FOR IMMEDIATE RELEASE
 
NextEra Energy announces first quarter earnings for 2011
 
·  
Florida Power & Light Company earnings driven by increased investment
·  
NextEra Energy Resources signs an additional 400 megawatts of wind energy contracts

JUNO BEACH, Fla. – NextEra Energy, Inc. (NYSE: NEE) today reported 2011 first quarter net income on a GAAP basis of $268 million, or $0.64 per share, compared with $556 million, or $1.36 per share, in the first quarter of 2010. On an adjusted basis, NextEra Energy’s earnings were $392 million, or $0.94 per share, compared with $386 million, or $0.94 per share, in the first quarter of 2010. Adjusted earnings exclude the mark-to-market effects of non-qualifying hedges and the net effect of other than temporary impairments (OTTI) on certain investments, both of which relate to the business of NextEra Energy Resources, LLC and its affiliated entities.

NextEra Energy management uses adjusted earnings, which is a non-GAAP financial measure, internally for financial planning, for analysis of performance, for reporting of results to the Board of Directors and as an input in determining whether certain performance goals are met for performance-based compensation under the company’s employee incentive compensation plans. NextEra Energy also uses earnings expressed in this fashion when communicating its financial results and earnings outlook to analysts and investors. NextEra Energy management believes that adjusted earnings provide a more meaningful representation of NextEra Energy’s fundamental earnings power. The attachments to this news release include a reconciliation of historical adjusted earnings to net income, which is the most directly comparable GAAP measure.

“NextEra Energy delivered solid results in the first quarter of 2011. At Florida Power & Light, net income was up more than 7 percent over the prior-year comparable quarter, primarily due to increased investment in the business. Those investments have allowed FPL to provide its customers with 99.98 percent service reliability and to significantly improve the efficiency of its power generation fleet, saving customers hundreds of millions of dollars in fuel costs and providing low bills for residential and business customers alike. At NextEra Energy Resources, we signed power purchase agreements for an additional 400 megawatts of wind capacity. In addition, we are very encouraged that California adopted a robust renewable portfolio standard; we look forward to doing additional business in the state,” said NextEra Energy Chairman and CEO Lew Hay.

 
1

 

Florida Power & Light Company
NextEra Energy’s principal rate-regulated utility subsidiary, Florida Power & Light Company, reported first quarter net income of $205 million, or $0.49 per share, compared with $191 million, or $0.47 per share, for the prior-year quarter.

During the first quarter, FPL's earnings per share (EPS) increased $0.02 over the prior-year's comparable quarter, driven primarily by Allowance for Funds Used During Construction (AFUDC) for West County Energy Center Unit 3, returns on clause-related investments including the Martin Next Generation Solar Energy Center and extended power uprates to the company’s existing nuclear units, and rate base growth, partially offset by share dilution. The company’s customer count was up by approximately 30,000 compared to the prior-year quarter. FPL’s customer base has now grown for five year-over-year comparable quarters in a row after previously declining for five quarters in a row.

During the quarter, FPL neared completion of West County Energy Center Unit 3, which will add 1,220 megawatts (MW) of generation in the state. In addition, site work is continuing on the $2.4 billion modernizations of the Cape Canaveral and Riviera Beach facilities, which together will add 2,420 MW of generation when completed in 2013 and 2014, respectively. All three gas-fueled units are expected to reduce air emissions while providing fuel savings to customers.

In March, the company dedicated the Martin Next Generation Solar Energy Center, the world’s first large-scale hybrid solar plant. The facility integrates a 75-MW solar thermal array with an existing combined-cycle natural gas unit. Over its life, the project is expected to save approximately 600,000 barrels of oil and 41 billion cubic feet of natural gas, diversifying Florida’s energy supply.

NextEra Energy Resources
NextEra Energy Resources, the competitive energy business of NextEra Energy with generating facilities in 26 states and Canada, reported first quarter net income on a GAAP basis of $65 million, or $0.16 per share, compared with $367 million, or $0.89 per share, in the prior-year quarter. On an adjusted basis, NextEra Energy Resources’ earnings were $189 million, or $0.46 per share, compared with $196 million, or $0.47 per share, in the first quarter of 2010.

In the first quarter of 2011, NextEra Energy Resources’ new assets were roughly flat compared to the year-ago quarter, with contributions from the addition of 754 MW of wind capacity during 2010 offset by lower convertible investment tax credit elections in the current-year quarter.

Existing assets added $0.10 of adjusted EPS from the year-ago period. The company’s existing wind assets added $0.17 in adjusted EPS, due largely to higher production and benefits from state tax credits. The wind fleet produced roughly 960,000 additional megawatt hours of electricity, driven primarily by a stronger wind resource. In ISO New England, earnings declined $0.06 in adjusted EPS, primarily due to lower prices for the power output of the Seabrook nuclear station. In ERCOT, weaker market conditions negatively impacted earnings from the company’s natural gas assets, which declined by $0.02 in adjusted EPS from a year ago.

During the quarter, NextEra Energy Resources completed a review of the estimated useful life of the newer wind turbines in the company’s portfolio as of Jan. 1, 2011. Over time, the technology employed in NextEra Energy Resources’ turbines has improved, and based on its actual experience the company now believes that with proper maintenance its fleet will last longer than previously estimated. As a result, the company has extended the estimated useful life for its newer wind turbine fleet to 30 years. For the assets already in service, the after-tax impact of the change in assumption for the first quarter was roughly 2.5 cents in adjusted EPS. For full-year 2011, the impact is expected to be roughly 10.5 cents in adjusted EPS.

 
2

 


NextEra Energy Resources’ customer supply business and proprietary power and gas trading earnings declined by $0.07 in adjusted EPS during the quarter. The earnings comparison for the wholesale full requirements business was negatively impacted by customer migration and by the absence of a prior-year gain on a large wholesale contract sale.

Asset sales declined $0.03 in adjusted EPS during the quarter due to the absence of gains recorded in the prior year’s comparable quarter on the sale of the company’s interest in a 27-MW waste-to-energy facility. All other factors contributed a negative $0.01 associated with higher interest expense due to higher borrowings and higher corporate general and administrative expenses, both from growth of the business.

So far in 2011, NextEra Energy Resources has signed power purchase agreements for the output of 400 MW of wind generation. Since the start of last year, the company has signed power purchase agreements for 1,638 MW of wind generation. NextEra Energy Resources expects to add 1,400-2,000 MW to its wind portfolio during 2011 and 2012 combined.

Shortly after the close of the first quarter 2011, NextEra Energy Resources secured lines of credit for the construction of two 49.9-MW solar thermal arrays in Extremadura, Spain. These solar energy projects are expected to commence production in 2013.

Outlook
NextEra Energy believes that as a result of the change in the assumption regarding the estimated useful life for a portion of the company’s wind fleet, adjusted earnings per share for 2011 will be in the range of $4.35 to $4.65 from the previous range of $4.25 to $4.55, which is an increase of $0.10 as a result of the depreciation life change. The company expects that adjusted earnings per share will grow at an overall average rate of 5 percent to 7 percent through 2014 from a 2011 base.

NextEra Energy’s adjusted earnings expectations exclude the cumulative effect of adopting new accounting standards, the unrealized mark-to-market effect of non-qualifying hedges and net other than temporary impairment losses on securities held in NextEra Energy Resources’ nuclear decommissioning funds, none of which can be determined at this time. In addition, NextEra Energy’s adjusted earnings expectations assume, among other things: normal weather and operating conditions; no further significant decline in the national or the Florida economy; supportive commodity markets; public policy support for wind and solar development and construction; market demand and supply chain expansion for wind and solar; transmission expansion to support wind and solar development; access to capital at reasonable cost and terms; and no acquisitions or divestitures. Please see the accompanying cautionary statements for a list of the risk factors that may affect future results.

 
3

 

As previously announced, NextEra Energy’s first quarter earnings conference call is scheduled for 9 a.m. ET on April 29, 2011. The webcast is available on NextEra Energy’s website by accessing the following link, www.NextEraEnergy.com/investors/index.shtml. The slides and earnings release accompanying the presentation may be downloaded at www.NextEraEnergy.com beginning at 7:30 a.m. ET today. For those unable to listen to the live webcast, a replay will be available for 90 days by accessing the same link as listed above.
 
This news release should be read in conjunction with the attached unaudited financial information.

NextEra Energy, Inc.
NextEra Energy, Inc. is a leading clean energy company with 2010 revenues of more than $15 billion, nearly 43,000 megawatts of generating capacity, and approximately 15,000 employees in 28 states and Canada. Headquartered in Juno Beach, Fla., NextEra Energy’s principal subsidiaries are NextEra Energy Resources, LLC, which together with its affiliated entities is the largest generator in North America of renewable energy from the wind and sun, and Florida Power & Light Company, which serves approximately 4.5 million customer accounts in Florida and is one of the largest rate-regulated electric utilities in the country. Through its subsidiaries, NextEra Energy collectively operates the third largest U.S. nuclear power generation fleet. For more information about NextEra Energy companies, visit these websites: www.NextEraEnergy.com, www.NextEraEnergyResources.com, www.FPL.com.
###
Cautionary Statements And Risk Factors That May Affect Future Results

In connection with the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 (Reform Act), NextEra Energy, Inc. (NextEra Energy) and Florida Power & Light Company (FPL) are hereby providing cautionary statements identifying important factors that could cause NextEra Energy's or FPL's actual results to differ materially from those projected in forward-looking statements (as such term is defined in the Reform Act) made by or on behalf of NextEra Energy and FPL in this news release, on their respective websites, in response to questions or otherwise.  Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives, assumptions, strategies, future events or performance (often, but not always, through the use of words or phrases such as will, will likely result, are expected to, will continue, is anticipated, aim, believe, could, should, would, estimated, may, plan, potential, projection, goals, target, outlook, predict and intend or words of similar meaning) are not statements of historical facts and may be forward-looking.  Forward-looking statements involve estimates, assumptions and uncertainties.  Accordingly, any such statements are qualified in their entirety by reference to, and are accompanied by, the following important factors (in addition to any assumptions and other factors referred to specifically in connection with such forward-looking statements) that could have a significant impact on NextEra Energy's and/or FPL's operations and financial results, and could cause NextEra Energy's and/or FPL's actual results to differ materially from those contained or implied in forward-looking statements made by or on behalf of NextEra Energy and/or FPL.

Any forward-looking statement speaks only as of the date on which such statement is made, and NextEra Energy and FPL undertake no obligation to update any forward-looking statement to reflect events or circumstances, including unanticipated events, after the date on which such statement is made, unless otherwise required by law.  New factors emerge from time to time and it is not possible for management to predict all of such factors, nor can it assess the impact of each such factor on the business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained or implied in any forward-looking statement.

