3 (78%)
(1) GPE guarantees substantially all of GMO’s debt
(2) Weighted Average Rates - excludes premium / discounts and fair market value adjustments; includes full Equity Units coupon (12%) for GPE
(3) Includes current maturities of long-term debt
Long-term Debt Maturities
Debt Profile as of March 31, 2011
 
 

 
25
June 2011 Investor Presentation
Moody's
Standard & Poor's
Great Plains Energy
Outlook
Stable
Stable
Corporate Credit Rating
-
BBB
Preferred Stock
Ba2
BB+
Senior Unsecured Debt
Baa3
BBB-
KCP&L
Outlook
Stable
Stable
Senior Secured Debt
A3
BBB+
Senior Unsecured Debt
Baa2
BBB
Commercial Paper
P-2
A-2
GMO
Outlook
Stable
Stable
Senior Unsecured Debt
Baa3
BBB
Current Credit Ratings
* All ratios calculated using Standard and Poor’s methodology
** Last twelve months as of March 31, 2011
Credit Profile for Great Plains Energy
 
 

 
26
June 2011 Investor Presentation
$614
$503
$699
 
 
 
 
Generating
Facilities (excl.
Iatan 2)
172.2
174.6
171.8
Transmission &
Distribution
171.0
178.9
232.2
General
Facilities
29.2
63.2
44.6
Nuclear Fuel
14.8
26.2
31.5
Environmental
63.0
171.0
219.1
Iatan No. 2
53.1
-
-
Capital Expenditures Forecast
 
 

 
27
June 2011 Investor Presentation
Rate Case Implications
 Full-year impact from new KS rates
 Missouri new rates effective early May 2011 (KCP&L) / June 2011 (GMO)
 Regulatory lag January - April from new rail contract for KCP&L in Missouri
 (no FAC)
 Iatan 2 depreciation effective with new rates will be lower due to lower
 depreciable plant from additional amortization granted during the CEP to
 maintain credit metrics
Construction Accounting - Missouri
 Missouri jurisdictional share of Iatan 2 carried as a regulatory asset until
 effective date of new rates in MO
  Carrying cost reduces interest expense
  Iatan-related O&M and property taxes deferred as regulatory asset until effective
 date of new rates
  Depreciation expense deferred as regulatory asset until effective date of new
 rates
  Iatan 2 system energy value recorded to regulatory asset as an offset to costs
 listed above
Considerations for 2011
 
 

 
28
June 2011 Investor Presentation
Interest Expense
 Interest expense impacted by carrying cost offset, new long-term debt issued in
 2010 and May 2011 and additional debt anticipated in 2011
Weather-Normalized MWh Sales
 Expectation is flat compared to 2010 weather-normalized level
O&M
 Projected to be consistent with levels requested in rate cases
Generation Fleet
 Projected EAF for combined fleet - 83%
 LaCygne outage for most of 1Q
 Wolf Creek refueling and expanded maintenance outage began in late 1Q and
 expected to end in June
Taxes
 Expect no cash taxes in 2011 as a result of bonus depreciation / NOL utilization
 Anticipate effective tax rate of approximately 34% based on normal conditions
Considerations for 2011 (continued)
 
 

 
29
June 2011 Investor Presentation
Considerations for 2011 (continued)
Other
 Expenses Associated with Voluntary Separation Program
  $0.04 EPS impact in 1Q
  $0.02 EPS impact to be recognized In 2Q
 Missouri Rate Case-Related Expenses
  $0.03 EPS impact in 1Q
  Currently assessing impacts of GMO order
 
 

 
30
June 2011 Investor Presentation
Looking Ahead / Conclusion
 
 

 
31
June 2011 Investor Presentation
 Regional economy poised to improve; impact of
 customer energy consumption still difficult to assess
 New rates in effect for approximately 6 months for
 GMO and 8 months for KCP&L Missouri in 2011
 Internal project underway to identify regulatory and
 operating strategies to reduce regulatory lag going
 forward
 Decisive management actions implemented in 2011
 to manage costs within levels reflected in rates,
 enhance organizational effectiveness and contribute
 to solid credit metrics
 Impact of new EPA rules
Looking Ahead
 
 

 
32
June 2011 Investor Presentation
Accomplishments in 2009 through 2011 YTD reflect and
support our strong commitment to credit quality:
 ü Reduced risk profile with completion of construction phase of CEP -
 Iatan 1 (2009) and Iatan 2 (2010);
 ü Achieved constructive 2009 settlements in Missouri and Kansas and
 excellent Iatan 1 and 2 prudency outcome in Kansas in 2010 and
 Missouri in 2011;
 ü Improved generation fleet operations significantly in 2009-10;
 ü Reduced dividend by 50% in 2009;
 ü In the face of challenging market conditions, raised $450 million of
 equity and hybrid capital in 2009 to support credit profile;
 ü Developed a prudent, disciplined 2011-13 capital expenditure view that
 satisfies mandatory requirements while targeting improved credit
 metrics even in an environment in which equity financing remains
 challenging; and
 ü Implemented in 2011 strong management actions to support sufficiently
 robust credit metrics in the midst of a still-challenging regional economy
Entire organization has had….and will maintain.…an intense focus
on credit.
Conclusion
 
 

 
33
June 2011 Investor Presentation
Great Plains Energy
Investor Presentation
June 2011
 
 

 
34
June 2011 Investor Presentation
Appendix
Gross Margin Reconciliation
 
 

 
35
June 2011 Investor Presentation
Gross margin is a financial measure that is not calculated in accordance with generally accepted accounting
principles (GAAP). Gross margin, as used by Great Plains Energy, is defined as operating revenues less fuel,
purchased power and transmission of electricity by others. The Company’s expense for fuel, purchased
power and transmission of electricity by others, offset by wholesale sales margin, is subject to recovery
through cost adjustment mechanisms, except for KCP&L’s Missouri retail operations. As a result, operating
revenues increase or decrease in relation to a significant portion of these expenses. Management believes
that gross margin provides a more meaningful basis for evaluating the Electric Utility segment’s operations
across periods than operating revenues because gross margin excludes the revenue effect of fluctuations in
these expenses. Gross margin is used internally to measure performance against budget and in reports for
management and the Board of Directors. The Company’s definition of gross margin may differ from similar
terms used by other companies. A reconciliation to GAAP operating revenues is provided in the table above.
(millions)
Three Months Ended March 31
 
2011
2010
Operating revenues
$ 492.9
$ 506.9
Fuel
(104.9)
(101.8)
Purchase power
(54.9)
(65.5)
Transmission of electricity by others
(7.5)
(5.6)
 Gross margin
$ 325.6
$ 334.0
Great Plains Energy Incorporated Reconciliation of
Gross Margin to Operating Revenues
(Unaudited)