Exhibit 99.1
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - September 29, 2010
|
.
|
Approximate actual and estimated unpaid down time days *
|
||||||||||||||
RIG
|
RIG DESIGN
|
YEAR BUILT / REBUILT
|
WATER DEPTH
|
LOCATION
|
OPERATOR
|
ESTIMATED CONTRACT START DATE
|
ESTIMATED CONTRACT EXPIRATION DATE
|
FULL CONTRACT DAYRATE ($000)
|
COMMENTS
|
3Q-10
|
3Q-10
|
4Q-10
|
||||
A
|
E
|
E
|
||||||||||||||
This fleet status report contains information on contracts and letters of intent or awards with our customers. Letters of intent or awards are noted in the comments section and may not result in an actual drilling contract. The information contained in this fleet status report is as of the date of the report only and is subject to change without notice to the recipient, and we assume no duty to update any portion of the information contained herein. This fleet status report contains statements that are not historical facts, which are “forward-looking statements” within the meaning of the U.S. federal securities laws. Forward-looking statements include, but are not limited to, statements about estimated duration of client contracts, contract dayrate amounts, future contract commencement dates, shipyard projects, our business, financial performance and prospects. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially.
|
||||||||||||||||
Full Contract Dayrate reflects the full daywork operating rate payable to the Company by the operator as provided in the applicable drilling contract unless otherwise specified. The average dayrate over the term of the contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond our control. Our client contracts and operations are generally subject to a number of risks and uncertainties. We discuss these factors, including risks, uncertainties and assumptions concerning actions by our clients, governments and other third parties, drilling activity levels, market conditions, operational difficulties, weather related events and other matters, from time to time in our filings with the U.S. Securities and Exchange Commission (“SEC”), which we urge you to review and which are available free of charge on the SEC’s Web site at www.sec.gov.
|
||||||||||||||||
U.S. Gulf of Mexico Semisubmersibles (8)
|
||||||||||||||||
Noble Danny Adkins - Newbuild
|
Bingo 9000
|
1999/2009
|
12,000'-DP
|
US GOM
|
Shell
|
6/27/2010
|
8/18/2010
|
68-70
|
Suspension rate during period of limitation on certain activities in the U.S. Gulf of Mexico. Shell will provide certain operational support in addition to the suspension rate. The suspension period shall be extended in the event the period of limitation on certain activities in the U.S. Gulf of Mexico is extended.
|
|||||||
US GOM
|
Shell
|
8/19/2010
|
7/09/2014
|
446-448
|
BOP has been certified.
|
|||||||||||
Noble Jim Day - Newbuild
|
Bingo 9000
|
1999/2009
|
12,000'-DP
|
In-transit & acceptance testing
|
Marathon
|
6/17/2010
|
11/30/2010
|
-
|
Lump sum fee will offset mobilization costs. The drilling contract for the Noble Jim Day contains a termination right in the event the rig is not ready to commence operations by December 31, 2010. BOP is in the certification process.
|
|||||||
US GOM
|
Marathon
|
12/01/2010
|
11/30/2014
|
514-516
|
||||||||||||
Noble Clyde Boudreaux (a, b)
|
F&G 9500 Enhanced Pacesetter
|
1987/2007
|
10,000'
|
US GOM
|
Noble Energy
|
6/15/2010
|
12/12/2010
|
144-146
|
Standby rate from June 15, 2010 though December 12, 2010. Pursuant to the agreement reached regarding the standby period, the companies have agreed to negotiate in good faith to enter into a new drilling contract for the unit following the standby period at a dayrate of $396,000-$398,000. The parties contemplate that the term of this new contract would be equal to the remainder of the original contract term, previously expected to end in November 2011, exclusive of the standby period. However, there is no guarantee that agreement or a new contract will be reached. BOP is in the certification process.
|
7
|
||||||
Noble Amos Runner (a)
|
Noble EVA 4000™
|
1982/1999
|
8,000'
|
US GOM
|
Anadarko
|
4/25/2008
|
3/08/2011
|
439-441
|
We have a dispute with our client, Anadarko, who terminated the drilling contract effective June 13, 2010 under the force majeure provisions of the contract. We do not believe Anadarko had the right to terminate and have included the related revenues in our backlog ($117 million). We will not realize this amount if Anadarko is successful in the related litigation. BOP is in the certification process.
|
|||||||
Noble Jim Thompson
(a)
|
Noble EVA 4000™
|
1984/1999
|
6,000'
|
US GOM
|
Shell
|
6/27/2010
|
11/30/2010
|
46-48
|
Suspension rate during period of limitation on certain activities in the U.S. Gulf of Mexico. Shell will provide certain operational support in addition to the suspension rate. The suspension period shall be extended in the event the period of limitation on certain activities in the U.S. Gulf of Mexico is extended.
|
|||||||
US GOM
|
Shell
|
12/01/2010
|
2/28/2011
|
335-337
|
Pursuant to our agreement with Shell and in connection with the Frontier transaction closing, Noble will reduce the current dayrate to $335,000-$337,000. This same dayrate, plus an increase for anticipated capital expenditures expected to be incurred at the request of Shell, will also apply during a three-year extension, which is scheduled to begin following the conclusion of the current contract in March 2011 (plus the suspension period and plus any upgrade period to the extent it occurs beyond the period of suspension). The revised dayrate will be eligible for a 15% performance bonus. BOP is in the certification process.
|
|||||||||||
US GOM
|
Shell
|
3/01/2011
|
8/05/2014
|
335-337
|
Eligible for a maximum 15% bonus.