 
4

 

The business, financial results, financial condition and prospects of NextEra Energy and FPL are subject to a variety of significant risks, many of which are beyond their control.  The following is a description of some of the important risk factors that may adversely affect the business and may cause the actual results of NextEra Energy and FPL in future periods to differ substantially from those that NextEra Energy or FPL currently expects or seeks.  Many of the risks set forth below may only apply to a portion of the businesses of subsidiaries of NextEra Energy, such as its FPL business, its wind or solar generation development businesses, its transmission business or its gas infrastructure business.  Accordingly, references to “NextEra Energy” below in some instances refer to the applicable businesses or subsidiaries of NextEra Energy.  Risks specifically applicable to FPL generally include a reference to “FPL.”

NextEra Energy’s and FPL’s financial results may be adversely affected by the extensive regulation of their businesses.

·  
The operations of NextEra Energy and FPL are subject to complex and comprehensive federal, state and other regulation.  This extensive regulatory framework, some but not all of which is more specifically identified in the following risk factors, regulates, among other things, NextEra Energy's and FPL's industry, rate and cost structure, operation of nuclear power facilities, construction and operation of generation, transmission and distribution facilities, acquisition, disposal, depreciation and amortization of assets and facilities, decommissioning costs, transmission reliability, wholesale and retail competition, and commodities trading and derivatives transactions.  In their business planning and in the management of their operations, NextEra Energy and FPL must address the effects of regulation on their businesses and proposed changes in the regulatory framework.  Significant changes in the nature of the regulation of NextEra Energy’s and FPL’s businesses could require changes to their business planning and management of their businesses and could adversely affect their financial results, including, but not limited to, the value of their assets.  NextEra Energy and FPL must periodically apply for licenses and permits from various local, state, federal and other regulatory authorities and abide by their respective conditions.  Should NextEra Energy or FPL be unsuccessful in obtaining necessary licenses or permits on acceptable terms, should there be a delay in obtaining or renewing necessary licenses or permits or should regulatory authorities initiate any investigations or enforcement actions or impose penalties or disallowances on NextEra Energy or FPL, NextEra Energy’s and FPL’s businesses could be adversely affected.

NextEra Energy’s and FPL’s financial results could be negatively affected if they or their rate-regulated businesses are unable to recover, in a timely manner, certain costs, a return on certain assets or an appropriate return on capital from customers through regulated rates and, in the case of FPL, cost recovery clauses.

·  
FPL is a regulated entity subject to the jurisdiction of the Florida Public Service Commission (FPSC) over a wide range of business activities, including, among other items, the retail rates charged to its customers, the terms and conditions of its services, procurement of electricity for its customers, issuance of securities, transfers of some utility assets and facilities to affiliates, and aspects of the siting and operation of its generating plants and transmission and distribution systems for the sale of electric energy.  Lone Star Transmission, LLC (Lone Star), which is a wholly owned subsidiary of NextEra Energy, is a regulated entity subject to the jurisdiction of the Public Utility Commission of Texas (PUCT) over a wide range of business activities.  The FPSC and PUCT have the authority to disallow recovery by FPL and Lone Star, respectively, of costs that it considers excessive or imprudently incurred.  The regulatory process, which may be adversely affected by the political, regulatory and economic environment in Florida, Texas and elsewhere, can restrict NextEra Energy’s and FPL’s ability to grow earnings and does not provide any assurance as to achievement of authorized or other earnings levels.  NextEra Energy’s and FPL’s financial results could be materially adversely affected if any material amount of costs, a return on certain assets or an appropriate return on capital cannot be recovered through base rates, cost recovery clauses or other regulatory mechanisms.

 
5

 

·  
Decisions of the FPSC and the PUCT have been and, in the future, may be adversely affected by the local and national political, regulatory and economic environment and may adversely affect the financial results of NextEra Energy and FPL.  These decisions may require, for example, NextEra Energy or FPL to cancel or delay planned development activities and to reduce or delay other planned capital expenditures which could reduce the earnings potential of NextEra Energy and FPL.

NextEra Energy and FPL are subject to federal regulatory compliance and proceedings which have significant compliance costs and expose them to substantial monetary penalties and other sanctions.

·  
In addition to the regulatory risks that may affect NextEra Energy and FPL described above, the extensive federal regulation of the operations of NextEra Energy and FPL exposes the companies to significant and increasing compliance costs.  NextEra Energy and FPL also are subject to costs and other potentially adverse effects of regulatory investigations, proceedings, settlements, decisions and claims, including, among other items, potentially significant monetary penalties for non-compliance.  As an example, under the Energy Policy Act of 2005, NextEra Energy and FPL, as owners and operators of bulk power transmission systems and/or electric generation facilities, are subject to mandatory reliability standards.  Compliance with these mandatory reliability standards may subject NextEra Energy and FPL to higher operating costs and may result in increased capital expenditures.  If FPL or NextEra Energy is found not to be in compliance with these standards, it may incur substantial monetary penalties and other sanctions.

NextEra Energy and FPL may be adversely affected by increased governmental and regulatory scrutiny or negative publicity.

·  
From time to time, political and public sentiment may result in a significant amount of adverse press coverage and other adverse public statements affecting NextEra Energy and FPL.  Adverse press coverage and other adverse statements may result in investigations by regulators, legislators and law enforcement officials or in lawsuits.  Responding to these investigations and lawsuits, regardless of the ultimate outcome of the proceeding, can divert the time and effort of senior management from NextEra Energy’s and FPL’s businesses.  Addressing any adverse publicity, governmental scrutiny or enforcement or other legal proceedings is time consuming and expensive and, regardless of the factual basis for the assertions being made, can also have a negative impact on the reputation of NextEra Energy and FPL and on the morale and performance of their employees, which could adversely affect their financial results.

NextEra Energy’s and FPL’s businesses are subject to risks associated with legislative and regulatory initiatives.

·  
NextEra Energy and FPL operate in a changing market environment influenced by various legislative and regulatory initiatives, including, for example, initiatives regarding regulation, deregulation or restructuring of the energy industry and regulation of the commodities trading and derivatives markets.  NextEra Energy and its subsidiaries will need to adapt to any changes and may face increasing costs and competitive pressures in doing so.  NextEra Energy produces the majority of its electricity from clean and renewable fuels, such as nuclear, natural gas and wind, operates in the competitive segment of the electric industry, has targeted the competitive segments of the electric industry for some of its future growth and relies on the efficient operation of the commodities trading and derivatives markets.  NextEra Energy’s financial results and growth prospects could be adversely affected as a result of new, or changes in, laws, regulations or interpretations, or other regulatory initiatives, including, but not limited to, those that reverse or restrict the competitive restructuring of the energy industry or the effective operation of the commodities trading or derivatives markets.

NextEra Energy and FPL are subject to numerous environmental laws and regulations that require capital expenditures, increase their cost of operations and may expose them to liabilities.

 
6

 

·  
NextEra Energy and FPL are subject to domestic and foreign environmental laws and regulations, including, but not limited to, extensive federal, state, and local environmental statutes, rules and regulations relating to air quality, water quality and usage, climate change, greenhouse gas (GHG), including, but not limited to, carbon dioxide (CO2) emissions, waste management, hazardous wastes, marine, avian and other wildlife mortality and habitat protection, natural resources, health, safety and renewable portfolio standards (RPS) that could, among other things, prevent or delay the development of power generation, power or natural gas transmission, or other infrastructure projects, restrict the output of some existing facilities, limit the use of some fuels required for the production of electricity, require additional pollution control equipment, and otherwise increase costs or limit or eliminate certain operations.  There are significant capital, operating and other costs associated with compliance with these environmental statutes, rules and regulations, and those costs could be even more significant in the future as a result of new legislation, the current trend toward more stringent standards, and stricter and more expansive application of existing environmental regulations.  For example, among other potential or pending changes described elsewhere in this report, the process of hydraulic fracturing or similar technologies to drill for natural gas and related compounds used by NextEra Energy's gas infrastructure business are currently being debated for potential regulation at the state and federal levels.  Violations of current or future laws, rules and regulations could expose NextEra Energy and FPL to regulatory proceedings, disputes with, and legal challenges by, third parties, and potentially significant civil fines, criminal penalties and other sanctions.

NextEra Energy’s and FPL’s businesses could be negatively affected by federal or state laws or regulations mandating new or additional limits on the production of GHG emissions.

·  
Federal or state laws or regulations may be adopted that would impose new or additional limits on GHG, including, but not limited to, CO2 and methane, from electric generating units storing and combusting fossil fuels like coal and natural gas.  The potential effects of such GHG emission limits on NextEra Energy’s and FPL’s electric generating units are subject to significant uncertainties based on, among other things, the timing of the implementation of any new requirements, the required levels of emission reductions, the nature of any market-based or tax-based mechanisms adopted to facilitate reductions, the relative availability of GHG emission reduction offsets, the development of cost effective, commercial-scale carbon capture and storage technology and supporting regulations and liability mitigation measures, and the range of available compliance alternatives.  While NextEra Energy’s and FPL’s electric generating units emit GHGs at a lower rate of emissions than most of the U.S. electric generation sector, the financial results of NextEra Energy and FPL could be adversely affected to the extent that any new GHG emission limits, among other potential impacts:

·  
create substantial additional costs in the form of taxes or emission allowances;

·  
make some of NextEra Energy’s and FPL’s electric generating units uneconomical to operate in the long term;

·  
require significant capital investment in carbon capture and storage technology, fuel switching, or the replacement of high-emitting generation facilities with lower-emitting generation facilities; or

·  
affect the availability or cost of fossil fuels.

The construction, operation and maintenance of nuclear generation facilities involve risks that could result in fines or the closure of nuclear generation facilities owned by NextEra Energy or FPL and in increased costs and capital expenditures.

·  
Together, FPL and NextEra Energy’s other subsidiaries own, or hold undivided interests in, eight nuclear generation units in four states.  The construction, operation and maintenance of the facilities involve inherent risks, including, but not limited to, the following:

 
7

 

·  
The nuclear generation facilities are subject to environmental, health and financial risks, such as risks relating to site storage of spent nuclear fuel, the disposition of spent nuclear fuel, leakage and emissions of tritium and other radioactive elements in the event of a nuclear accident or otherwise, the threat of a terrorist attack and other potential liabilities arising out of the ownership or operation of the facilities.  Although NextEra Energy and FPL maintain decommissioning funds and external insurance coverage which are intended to reduce the financial exposure to some of these risks, the cost of decommissioning the facilities could exceed the amount available in the decommissioning funds, and the liability and property damages could exceed the amount of insurance coverage.  In the event of an incident at any nuclear generation facility in the United States, NextEra Energy and FPL could be assessed significant retrospective assessments and/or retrospective insurance premiums as a result of their participation in a secondary financial protection system and nuclear insurance mutual companies.

·  
The U.S. Nuclear Regulatory Commission (NRC) has broad authority to impose licensing and safety-related requirements for the construction of nuclear generation facilities, the addition of capacity at existing nuclear generation facilities, and the operation and maintenance of nuclear generation facilities, and such requirements are subject to change.  In the event of non-compliance, the NRC has the authority to impose fines or shut down a nuclear generation facility, or to take both of these actions, depending upon its assessment of the severity of the situation, until compliance is achieved.  NRC orders or new regulations related to increased security measures and any future safety requirements promulgated by the NRC could require NextEra Energy and FPL to incur substantial operating and capital expenditures at their nuclear generation facilities.  In addition, any serious nuclear incident occurring at a NextEra Energy or FPL plant could result in substantial remediation costs and other expenses.  A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear generation facility.  An incident at a nuclear facility anywhere in the world also could cause the NRC to impose additional conditions or other requirements on the industry, which could increase costs and result in additional capital expenditures.

·  
The operating licenses for NextEra Energy’s and FPL’s nuclear generation facilities extend through at least 2030.  If any of NextEra Energy’s or FPL’s nuclear generation units cannot be operated through the end of their respective operating licenses, NextEra Energy or FPL may be required to increase depreciation rates, incur impairment charges and accelerate future decommissioning expenditures, which could adversely affect their financial results.

·  
Terrorist threats and increased public scrutiny of nuclear generation facilities could result in increased nuclear licensing or compliance costs which are difficult or impossible to predict.

NextEra Energy’s and FPL’s operating results could suffer if they do not proceed with projects under development or are unable to complete the construction of, or capital improvements to, generation, transmission, distribution or other facilities on schedule or within budget.

·  
NextEra Energy and FPL may incur significant costs for development of projects, including, but not limited to, preliminary engineering, permitting, legal and other expenses before it can be established whether a project is feasible, economically attractive, capable of being financed or, in some cases, approved for regulatory recoveries.  The ability of NextEra Energy and FPL to complete construction of, and capital improvement projects for, their generation, transmission, distribution, gas infrastructure and other facilities on schedule and within budget may be adversely affected by escalating costs for materials and labor and regulatory compliance, inability to obtain or renew necessary licenses, rights-of-way, permits or other approvals on acceptable terms, delays in obtaining or renewing necessary licenses, permits, rights-of-way and other approvals, disputes involving contractors, labor organizations, land owners and other third parties, negative publicity, transmission interconnection issues and other factors or failures.  If any development project or construction or capital improvement project is not completed or is delayed or subject to cost overruns, NextEra Energy's and FPL's operational and financial results may be adversely affected.  In any such event, among other matters, NextEra Energy and FPL could be subject to additional costs, which, in some cases, may not be approved for or recoverable through regulatory mechanisms, and could result in delay or termination payments and other damages under committed contracts, loss of tax credits and the write-off of their investment in the project.

 
8

 

The operation and maintenance of power generation, transmission and distribution facilities involve significant risks that could adversely affect the financial results of NextEra Energy and FPL.

·  
The operation and maintenance of power generation, transmission and distribution facilities involve many risks, such as those identified elsewhere in these risk factors and those arising due to:
 
·  
risks of start-up operations;

·  
failures in the supply, availability or transportation of fuel;

·  
the impact of unusual or adverse weather conditions, including, but not limited to, natural disasters such as hurricanes, floods, earthquakes and droughts;

·  
performance below expected or contracted levels of output or efficiency;

·  
breakdown or failure of equipment, transmission and distribution lines or pipelines;

·  
availability of replacement equipment;

·  
risks of human injury from energized equipment;

·  
availability of adequate water resources and ability to satisfy water discharge requirements;

·  
inability to properly manage or mitigate known equipment defects throughout NextEra Energy’s and FPL’s generation fleets and transmission and distribution systems;

·  
use of new or unproven technology; and

·  
dependence on a specific fuel source.

The occurrence of any of these effects or events could result in, among other matters, lost revenues due to prolonged outages, increased expenses due to monetary penalties or fines, replacement equipment costs or an obligation to purchase or generate replacement power at potentially higher prices to meet contractual obligations.  Insurance, warranties or performance guarantees may not cover any or all of the lost revenues or increased expenses.  Breakdown or failure of an operating facility of NextEra Energy, for example, may prevent NextEra Energy from performing under applicable power sales agreements which, in some situations, could result in termination of the agreement or subject NextEra Energy to liability for liquidated damages.  The operation and maintenance of NextEra Energy’s gas infrastructure and power transmission businesses also are subject to many of the foregoing risks or substantially similar risks.

NextEra Energy’s competitive energy business is subject to development and operating risks that could limit the revenue growth of this business and have other negative effects on NextEra Energy’s financial results.

·  
To operate successfully in the competitive wholesale energy markets, NextEra Energy must, among other things, efficiently develop and operate its generating assets, procure adequate supplies of fuel and associated transportation at acceptable prices, successfully and timely complete project restructuring activities, maintain the qualifying facility status of certain projects and complete its energy deliveries in a timely manner.  Its ability to do so is subject to a variety of risks.  In addition to risks such as those identified elsewhere in these risk factors, risks that specifically affect NextEra Energy’s success in competitive wholesale markets and in the gas infrastructure business include:

·  
NextEra Energy may face increased competition, including, but not limited to, from other and new sources of power generation, excess generation capacity and shifting demand for power, legal and regulatory developments and general economic conditions.  Risks related to project siting, financing, construction, permitting, governmental approvals and the negotiation of project agreements may impede development activities.

 
9

 

·  
There can be significant volatility in market prices for fuel, electricity and renewable and other energy commodities.  NextEra Energy’s inability or failure to hedge effectively its assets or positions against changes in commodity prices, volumes, interest rates, counterparty credit risk or other risk measures could significantly impair NextEra Energy’s financial results.

·  
A portion of NextEra Energy’s power generation facilities operate wholly or partially without long-term power purchase agreements.  As a result, power from these facilities is sold on the spot market or on a short term contractual basis, which may increase the volatility of NextEra Energy’s financial results.

·  
NextEra Energy depends upon power transmission and natural gas transportation facilities owned and operated by others.  If transmission or transportation of sufficient power or natural gas is unavailable or disrupted, NextEra Energy’s ability to sell and deliver its wholesale power or natural gas may be limited.

NextEra Energy’s competitive energy business is dependent on continued public policy support and governmental support for renewable energy, particularly wind and solar projects.

·  
NextEra Energy’s competitive energy business, NextEra Energy Resources, LLC (NextEra Energy Resources), depends heavily on government policies that support renewable energy and enhance the economic feasibility of developing wind and solar energy projects.  The federal government, a majority of the 50 U.S. states and portions of Canada and Spain provide incentives, such as tax incentives, RPS or feed-in tariffs, that support the sale of energy from renewable sources, such as wind and solar energy.  The applicable legislation often grants the relevant state public utility commission the ability to reduce electric supply companies’ obligations to meet the requirements in specified circumstances.  Any reduction or elimination of existing supportive policies, including, but not limited to, RPS or feed-in tariffs, and ultimately any failure to renew or increase existing supportive policies, could result in less demand for generation from NextEra Energy’s wind and solar energy projects.

·  
The American Recovery and Reinvestment Act of 2009, as amended, includes, among other things, provisions that allow companies building wind facilities the option to choose among the following three investment cost recovery mechanisms: (1) production tax credits which were extended for wind facilities placed in service prior to 2013, (2) investment tax credits (ITCs) of 30% of the cost for qualifying wind facilities placed in service prior to 2013, or (3) an election to receive a cash grant of 30% of the cost of qualifying wind facilities placed in service in 2009, 2010 or 2011, or if construction began prior to December 31, 2011 and the wind facility is placed in service prior to 2013.  An election to receive a cash grant of 30% in lieu of the 30% ITC also applies to the cost of qualifying solar facilities placed in service in either 2009, 2010 or 2011, or if construction began prior to December 31, 2011 and the solar facility is placed in service prior to 2017.  In order for NextEra Energy to continue to economically develop wind and solar energy projects in the future, it will need to utilize the investment cost recovery mechanisms currently available as well as requiring similar public policy support in the future.

NextEra Energy and FPL are subject to credit and performance risk from customers, counterparties and vendors.

·  
NextEra Energy and FPL are exposed to risks associated with the creditworthiness and performance of their customers, hedging counterparties and vendors under contracts for the supply of equipment, materials, fuel and other goods and services required for their business operations and for the construction and operation of, and for capital improvements to, their facilities.  Adverse conditions in the energy industry or the general economy, as well as circumstances of individual customers, counterparties and vendors, may affect the ability of some customers, counterparties and vendors to perform as required under their contracts.  If any counterparty or vendor fails to fulfill its contractual obligations, NextEra Energy and FPL may need to make arrangements with other counterparties or vendors, which could result in higher costs, untimely completion of power generation facilities and other projects, and/or a disruption of their operations.  If a defaulting counterparty is in poor financial condition, NextEra Energy and FPL may not be able to recover damages for any contract breach.

 
10

 

NextEra Energy’s and FPL’s financial results may continue to be negatively affected by slower customer growth and customer usage.

·  
NextEra Energy’s and FPL’s results of operations are affected by the growth in customer accounts and by customer usage, each of which directly influences the demand for electricity and the need for additional power generation and power delivery facilities.  A lack of growth or slower growth in the number of retail customers or in non weather related customer usage, such as that which has occurred over the past several years, could adversely affect NextEra Energy’s and FPL’s results of operations.  Customer growth and customer usage are affected by a number of factors outside the control of NextEra Energy and FPL, such as mandated energy efficiency measures, demand side management goals, and economic and demographic conditions, such as population, job and income growth, housing starts and new business formation.  NextEra Energy’s and FPL’s financial results may also be adversely affected by FPL’s ability to negotiate or renegotiate franchise agreements on acceptable terms with municipalities and counties in Florida.  As a result, NextEra Energy and FPL may make, but not fully realize the anticipated benefits from, significant investments and expenditures, which could adversely affect their financial results.

NextEra Energy’s and FPL’s financial results are subject to risks associated with weather conditions, such as the impact of severe weather.

·  
NextEra Energy’s and FPL’s financial results can be negatively affected by changes in the weather.  Weather conditions directly influence the demand for electricity and natural gas, affect the price of energy and energy-related commodities, and can affect the production of electricity at power generating facilities, including, but not limited to, wind, solar and hydro-powered facilities.  For example, the level of wind resource affects the results of operations of wind generating facilities.  Since the levels of wind, solar and hydro resources are variable and difficult to predict, NextEra Energy’s results of operations for individual wind, solar and hydro facilities vary or may vary significantly from period to period depending on the level of available resources.  To the extent that resources are not available at planned levels, the returns from these facilities may be less than expected.

·  
In addition, NextEra Energy’s and FPL’s financial results would be affected by the impact of severe weather, such as hurricanes, floods and earthquakes, which can be destructive and cause power outages and property damage, reduce revenue, affect fuel supply, and require NextEra Energy and FPL to incur additional costs to restore service and repair damaged facilities.  As a company that provides electric service throughout most of the east and lower west coasts of Florida, FPL operates in an area that historically has been more prone to severe weather events, such as hurricanes.  A disruption or failure of electric generation, transmission or distribution systems or natural gas production, transmission, storage or distribution systems in the event of a hurricane, tornado, or other severe weather event, or otherwise, could prevent NextEra Energy and FPL from operating their businesses in the normal course and could result in any of the adverse consequences described above.  At FPL and other regulated businesses of NextEra Energy, recovery of costs to restore service and repair damaged facilities is or may be subject to regulatory approval, and any determination by the regulator not to permit timely and full recovery of the costs incurred would result in a negative financial impact on NextEra Energy and FPL.

Disruptions, uncertainty or volatility in the credit and capital markets may negatively affect NextEra Energy’s and FPL’s ability to fund their liquidity and capital needs and to meet their growth objectives, and can also adversely affect the results of operations and financial condition of NextEra Energy and FPL and exert downward pressure on the market price of NextEra Energy’s common stock.

 
11

 

·  
NextEra Energy and FPL rely on access to capital and credit markets as significant sources of liquidity for capital requirements and other operations requirements that are not satisfied by operating cash flows.  Disruptions, uncertainty or volatility in those capital and credit markets, such as conditions that have existed in the recent past, could increase NextEra Energy’s and FPL’s cost of capital.  If NextEra Energy or FPL is unable to access regularly the capital and credit markets on terms that are reasonable, it may have to delay raising capital, issue shorter-term securities and incur an unfavorable cost of capital, which, in turn, could adversely affect its ability to grow its businesses and could contribute to lower earnings and reduced financial flexibility.  The market price and trading volume of NextEra Energy’s common stock are subject to fluctuations as a result of, among other factors, general stock market conditions and changes in market sentiment regarding the operations, business, growth prospects and financing strategies of NextEra Energy and its subsidiaries.

·  
Although NextEra Energy’s competitive energy subsidiaries have used non-recourse or limited-recourse, project-specific financing in the past, market conditions and other factors could adversely affect the future availability of such financing.  The inability of NextEra Energy’s subsidiaries to access the capital and credit markets to provide project-specific financing for electric-generating and other energy facilities on favorable terms, whether because of disruptions or volatility in those markets or otherwise, could necessitate additional capital raising or borrowings by NextEra Energy and/or NextEra Energy Capital Holdings, Inc. (Capital Holdings) in the future.

·  
The inability of subsidiaries that have existing project-specific financing arrangements to meet the requirements of various agreements relating to those financings could give rise to a project-specific financing default which, if not cured or waived, might result in the specific project, and potentially in some limited instances its parent companies, being required to repay the associated debt or other borrowings earlier than otherwise anticipated, and if such repayment were not made, the lenders or security holders would generally have rights to foreclose against the project assets and related collateral, any of which actions could negatively affect NextEra Energy’s financial results, as well as the availability or terms of future financings for NextEra Energy or its subsidiaries.

NextEra Energy’s, Capital Holdings’ and FPL’s inability to maintain their current credit ratings may adversely affect NextEra Energy’s and FPL’s liquidity, limit the ability of NextEra Energy and FPL to grow their businesses, and increase interest costs, while the liquidity of the companies also could be impaired by the inability of their credit providers to maintain their current credit ratings or to fund their credit commitments.

·  
The inability of NextEra Energy, Capital Holdings and FPL to maintain their current credit ratings could adversely affect their ability to raise capital or obtain credit on favorable terms, which, in turn, could impact NextEra Energy’s and FPL’s ability to grow their businesses and service indebtedness and repay borrowings, and would likely increase their interest costs.  Some of the factors that can affect credit ratings are cash flows, liquidity, the amount of debt as a component of total capitalization, and political, legislative and regulatory actions.  There can be no assurance that one or more of the ratings of NextEra Energy, Capital Holdings and FPL will not be lowered or withdrawn entirely by a rating agency.

·  
The inability of NextEra Energy’s, Capital Holdings’ and FPL’s credit providers to maintain credit ratings acceptable under various agreements, or to fund their credit commitments, could require NextEra Energy, Capital Holdings or FPL, among other things, to renegotiate requirements in agreements, find an alternative credit provider with acceptable credit ratings to meet funding requirements, or post cash collateral.

The use of derivative contracts by NextEra Energy and FPL in the normal course of business could result in financial losses or the payment of margin cash collateral that could adversely affect their financial results and liquidity.

 
12

 

NextEra Energy and FPL use derivative instruments, such as swaps, options, futures and forwards, some of which are traded in the over-the-counter (OTC) markets or on exchanges, to manage their commodity and financial market risks, and for NextEra Energy to engage in trading and marketing activities.  NextEra Energy could recognize financial losses as a result of volatility in the market values of these derivative instruments or if a counterparty fails to perform or make payments under these derivative instruments.  NextEra Energy also could suffer a reduction in operating cash flows as a result of the requirement to post margin cash collateral.  In the absence of actively quoted market prices and pricing information from external sources, the valuation of these derivative instruments involves management’s judgment or use of estimates.  Although NextEra Energy and FPL execute transactions in derivative instruments on either recognized exchanges or via the OTC markets, depending on the most favorable credit and market execution factors, there is greater volatility and less liquidity in transactions executed in OTC markets and, as a result, NextEra Energy and FPL may not be able to execute such transactions in times of market volatility.  As a result, changes in the underlying assumptions or use of alternative valuation methods could affect the reported fair value of these derivative instruments.  In addition, FPL’s use of such instruments could be subject to prudence challenges and, if found imprudent, could result in disallowances of cost recovery for such use by the FPSC.

·  
NextEra Energy provides full energy and capacity requirement services, which include, for example, load-following services and various ancillary services, primarily to distribution utilities to satisfy all or a portion of such utilities’ power supply obligations to their customers.  The supply costs for these transactions may be affected by a number of factors, including, but not limited to, events that may occur after NextEra Energy has committed to supply power, such as weather conditions, fluctuating prices for energy and ancillary services, and the ability of the distribution utilities’ customers to elect to receive service from competing suppliers.  If the supply costs are not favorable, NextEra Energy’s operating costs could increase and adversely affect its results of operations.

·  
NextEra Energy is an active participant in energy markets.  The liquidity of regional energy markets is an important factor in the company's ability to manage risks in these operations.  Over the past several years, other market participants have ceased or significantly reduced their activities in energy markets as a result of several factors, including, but not limited to, government investigations, changes in market design, and deteriorating credit quality.  Liquidity in the energy markets can be adversely affected by price volatility, restrictions on the availability of credit, and other factors.  As a result, reductions in liquidity may restrict the ability of NextEra Energy to manage its risks, and this could negatively affect NextEra Energy’s financial results.

·  
NextEra Energy and FPL have hedging and trading procedures and associated risk management tools, such as separate but complementary financial, credit, operational, compliance and legal reporting systems, internal controls, management review processes and other mechanisms, that may not work as planned.  Risk management tools and metrics such as daily value at risk, earnings at risk, stop loss limits and liquidity guidelines are based on historical price movements.  If price movements significantly or persistently deviate from historical behavior, the risk management tools may not protect against significant losses.  As a result of these and other factors, NextEra Energy and FPL cannot predict with precision the impact that risk management decisions may have on their financial results and liquidity.

NextEra Energy’s and FPL’s financial results and liquidity could be materially adversely affected if the rules implementing the Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) broaden the scope of its provisions regarding the regulation of OTC financial derivatives and make them applicable to NextEra Energy and FPL.

 
13

 

·  
The Dodd-Frank Act was enacted into law in July 2010 which, among other things, provides for the regulation of the OTC derivatives market.  While the legislation is broad and detailed, substantial portions of the legislation require implementing rules to be adopted by federal governmental agencies including, but not limited to, the U.S. Securities and Exchange Commission and the U.S. Commodity Futures Trading Commission.  NextEra Energy and FPL cannot predict the final rules that will be adopted to implement the OTC derivatives market provisions of the Dodd-Frank Act.  Those rules could negatively affect NextEra Energy’s and FPL’s ability to hedge their commodity and interest rate risks, which could have a material adverse effect on NextEra Energy’s and FPL’s financial results.  The rules also could require NextEra Energy Resources to restructure part of its energy marketing and trading operations or to discontinue certain portions of its business.  In addition, if the rules require NextEra Energy and FPL to post cash collateral with respect to swap transactions, NextEra Energy’s and FPL’s liquidity could be materially adversely affected, and their ability to enter into OTC derivatives to hedge commodity and interest rate risks could be significantly limited.  Reporting and compliance requirements of the rules also could significantly increase operating costs and expose NextEra Energy and FPL to penalties for non-compliance.

NextEra Energy’s ability to successfully identify, complete and integrate acquisitions is subject to significant risks, including, but not limited to, the effect of increased competition for acquisitions resulting from the consolidation of the power industry.

·  
NextEra Energy is likely to encounter significant competition for acquisition opportunities that may become available as a result of the consolidation of the power industry in general.  In addition, NextEra Energy may be unable to identify attractive acquisition opportunities at favorable prices and to complete and integrate them successfully and in a timely manner.

NextEra Energy may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay upstream dividends or repay funds to NextEra Energy or if NextEra Energy is required to perform under guarantees of obligations of its subsidiaries.

·  
NextEra Energy is a holding company and, as such, has no material operations of its own.  Substantially all of NextEra Energy’s consolidated assets are held by subsidiaries.  NextEra Energy’s ability to meet its financial obligations, including, but not limited to, its guarantees, and to pay dividends on its common stock is primarily dependent on the subsidiaries’ net income and cash flows, which are subject to the risks of their respective businesses, and their ability to pay upstream dividends or to repay funds to NextEra Energy.  The subsidiaries have financial obligations, including, but not limited to, payment of debt service, which they must satisfy before they can fund NextEra Energy.  NextEra Energy’s subsidiaries are separate legal entities and have no obligation to provide NextEra Energy with funds for its payment obligations.  In addition, the dividend-paying ability of some of the subsidiaries is limited by contractual restrictions which are contained in outstanding financing agreements and which may be included in future financing agreements.  The future enactment of laws or regulations also may prohibit or restrict the ability of NextEra Energy's subsidiaries to pay upstream dividends or to repay funds.  NextEra Energy guarantees many of the obligations of its consolidated subsidiaries, other than FPL, through guarantee agreements with Capital Holdings.  These guarantees may require NextEra Energy to provide substantial funds to its subsidiaries or their creditors or counterparties at a time when NextEra Energy is in need of liquidity to fund its own obligations or to pay dividends.  In addition, in the event of a subsidiary’s liquidation or reorganization, NextEra Energy’s right to participate in a distribution of assets is subject to the prior claims of the subsidiary’s creditors.

Changes in tax laws, as well as judgments and estimates used in the determination of tax-related asset and liability amounts, could adversely affect NextEra Energy’s and FPL’s financial results, financial condition and liquidity.

 
14

 

·  
NextEra Energy’s and FPL’s provision for income taxes and reporting of tax-related assets and liabilities requires significant judgments and the use of estimates.  Amounts of tax-related assets and liabilities involve judgments and estimates of the timing and probability of recognition of income, deductions and tax credits, including, but not limited to, estimates for potential adverse outcomes regarding tax positions that have been taken and the ability to utilize tax benefit carryforwards, such as net operating loss and tax credit carryforwards.  Actual income taxes could vary significantly from estimated amounts due to the future impacts of, among other things, changes in tax laws, regulations and interpretations, financial condition and results of operations of NextEra Energy and its subsidiaries, including, but not limited to, FPL, as well as the resolution of audit issues raised by taxing authorities.  Ultimate resolution of income tax matters may result in material adjustments to tax-related assets and liabilities which could negatively affect NextEra Energy’s and FPL’s financial results, financial condition and liquidity.

NextEra Energy’s and FPL’s retail businesses are subject to the risk that sensitive customer data may be compromised, which could result in an adverse impact to their reputation and/or the financial results of the retail business.

·  
NextEra Energy’s and FPL’s retail businesses require access to sensitive customer data in the ordinary course of business.  NextEra Energy’s and FPL’s retail businesses may also need to provide sensitive customer data to vendors and service providers who require access to this information in order to provide services, such as call center services, to the retail businesses.  If a significant breach occurred, the reputation of NextEra Energy and FPL could be adversely affected, customer confidence could be diminished, customer information could be used for identity theft purposes, NextEra Energy and FPL would be subject to costs associated with the breach and/or NextEra Energy and FPL could be subject to fines and legal claims, any of which may have a negative impact on the businesses and/or NextEra Energy’s and FPL’s financial results.

A failure in NextEra Energy’s and FPL’s operational systems or infrastructure, or those of third parties, could impair their liquidity, disrupt their businesses, result in the disclosure of confidential information and adversely affect their financial results.

·  
NextEra Energy’s and FPL’s businesses are highly dependent on their ability to process and monitor, on a daily basis, a very large number of transactions, many of which are highly complex, and cross numerous and diverse markets.  Due to the size, scope and geographical reach of NextEra Energy’s and FPL’s businesses, and due to the complexity of the process of power generation, transmission and distribution, the development and maintenance of NextEra Energy’s and FPL’s operational systems and infrastructure is challenging.  NextEra Energy's and FPL’s operating systems and facilities may fail to operate properly or become disabled as a result of events that are either within, or wholly or partially outside, their control, such as operator error, severe weather or terrorist activities.  Any such failure or disabling event could adversely affect NextEra Energy’s and FPL’s ability to process transactions and provide services, and their financial results and liquidity.

·  
NextEra Energy and FPL add, modify and replace information systems on a regular basis.  Modifying existing information systems or implementing new or replacement information systems is costly and involves risks, including, but not limited to, integrating the modified, new or replacement system with existing systems and processes, implementing associated changes in accounting procedures and controls, and ensuring that data conversion is accurate and consistent.  Any disruptions or deficiencies in existing information systems, or disruptions, delays or deficiencies in the modification or implementation of new information systems, could result in increased costs, the inability to track or collect revenues, the diversion of management’s and employees’ attention and resources, and could negatively impact the effectiveness of the companies’ control environment, and/or the companies’ ability to timely file required regulatory reports.

·  
NextEra Energy and FPL also face the risks of operational failure, termination, or capacity constraints of third parties, including, but not limited to, those who provide power transmission and natural gas transportation services.

 
15

 

Threats of terrorism and catastrophic events that could result from terrorism, cyber attacks, or individuals and/or groups attempting to disrupt NextEra Energy’s and FPL’s businesses, or the businesses of third parties, may impact the operations of NextEra Energy and FPL in unpredictable ways and could adversely affect NextEra Energy’s and FPL’s financial results and liquidity.

·  
NextEra Energy and FPL are subject to the potentially adverse operating and financial effects of terrorist acts and threats, as well as cyber attacks and other disruptive activities of individuals or groups.  NextEra Energy’s and FPL’s generation, transmission and distribution facilities, fuel storage facilities, information technology systems and other infrastructure facilities and systems and physical assets, could be direct targets of, or indirectly affected by, such activities.  Terrorist acts or other similar events could harm NextEra Energy’s and FPL’s businesses by limiting their ability to generate, purchase or transmit power and by delaying their development and construction of new generating facilities and capital improvements to existing facilities.  These events, and governmental actions in response, could result in a material decrease in revenues and significant additional costs to repair and insure NextEra Energy’s and FPL’s assets, and could adversely affect NextEra Energy’s and FPL’s operations by contributing to disruption of supplies and markets for natural gas, oil and other fuels.  They could also impair NextEra Energy’s and FPL’s ability to raise capital by contributing to financial instability and lower economic activity.

·  
NextEra Energy and FPL operate in a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure.  Despite NextEra Energy’s and FPL’s implementation of security measures, all of their technology systems are vulnerable to disability, failures or unauthorized access due to such activities.  If NextEra Energy’s or FPL’s technology systems were to fail or be breached and be unable to recover in a timely way, NextEra Energy and FPL would be unable to fulfill critical business functions, and sensitive confidential and other data could be compromised, which could have a material adverse effect on NextEra Energy’s and FPL’s financial results.

·  
The implementation of security guidelines and measures and maintenance of insurance, to the extent available, addressing such activities could increase costs.  These types of events could materially adversely affect NextEra Energy’s and FPL’s financial results.  In addition, these types of events could require significant management attention and resources, and could adversely affect NextEra Energy’s and FPL’s reputation among customers and the public.

·  
A disruption of the regional electric transmission grid, natural gas pipeline infrastructure or other fuel sources, could negatively impact NextEra Energy’s and FPL’s businesses.  Because generation, transmission systems and natural gas pipelines are part of an interconnected system, NextEra Energy and FPL face the risk of possible loss of business due to a disruption caused by the impact of an event on the interconnected system (such as severe weather or a generator or transmission facility outage, pipeline rupture, or a sudden and significant increase or decrease in wind generation) within NextEra Energy’s and FPL’s systems or within a neighboring system.  Any such disruption could have a material adverse effect on NextEra Energy’s and FPL’s financial results.

The ability of NextEra Energy and FPL to obtain insurance and the terms of any available insurance coverage could be adversely affected by international, national, state or local events and company-specific events, as well as the financial condition of insurers. NextEra Energy’s and FPL’s insurance coverage may not provide protection against all significant losses.

·  
The ability of NextEra Energy and FPL to obtain insurance, as well as the cost and coverage of such insurance, could be affected by developments affecting their businesses, as well as by international, national, state or local events, as well as the financial condition of insurers.  Insurance coverage may not continue to be available at all or at rates or on terms similar to those presently available to NextEra Energy and FPL.  A loss for which NextEra Energy and FPL are not fully insured could materially and adversely affect their financial results.  NextEra Energy’s and FPL’s insurance may not be sufficient or effective under all circumstances and against all hazards or liabilities to which the companies may be subject.

 
16

 

The businesses and financial results of NextEra Energy and FPL could be negatively affected by the lack of a qualified workforce, work strikes or stoppages and increasing personnel costs.

·  
NextEra Energy and FPL may not be able effectively and profitably to obtain new customers, or grow their customer base, service existing customers and meet their other business plan goals if they do not attract and retain a qualified workforce.  The lack of a qualified workforce, including, for example, the loss or retirement of key executives and other employees, may adversely affect service and productivity and contribute to higher training and safety costs.  Over the next several years, a significant portion of NextEra Energy’s and FPL’s workforce, including, but not limited to, many workers with specialized skills maintaining and servicing the nuclear generation facilities and electrical infrastructure, will be eligible to retire.  Such highly skilled individuals may not be able to be replaced quickly due to the technically complex work they perform.  Personnel costs also may increase due to inflationary or competitive pressures on payroll and benefits costs and revised terms of collective bargaining agreements with union employees.  Employee strikes or work stoppages could disrupt operations and lead to a loss of customers and revenue.

Poor market performance and other economic factors could affect NextEra Energy’s and FPL’s nuclear decommissioning funds’ asset value or defined benefit pension plan’s funded status, which may adversely affect NextEra Energy’s and FPL’s liquidity and financial results.

·  
NextEra Energy and FPL are required to maintain decommissioning funds to satisfy their future obligations to decommission their nuclear power plants.  In addition, NextEra Energy sponsors a qualified noncontributory defined benefit pension plan for substantially all employees of NextEra Energy and its subsidiaries.  A decline in the market value of the assets held in the decommissioning funds or in the defined benefit pension plan due to poor investment performance or other factors may increase the funding requirements for these obligations.  Moreover, NextEra Energy’s and FPL’s defined benefit pension plan is sensitive to changes in interest rates, since, as interest rates decrease the funding liabilities increase, potentially increasing benefits costs and funding requirements.  Any increase in benefits costs or funding requirements may have an adverse effect on NextEra Energy’s and FPL’s liquidity and financial results.

Increasing costs associated with health care plans may adversely affect NextEra Energy's and FPL's financial results.

·  
The costs of providing health care benefits to employees and retirees have increased substantially in recent years.  NextEra Energy and FPL believe that their employee benefit costs, including, but not limited to, costs related to health care plans for employees and former employees, will continue to rise.  The increasing costs and funding requirements associated with NextEra Energy's and FPL's health care plans may adversely affect the companies' financial results.

The risks described herein are not the only risks facing NextEra Energy and FPL.  Additional risks and uncertainties also may materially adversely affect NextEra Energy's or FPL's business, financial condition, future operating results and/or liquidity.
 
 

 

 
17

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Income
(millions, except per share amounts)
(unaudited)

Three Months Ended March 31, 2011
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Operating Revenues
  $ 2,246     $ 833     $ 55     $ 3,134  
                                 
Operating Expenses
                               
Fuel, purchased power and interchange
    1,071       315       18       1,404  
Other operations and maintenance
    374       305       14       693  
Depreciation and amortization
    142       182       7       331  
Taxes other than income taxes and other
    253       22       3       278  
Total operating expenses
    1,840       824       42       2,706  
                                 
Operating Income (Loss)
    406       9       13       428  
                                 
Other Income (Deductions)
                               
Interest expense
    (91 )     (136 )     (27 )     (254 )
Equity in earnings of equity method investees
    -       10       -       10  
Allowance for equity funds used during construction
    11       -       1       12  
Interest income
    -       6       15       21  
Gains (losses) on disposal of assets - net
    -       17       -       17  
Other than temporary impairment losses on securities held in nuclear decommissioning funds
    -       (1 )     -       (1 )
Other – net
    -       4       (1 )     3  
Total other income (deductions) – net
    (80 )     (100 )     (12 )     (192 )
                                 
Income (Loss) Before Income Taxes
    326       (91 )     1       236  
Income Tax Expense (Benefit)
    121       (156 )     3       (32 )
                                 
Net Income (Loss)
  $ 205     $ 65     $ (2 )   $ 268  
                                 
Reconciliation of Net Income (Loss) to Adjusted Earnings (Loss):
                               
Net Income (Loss)
  $ 205     $ 65     $ (2 )   $ 268  
Adjustments, net of income taxes:
                               
Net unrealized mark-to-market (gains) losses associated with non-qualifying hedges
    -       125       -       125  
Other than temporary impairment losses - net
    -       (1 )     -       (1 )
                                 
Adjusted Earnings (Loss)
  $ 205     $ 189     $ (2 )   $ 392  
                                 
Earnings (Loss) Per Share (assuming dilution)
  $ 0.49     $ 0.16     $ (0.01 )   $ 0.64  
Adjustments:
                               
Net unrealized mark-to-market (gains) losses associated with non-qualifying hedges
    -       0.30       -       0.30  
Other than temporary impairment losses - net
    -       -       -       -  
                                 
Adjusted Earnings (Loss) Per Share
  $ 0.49     $ 0.46     $ (0.01 )   $ 0.94  
                                 
Weighted-average shares outstanding (assuming dilution)
                            418  

NextEra Energy Resources' (Energy Resources) financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.

 
18

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Income
(millions, except per share amounts)
(unaudited)

Three Months Ended March 31, 2010
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Operating Revenues
  $ 2,328     $ 1,247     $ 47     $ 3,622  
                                 
Operating Expenses
                               
Fuel, purchased power and interchange
    1,107       220       22       1,349  
Other operations and maintenance
    373       277       9       659  
Depreciation and amortization
    229       180       5       414  
Taxes other than income taxes and other
    226       34       1       261  
Total operating expenses
    1,935       711       37       2,683  
                                 
Operating Income (Loss)
    393       536       10       939  
                                 
Other Income (Deductions)
                               
Interest expense
    (87 )     (127 )     (24 )     (238 )
Equity in earnings of equity method investees
    -       7       -       7  
Allowance for equity funds used during construction
    7       -       -       7  
Interest income
    -       5       13       18  
Gains (losses) on disposal of assets - net
    -       39       -       39  
Other than temporary impairment losses on securities held in nuclear decommissioning funds
    -       (1 )     -       (1 )
Other – net
    (1 )     (1 )     1       (1 )
Total other income (deductions) – net
    (81 )     (78 )     (10 )     (169 )
                                 
Income (Loss) Before Income Taxes
    312       458       -       770  
Income Tax Expense (Benefit)
    121       91       2       214  
Net Income (Loss)
  $ 191     $ 367     $ (2 )   $ 556  
                                 
Reconciliation of Net Income (Loss) to Adjusted Earnings (Loss):
                               
Net Income (Loss)
  $ 191     $ 367     $ (2 )   $ 556  
Adjustments, net of income taxes:
                               
Net unrealized mark-to-market (gains) losses associated with non-qualifying hedges
    -       (167 )     1       (166 )
Other than temporary impairment losses - net
    -       (4 )     -       (4 )
Adjusted Earnings (Loss)
  $ 191     $ 196     $ (1 )   $ 386  
                                 
Earnings (Loss) Per Share (assuming dilution)
  $ 0.47     $ 0.89     $ -     $ 1.36  
Adjustments:
                               
Net unrealized mark-to-market (gains) losses associated with non-qualifying hedges
    -       (0.41 )     -       (0.41 )
Other than temporary impairment losses - net
    -       (0.01 )     -       (0.01 )
Adjusted Earnings (Loss) Per Share
  $ 0.47     $ 0.47     $ -     $ 0.94  
Weighted-average shares outstanding (assuming dilution)
                            410  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.

 
19

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Balance Sheets
(millions)
(unaudited)

March 31, 2011
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Property, Plant and Equipment
                       
Electric utility plant in service and other property
  $ 29,729     $ 18,977     $ 502     $ 49,208  
Nuclear fuel
    794       792       -       1,586  
Construction work in progress
    2,460       1,943       108       4,511  
Less accumulated depreciation and amortization
    (10,931 )     (4,228 )     (209 )     (15,368 )
     Total property, plant and equipment – net
    22,052       17,484       401       39,937  
                                 
Current Assets
                               
Cash and cash equivalents
    21       169       235       425  
Customer receivables, net of allowances
    574       679       32       1,285  
Other receivables
    311       300       106       717  
Materials, supplies and fossil fuel inventory
    527       343       5       875  
Regulatory assets:
                               
Deferred clause and franchise expenses
    266       -       -       266  
Derivatives
    158       -       -       158  
Other
    76       -       6       82  
Derivatives
    9       369       40       418  
Other
    120       156       17       293  
     Total current assets
    2,062       2,016       441       4,519  
                                 
Other Assets
                               
Special use funds
    2,722       1,151       14       3,887  
Other investments
    4       242       685       931  
Prepaid benefit costs
    1,048       -       230       1,278  
Regulatory assets:
                               
Securitized storm-recovery costs
    567       -       -       567  
Deferred clause expenses
    34       -       -       34  
Other
    338       -       35       373  
Other
    157       1,265       309       1,731  
     Total other assets
    4,870       2,658       1,273       8,801  
                                 
Total Assets
  $ 28,984     $ 22,158     $ 2,115     $ 53,257  


 
20

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Balance Sheets
(millions)
(unaudited)

March 31, 2011
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Capitalization
                       
Common stock
  $ 1,373     $ -     $ (1,369 )   $ 4  
Additional paid-in capital
    5,054       7,850       (7,423 )     5,481  
Retained earnings
    3,150       4,077       1,685       8,912  
Accumulated other comprehensive income (loss)
    -       160       42       202  
     Total common shareholders' equity
    9,577       12,087       (7,065 )     14,599  
Long-term debt
    6,657       4,971       6,660       18,288  
     Total capitalization
    16,234       17,058       (405 )     32,887  
                                 
Current Liabilities
                               
Commercial paper
    431       -       947       1,378  
Current maturities of long-term debt
    48       368       1,172       1,588  
Accounts payable
    569       497       9       1,075  
Customer deposits
    631       6       -       637  
Accrued interest and taxes
    317       191       (21 )     487  
Regulatory liabilities:
                               
     Deferred clause and franchise revenues
    40       -       -       40  
     Other
    -       -       2       2  
Derivatives
    167       289       11       467  
Accrued construction-related expenditures
    168       74       13       255  
Other
    347       367       96       810  
     Total current liabilities
    2,718       1,792       2,229       6,739  
                                 
Other Liabilities and Deferred Credits
                               
Asset retirement obligations
    1,097       485       -       1,582  
Accumulated deferred income taxes
    4,083       1,136       (62 )     5,157  
Regulatory liabilities:
                               
Accrued asset removal costs
    2,198       -       -       2,198  
Asset retirement obligation regulatory expense difference
    1,657       -       -       1,657  
Other
    413       -       38       451  
Derivatives
    -       210       16       226  
Deferral related to differential membership interests
    -       940       -       940  
Other
    584       537       299       1,420  
Total other liabilities and deferred credits
    10,032       3,308       291       13,631  
                                 
Commitments and Contingencies
                               
                                 
Total Capitalization and Liabilities
  $ 28,984     $ 22,158     $ 2,115     $ 53,257  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.

 
21

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Balance Sheets
(millions)
(unaudited)

December 31, 2010
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Property, Plant and Equipment
                       
Electric utility plant in service and other property
  $ 29,519     $ 18,912     $ 410     $ 48,841  
Nuclear fuel
    729       810       -       1,539  
Construction work in progress
    2,175       1,582       84       3,841  
Less accumulated depreciation and amortization
    (10,871 )     (4,073 )     (202 )     (15,146 )
Total property, plant and equipment – net
    21,552       17,231       292       39,075  
                                 
Current Assets
                               
Cash and cash equivalents
    20       165       117       302  
Customer receivables, net of allowances
    710       770       29       1,509  
Other receivables
    395       526       152       1,073  
Materials, supplies and fossil fuel inventory
    505       342       10       857  
Regulatory assets:
                               
Deferred clause and franchise expenses
    368       -       -       368  
Derivatives
    236       -       -       236  
Other
    76       -       6       82  
Derivatives
    8       446       52       506  
Other
    137       164       24       325  
Total current assets
    2,455       2,413       390       5,258  
                                 
Other Assets
                               
Special use funds
    2,637       1,106       (1 )     3,742  
Other investments
    4       276       691       971  
Prepaid benefit costs
    1,035       -       224       1,259  
Regulatory assets:
                               
Securitized storm-recovery costs
    581       -       -       581  
Deferred clause expenses
    -       -       -       -  
Other
    293       -       36       329  
Other
    141       1,363       275       1,779  
Total other assets
    4,691       2,745       1,225       8,661  
                                 
Total Assets
  $ 28,698     $ 22,389     $ 1,907     $ 52,994  


 
22

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Balance Sheets
(millions)
(unaudited)

December 31, 2010
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Capitalization
                       
Common stock
  $ 1,373     $ -     $ (1,369 )   $ 4  
Additional paid-in capital
    5,054       7,730       (7,366 )     5,418  
Retained earnings
    3,364       4,012       1,497       8,873  
Accumulated other comprehensive income (loss)
    -       127       39       166  
      Total common shareholders' equity
    9,791       11,869       (7,199 )     14,461  
Long-term debt
    6,682       4,864       6,467       18,013  
      Total capitalization
    16,473       16,733       (732 )     32,474  
                                 
Current Liabilities
                               
Commercial paper
    101       -       788       889  
Current maturities of long-term debt
    45       391       1,484       1,920  
Accounts payable
    554       559       11       1,124  
Customer deposits
    628       6       -       634  
Accrued interest and taxes
    311       325       (174 )     462  
Regulatory liabilities:
                               
Deferred clause and franchise revenues
    47       -       -       47  
Other
    -       -       4       4  
Derivatives
    245       285       6       536  
Accrued construction-related expenditures
    183       180       8       371  
Other
    394       402       121       917  
      Total current liabilities
    2,508       2,148       2,248       6,904  
                                 
Other Liabilities and Deferred Credits
                               
Asset retirement obligations
    1,083       556       -       1,639  
Accumulated deferred income taxes
    3,835       1,236       38       5,109  
Regulatory liabilities:
                               
Accrued asset removal costs
    2,244       -       -       2,244  
Asset retirement obligation regulatory expense difference
    1,592       -       -       1,592  
Other
    377       -       46       423  
Derivatives
    -       229       14       243  
Deferral related to differential membership interests
    -       949       -       949  
Other
    586       538       293       1,417  
      Total other liabilities and deferred credits
    9,717       3,508       391       13,616  
                                 
Commitments and Contingencies
                               
                                 
Total Capitalization and Liabilities
  $ 28,698     $ 22,389     $ 1,907     $ 52,994  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.


 
23

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Cash Flows
(millions)
(unaudited)

Three Months Ended March 31, 2011
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Cash Flows From Operating Activities
                       
Net income (loss)
  $ 205     $ 65     $ (2 )   $ 268  
Adjustments to reconcile net income (loss) to net cash provided by (used in) operating activities:
                               
Depreciation and amortization
    142       182       7       331  
Nuclear fuel amortization
    34       37       -       71  
Unrealized (gains) losses on marked to market energy contracts
    -       231       -       231  
Deferred income taxes
    220       (113 )     (98 )     9  
Cost recovery clauses and franchise fees
    61       -       -       61  
Changes in prepaid option premiums and derivative settlements
    -       11       -       11  
Equity in earnings of equity method investees
    -       (10 )     -       (10 )
Distributions of earnings from equity method investees
    -       23       -       23  
Allowance for equity funds used during construction
    (11 )     -       (1 )     (12 )
Gains on disposal of assets - net
    -       (17 )     -       (17 )
Changes in operating assets and liabilities:
                               
Customer receivables
    136       95       (2 )     229  
Other receivables
    33       -       (12 )     21  
Materials, supplies and fossil fuel inventory
    (22 )     (1 )     5       (18 )
Other current assets
    (6 )     2       4       -  
Other assets
    (15 )     (13 )     (8 )     (36 )
Accounts payable
    (47 )     (56 )     (2 )     (105 )
Customer deposits
    2       -       1       3  
Margin cash collateral
    -       (25 )     -       (25 )
Income taxes
    (132 )     (130 )     219       (43 )
Interest and other taxes
    73       (5 )     (7 )     61  
Other current liabilities
    (27 )     (53 )     9       (71 )
Other liabilities
    (1 )     (8 )     15       6  
Other – net
    (13 )     9       (1 )     (5 )
Net cash provided by (used in) operating activities
    632       224       127       983  


 
24

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Cash Flows
(millions)
(unaudited)

Three Months Ended March 31, 2011
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Cash Flows From Investing Activities
                       
Capital expenditures of FPL
    (658 )     -       -       (658 )
Independent power and other investments of NextEra Energy Resources
    -       (633 )     -       (633 )
Cash grants under the American Recovery and Reinvestment Act of 2009
    154       223       -       377  
Nuclear fuel purchases
    (36 )     (11 )     -       (47 )
Other capital expenditures
    -       -       (106 )     (106 )
Proceeds from sale or maturity of securities in special use funds
    964       383       -       1,347  
Purchases of securities in special use funds
    (978 )     (389 )     -       (1,367 )
Proceeds from sale or maturity of other securities
    -       -       154       154  
Purchases of other securities
    -       -       (177 )     (177 )
Other – net
    -       33       -       33  
Net cash provided by (used in) investing activities
    (554 )     (394 )     (129 )     (1,077 )
                                 
Cash Flows From Financing Activities
                               
Issuances of long-term debt
    -       201       -       201  
Retirements of long-term debt
    (24 )     (128 )     (100 )     (252 )
Net change in short-term debt
    330       -       158       488  
Issuances of common stock - net
    -       -       18       18  
Dividends on common stock
    -       -       (229 )     (229 )
Dividends & capital distributions from (to) NextEra Energy, Inc. – net
    (400 )     120       280       -  
Other – net
    17       (19 )     (7 )     (9 )
Net cash provided by (used in) financing activities
    (77 )     174       120       217  
                                 
Net increase (decrease) in cash and cash equivalents
    1       4       118       123  
Cash and cash equivalents at beginning of period
    20       165       117       302  
                                 
Cash and cash equivalents at end of period
  $ 21     $ 169     $ 235     $ 425  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.


 
25

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Cash Flows
(millions)
(unaudited)

Three Months Ended March 31, 2010
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Cash Flows From Operating Activities
                       
Net income (loss)
  $ 191     $ 367     $ (2 )   $ 556  
Adjustments to reconcile net income (loss) to net cash provided by (used in) operating activities:
                               
Depreciation and amortization
    229       180       5       414  
Nuclear fuel amortization
    36       36       -       72  
Unrealized (gains) losses on marked to market energy contracts
    -       (326 )     2       (324 )
Deferred income taxes
    123       128       19       270  
Cost recovery clauses and franchise fees
    (392 )     -       -       (392 )
Changes in prepaid option premiums and derivative settlements
    -       164       -       164  
Equity in earnings of equity method investees
    -       (7 )     -       (7 )
Distribution of earnings from equity method investees
    -       -       -       -  
Allowance for equity funds used during construction
    (7 )     -       -       (7 )
Gains on disposal of assets - net
    -       (39 )     -       (39 )
Changes in operating assets and liabilities:
                               
Customer receivables
    192       67       (2 )     257  
Other receivables
    18       (16 )     (8 )     (6 )
Materials, supplies and fossil fuel inventory
    12       14       -       26  
Other current assets
    (14 )     (2 )     4       (12 )
Other assets
    (27 )     10       (13 )     (30 )
Accounts payable
    2       (43 )     19       (22 )
Customer deposits
    14       1       -       15  
Margin cash collateral
    (5 )     20       1       16  
Income taxes
    (68 )     (19 )     12       (75 )
Interest and other taxes
    53       (25 )     (12 )     16  
Other current liabilities
    (25 )     (17 )     2       (40 )
Other liabilities
    21       (13 )     1       9  
Other – net
    36       (16 )     15       35  
Net cash provided by (used in) operating activities
    389       464       43       896  


 
26

 

NextEra Energy, Inc.
Preliminary Condensed Consolidated Statements of Cash Flows
(millions)
(unaudited)

Three Months Ended March 31, 2010
 
Florida Power
& Light
   
NextEra Energy Resources
   
Corporate &
Other
   
NextEra
Energy, Inc.
 
Capital expenditures of FPL
    (794 )     -       -       (794 )
Independent power and other investments of NextEra Energy Resources
          (567 )     -       (567 )
Cash grants under the American Recovery and Reinvestment Act of 2009
    44       55       -       99  
Funds received from a spent fuel settlement
    -       -       -       -  
Nuclear fuel purchases
    (7 )     (31 )     1       (37 )
Other capital expenditures
    -       -       (15 )     (15 )
Proceeds from sale or maturity of securities in special use funds
    2,199       364       -       2,563  
Purchases of securities in special use funds
    (2,230 )     (370 )     -       (2,600 )
Proceeds from sale or maturity of other securities
    -       -       244       244  
Purchases of other securities
    -       -       (253 )     (253 )
Other – net
    1       (1 )     (1 )     (1 )
Net cash provided by (used in) investing activities
    (787 )     (550 )     (24 )     (1,361 )
                                 
Cash Flows From Financing Activities
                               
Issuances of long-term debt
    499       301       -       800  
Retirements of long-term debt
    (22 )     (79 )     (1 )     (102 )
Net change in short-term debt
    426       -       490       916  
Issuances of common stock - net
    -       -       12       12  
Dividends on common stock
    -       -       (204 )     (204 )
Dividends & capital distributions from (to) NextEra Energy, Inc. – net
    -       (131 )     131       -  
Other – net
    2       22       (4 )     20  
Net cash provided by (used in) financing activities
    905       113       424       1,442  
                                 
Net increase (decrease) in cash and cash equivalents
    507       27       443       977  
Cash and cash equivalents at beginning of period
    83       118       37       238  
                                 
Cash and cash equivalents at end of period
  $ 590     $ 145     $ 480     $ 1,215  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.

 
27

 

NextEra Energy, Inc.
Preliminary Earnings Per Share Contributions
(assuming dilution)
(unaudited)

   
First
Quarter
 
NextEra Energy, Inc. – 2010 Earnings Per Share
  $ 1.36  
   
Florida Power & Light – 2010 Earnings Per Share
  $ 0.47  
Allowance for funds used during construction
    0.01  
Cost recovery clause results, primarily solar and nuclear uprates
    0.01  
Rate base growth and other
    0.01  
Share dilution
    (0.01 )
Florida Power & Light – 2011 Earnings Per Share
    0.49  
   
NextEra Energy Resources – 2010 Earnings Per Share
    0.89  
New investments
    -  
Existing assets
    0.10  
Gas infrastructure
    -  
Customer supply businesses & proprietary power & gas trading
    (0.07 )
Asset sales
    (0.03 )
Non-qualifying hedges impact
    (0.71 )
Change in other than temporary impairment losses - net
    (0.01 )
Share dilution
    (0.02 )
Other, including interest expense
    0.01  
NextEra Energy Resources – 2011 Earnings Per Share
    0.16  
   
Corporate and Other – 2010 Earnings Per Share
    -  
FPL FiberNet
    -  
Share dilution
    -  
Other, including interest expense and interest income
    (0.01 )
Corporate and Other – 2011 Earnings Per Share
    (0.01 )
         
NextEra Energy, Inc. – 2011 Earnings Per Share
  $ 0.64  

Energy Resources' financial statements include non-utility interest expense on a deemed capital structure of 70% debt and allocated shared service costs. For interest allocation purposes, the deferred credit associated with differential membership interests sold by Energy Resources subsidiaries is included with debt.  Residual non-utility interest expense is included in Corporate & Other.

Corporate & Other represents other business activities, other segments that are not separately reportable, eliminating entries, and may include the net effect of rounding.

 
28

 

NextEra Energy, Inc.
Preliminary Long-Term Debt and Commercial Paper
(millions)
(unaudited)
March 31, 2011

Type of Debt
 
Interest
Rate (%)
 
Maturity
Date
 
Total
Debt
   
Current
Portion
   
Long-Term Portion
 
Long-Term:
                         
Florida Power & Light
                         
First Mortgage Bonds:
                         
First Mortgage Bonds
    4.850  
02/01/13
  $ 400     $ -     $ 400  
First Mortgage Bonds
    5.850  
02/01/33
    200       -       200  
First Mortgage Bonds
    5.950  
10/01/33
    300       -       300  
First Mortgage Bonds
    5.625  
04/01/34
    500       -       500  
First Mortgage Bonds
    5.650  
02/01/35
    240       -       240  
First Mortgage Bonds
    4.950  
06/01/35
    300       -       300  
First Mortgage Bonds
    5.400  
09/01/35
    300       -       300  
First Mortgage Bonds
    6.200  
06/01/36
    300       -       300  
First Mortgage Bonds
    5.650  
02/01/37
    400       -       400  
First Mortgage Bonds
    5.850  
05/01/37
    300       -       300  
First Mortgage Bonds
    5.550  
11/01/17
    300       -       300  
First Mortgage Bonds
    5.950  
02/01/38
    600       -       600  
First Mortgage Bonds
    5.960  
04/01/39
    500       -       500  
First Mortgage Bonds
    5.690  
03/01/40
    500       -       500  
First Mortgage Bonds
    5.250  
02/01/41
    400       -       400  
Total First Mortgage Bonds
              5,540       -       5,540  
Revenue Refunding Bonds:
                                 
Miami-Dade Solid Waste Disposal
 
VAR
 
02/01/23
    15       -       15  
St. Lucie Solid Waste Disposal
 
VAR
 
05/01/24
    79       -       79  
Total Revenue Refunding Bonds
              94       -       94  
Pollution Control Bonds:
                                 
Dade
 
VAR
 
04/01/20
    9       -       9  
Martin
 
VAR
 
07/15/22
    96       -       96  
Jacksonville
 
VAR
 
09/01/24
    46       -       46  
Manatee
 
VAR
 
09/01/24
    16       -       16  
Putnam
 
VAR
 
09/01/24
    4       -       4  
Jacksonville
 
VAR
 
05/01/27
    28       -       28  
St. Lucie
 
VAR
 
09/01/28
    242       -       242  
Jacksonville
 
VAR
 
05/01/29
    52       -       52  
Total Pollution Control Bonds
              493       -       493  
Industrial Bonds - Dade
 
VAR
 
06/01/21
    46       -       46  
Storm Securitization Bonds:
                                 
Storm Securitization Bonds
    5.040  
08/01/13
    121       48       73  
Storm Securitization Bonds
    5.130  
08/01/15
    100       -       100  
Storm Securitization Bonds
    5.260  
08/01/19
    288       -       288  
Total Storm Securitization Bonds
              509       48       461  
Water and Sewer Revenue Bonds
    4.000 - 5.250  
10/01/40
    57       -       57  
Unamortized discount
              (34 )     -       (34 )
Total Long-Term Debt
              6,705       48       6,657  
Commercial Paper
              431       431       -  
TOTAL DEBT - FLORIDA POWER & LIGHT
              7,136       479       6,657  


 
29

 

NextEra Energy, Inc.
Preliminary Long-Term Debt and Commercial Paper
(millions)
(unaudited)
March 31, 2011

Type of Debt
 
Interest
Rate (%)
 
Maturity
Date
 
Total
Debt
   
Current
Portion
   
Long-Term Portion
 
Capital Holdings Without NextEra Energy Resources
                     
Debentures:
                         
Debentures
    5.630  
09/01/11
    600       600       -  
Debentures
    5.350  
06/17/13
    250       -       250  
Debentures
    2.550  
11/15/13
    250       -       250  
Debentures
    2.600  
09/01/15
    400       -       400  
Debentures
    7.880  
12/15/15
    450       -       450  
Debentures
    7.880  
12/15/15
    50       -       50  
Debentures
    6.000  
03/01/19
    500       -       500  
Debentures, related to NextEra Energy's equity units
    3.600  
06/01/14
    350       -       350  
Debentures, related to NextEra Energy's equity units
    1.900  
09/01/15
    403       -       403  
Debentures (Junior Subordinated)
    5.880  
03/15/44
    309       -       309  
Debentures (Junior Subordinated)
    6.350  
10/01/66
    339       -       339  
Debentures (Junior Subordinated)
    6.600  
10/01/66
    350       -       350  
Debentures (Junior Subordinated)
    6.650  
06/15/67
    380       -       380  
Debentures (Junior Subordinated)
    7.300  
09/01/67
    250       -       250  
Debentures (Junior Subordinated)
    7.450  
09/01/67
    350       -       350  
Debentures (Junior Subordinated)
    8.750  
03/01/69
    375       -       375  
Floating Debenture
 
VAR
 
06/01/11
    250       250       -  
Floating Debenture
 
VAR
 
11/09/12
    200       -       200  
Total Debentures
              6,056       850       5,206  
Term Loans:
                                 
Term Loans
 
VAR
 
12/19/11
    149       149       -  
Term Loans
 
VAR
 
12/19/11
    168       168       -  
Term Loans
 
VAR
 
06/04/12
    150       -       150  
Term Loans
 
VAR
 
04/01/13
    100       -       100  
Term Loans
 
VAR
 
04/01/13
    100       -       100  
Term Loans
 
VAR
 
09/07/13
    50       -       50  
Term Loans
 
VAR
 
09/30/13
    50       -       50  
Term Loans
 
VAR
 
03/25/14
    100       -       100  
Term Loans
 
VAR
 
09/16/14
    110       -       110  
Term Loans
 
VAR
 
03/25/14
    100       -       100  
Term Loans
 
VAR
 
09/16/14
    90       -       90  
Term Loans
 
VAR
 
09/30/30
    119       -       119  
Total Term Loans
              1,286       317       969  
Senior Secured Bonds - Pipeline Funding
              500       -       500  
Fair value swaps
              (2 )     5       (7 )
Unamortized discount
              (8 )     -       (8 )
Total Long-Term Debt
              7,832       1,172       6,660  
Commercial Paper
              947       947       -  
TOTAL DEBT - CAPITAL HOLDINGS, WITHOUT NEXTERA ENERGY RESOURCES
    8,779       2,119       6,660  


 
30

 

NextEra Energy, Inc.
Preliminary Long-Term Debt and Commercial Paper
(millions)
(unaudited)
March 31, 2011

Type of Debt
 
Interest
Rate (%)
 
Maturity
Date
 
Total
Debt
   
Current Portion
   
Long-Term Portion
 
NextEra Energy Resources
                         
Senior Secured Bonds:
                         
Senior Secured Bonds
    6.876  
06/27/17
    55       12       43  
Senior Secured Bonds
    6.125  
03/25/19
    53       9       44  
Senior Secured Bonds
    7.520  
06/30/19
    167       17       150  
Senior Secured Bonds
    6.639  
06/20/23
    201       25       176  
Senior Secured Bonds
    5.608  
03/10/24
    232       29       203  
Total Senior Secured Bonds
              708       92       616  
Senior Secured Notes:
                                 
Senior Secured Notes
    7.500  
12/19/13
    155       17       138  
Senior Secured Notes
    7.260  
07/20/15
    125       -       125  
Senior Secured Notes
    6.310  
07/10/17
    290       -       290  
Senior Secured Notes
    7.590  
07/10/18
    510       14       496  
Senior Secured Notes
    7.110  
06/28/20
    80       6       74  
Senior Secured Notes
    6.610  
07/10/27
    35       -       35  
Senior Secured Notes
    6.560  
03/24/30
    305       3       302  
Senior Secured Notes
    6.250  
02/08/31
    82       2       80  
Senior Secured Notes
    6.665  
01/10/31
    138       12       126  
Senior Secured Notes
    6.960  
07/10/37
    250       -       250  
Limited-recourse Senior Secured Notes
    7.510  
07/20/21
    14       1       13  
Total Senior Secured Bonds
              1,984       55       1,929  
Other Debt:
                                 
Other Debt
 
VAR
 
12/31/12
    82       42       40  
Other Debt
    8.450  
12/31/12
    21       12       9  
Other Debt
 
Fixed & VAR
 
12/15/13
    209       -       209  
Other Debt
 
Fixed & VAR
 
02/28/15
    68       16       52  
Other Debt
 
VAR
 
12/30/16
    339       30       309  
Other Debt
 
Fixed & VAR
 
05/17/17
    308       26       282  
Other Debt
 
VAR
 
12/31/17
    50       13       37  
Other Debt
 
Fixed & VAR
 
01/31/18
    231       7       224  
Other Debt
    8.010  
12/31/18
    2       -       2  
Other Debt
 
Fixed & VAR
 
11/30/19
    174       24       150  
Other Debt
 
Fixed & VAR
 
12/31/19
    128       1       127  
Other Debt
 
Fixed & VAR
 
01/31/22
    367       22       345  
Other Debt
 
VAR
 
12/31/23
    87       6       81  
Other Debt
    6.501  
12/31/25
    36       1       35  
Other Debt
 
Fixed & VAR
 
01/29/27
    250       11       239  
Other Debt
 
Fixed & VAR
 
09/29/28
    291       10       281  
Capital Lease
       
03/31/40
    4       -       4  
Total Other Debt
              2,647       221       2,426  
Unamortized discount
              -       -       -  
TOTAL NEXTERA ENERGY RESOURCES DEBT
              5,339       368       4,971  
TOTAL DEBT - CAPITAL HOLDINGS INCLUDING NEXTERA ENERGY RESOURCES
    14,118       2,487       11,631  
TOTAL DEBT -  NEXTERA ENERGY, INC.
            $ 21,254     $ 2,966     $ 18,288  

May not agree to financial statements due to rounding.

 
31

 

NextEra Energy, Inc.
Preliminary Schedule of Total Debt and Equity
(millions)
(unaudited)

March 31, 2011
 
Per Books
   
Adjusted 1
 
Long-term debt, including current maturities, notes payable and commercial paper
           
    Junior Subordinated Debentures2
  $ 2,353     $ 1,177  
    Debentures, related to NextEra Energy's equity units
    753       753  
    Project debt:
               
Natural gas-fired assets
    117          
Wind assets
    3,250          
Hydro assets
    700          
Storm Securitization Debt
    507          
Pipeline Funding
    500          
Waste Water Bonds
    58          
Other long-term debt, including current maturities and commercial paper3
    13,016       13,016  
Total debt
    21,254       14,946  
Junior Subordinated Debentures2
            1,176  
Debentures, related to NextEra Energy's equity units
            753  
Common shareholders' equity
    14,599       14,599  
Total capitalization, including debt due within one year
  $ 35,853     $ 31,474  
                 
Debt ratio
    59 %     47 %

December 31, 2010
 
Per Books
   
Adjusted 1
 
Long-term debt, including current maturities and commercial paper
           
    Junior Subordinated Debentures2
  $ 2,353     $ 1,177  
    Debentures, related to NextEra Energy's equity units
    753       350  
    Project debt:
               
Natural gas-fired assets
    1,124          
Wind assets
    3,287          
Hydro assets
    700          
Storm Securitization Debt
    531          
Pipeline Funding
    500          
Waste Water Bonds
    57          
Other long-term debt, including current maturities and commercial paper3
    11,517       11,517  
Total debt
    20,822       13,044  
Junior Subordinated Debentures2
            1,176  
Debentures, related to NextEra Energy's equity units
            753  
Common shareholders' equity
    14,461       14,461  
Total capitalization, including debt due within one year
  $ 35,283     $ 29,434  
                 
Debt ratio
    59 %     44 %

1
Ratios exclude impact of imputed debt for purchase power obligations.  Including the impact of imputed debt for purchase power obligations the adjusted debt ratio would be 49% and 47% for March 31, 2011 and December 31, 2010 respectively.
2
Adjusted to reflect preferred stock characteristics of these securities (preferred trust securities and junior subordinated debentures).
3
Includes premium and discount on all debt issuances.


 
32

 

Florida Power & Light Company
Statistics
(unaudited)
 
   
 Quarter
Periods Ended March 31
 2011
 2010
Energy sales (million kwh)
   
Residential
11,437
13,054
Commercial
  9,853
  9,862
Industrial
     736
     761
Public authorities
     135
     134
Increase (decrease) in unbilled sales
   (582)
   (797)
Total retail
21,579
23,014
Electric utilities
     460
     487
Interchange power sales
     361
     358
Total
22,400
23,859
       
Average price (cents/kwh) 1
   
Residential
10.51
8.65
Commercial
9.21
7.46
Industrial
7.38
5.59
Total
9.80
8.08
       
Average customer accounts (000's)
   
Residential
4,021
3,996
Commercial
506
502
Industrial
9
9
Other
4
3
       
Total
4,540
4,510



End of period customer accounts (000's)
 MAR 2011
 MAR 2010
Residential
4,028
4,002
Commercial
506
502
Industrial
9
9
Other
4
4
Total
4,547
4,517

1 Excludes interchange power sales, net change in unbilled revenues, deferrals under cost recovery clauses and any provision for refund.



   
2011
Normal
2010
Three Months Ended March 31
     
 
Cooling degree-days
     119
     117
 42
 
Heating degree-days
     229
     256
     587

Cooling degree days for the periods above use a 72 degree base temperature and heating degree days use a 66 degree base temperature.


 