|
|||||||||||
|
||||||||||||||||
Noble Paul Romano (a)
|
Noble EVA 4000™
|
1981/1998
|
6,000'
|
US GOM
|
Shipyard
|
6/16/2010
|
-
|
Available. BOP is in the certification process.
|
91
|
1
|
||||||
Noble Driller
|
Aker H-3 Twin Hull S1289 Column
|
1976/2007
|
5,000'
|
US GOM
|
Shell
|
8/02/2010
|
12/31/2010
|
46-48
|
Suspension rate during period of limitation on certain activities in the U.S. Gulf of Mexico. BOP is in the certification process.
|
|||||||
US GOM
|
Shell
|
1/01/2011
|
11/29/2012
|
382-384
|
Plus five one-year options.
|
|||||||||||
Noble Lorris Bouzigard (b)
|
Pentagone 85
|
1975/2003
|
4,000'
|
US GOM
|
LLOG
|
6/25/2010
|
6/24/2011
|
334-336
|
BOP is in the certification process.
|
91
|
1
|
15
|
||||
U.S. Gulf of Mexico Submersibles (2)
|
||||||||||||||||
Noble Joe Alford
|
Pace Marine 85G
|
1982/2006
|
70’-C
|
US GOM
|
Shipyard
|
9/17/2009
|
-
|
Cold Stacked.
|
91
|
1
|
92
|
|||||
Noble Lester Pettus
|
Pace Marine 85G
|
1982/2007
|
70’-C
|
US GOM
|
Shipyard
|
6/10/2009
|
-
|
Cold Stacked.
|
91
|
1
|
92
|
|||||
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
|
Page 1 of 4
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - September 29, 2010
|
.
|
Approximate actual and estimated unpaid down time days *
|
||||||||||||||
RIG
|
RIG DESIGN
|
YEAR BUILT / REBUILT
|
WATER DEPTH
|
LOCATION
|
OPERATOR
|
ESTIMATED CONTRACT START DATE
|
ESTIMATED CONTRACT EXPIRATION DATE
|
FULL CONTRACT DAYRATE ($000)
|
COMMENTS
|
3Q-10
|
3Q-10
|
4Q-10
|
||||
A
|
E
|
E
|
||||||||||||||
Mexico Semisubmersible (1) (c)
|
||||||||||||||||
Noble Max Smith
|
Noble EVA 4000™
|
1980/1999
|
7,000'
|
Bay of Campeche
|
Pemex
|
8/01/2008
|
7/31/2011
|
483-485
|
||||||||
Mexico Jackups (12) (c, d)
|
||||||||||||||||
Noble Bill Jennings
|
MLT Class 84-E.R.C.
|
1975/1997
|
390’-IC
|
Bay of Campeche
|
Pemex
|
6/18/2010
|
11/10/2010
|
94-96
|
Received contract extension.
|
1
|
||||||
Noble Eddie Paul
|
MLT Class 84-E.R.C.
|
1976/1995
|
390’-IC
|
Bay of Campeche
|
Pemex
|
6/04/2010
|
7/31/2010
|
94-96
|
Received a direct assignment.
|
|||||||
Mexico
|
Shipyard
|
8/01/2010
|
-
|
Available.
|
60
|
|||||||||||
Noble Leonard Jones
|
MLT Class 53-E.R.C.
|
1972/1998
|
390’-IC
|
Mexico
|
Shipyard
|
6/23/2010
|
-
|
Available.
|
91
|
|||||||
Noble Johnnie Hoffman
|
Baker Marine BMC 300
|
1976/1993
|
300’-IC
|
Bay of Campeche
|
Pemex
|
4/15/2010
|
7/25/2010
|
84-86
|
Received contract extension.
|
|||||||
Bay of Campeche
|
Pemex
|
7/26/2010
|
10/13/2010
|
74-76
|
Received contract extension.
|
1
|
||||||||||
Noble Gene Rosser
|
Levingston Class 111-C
|
1977/1996
|
300’-IC
|
Bay of Campeche
|
Pemex
|
6/20/2010
|
12/19/2010
|
79-81
|
Received contract extension.
|
1
|
||||||
Noble John Sandifer
|
Levingston Class 111-C
|
1975/1995
|
300’-IC
|
Bay of Campeche
|
Pemex
|
6/17/2010
|
9/18/2010
|
79-81
|
Received contract extension.
|
|||||||
Mexico
|
Shipyard
|
9/19/2010
|
-
|
UWILD inspection, then available
|
12
|
|||||||||||
Noble Lewis Dugger
|
Levingston Class 111-C
|
1977/1997
|
300’-IC
|
Bay of Campeche
|
Pemex
|
5/30/2010
|
10/18/2010
|
79-81
|
Received a direct assignment. We have received a request for an extension of the current direct assignment, which subject to agreement on dayrate, would extend the contract to November 15, 2010.
|
1
|
||||||
Noble Sam Noble
|
Levingston Class 111-C
|
1982
|
300’-IC
|
Bay of Campeche
|
Pemex
|
3/22/2010
|
9/19/2010
|
84-86
|
Received contract extension.
|
|||||||
Mexico
|
Shipyard
|
9/20/2010
|
-
|
UWILD inspection, then available.
|
11
|
|||||||||||
Noble Roy Butler
|
F&G L-780 MOD II
|
1982/1998
|
250’-IC (f)
|
Bay of Campeche
|
Pemex
|
4/24/2010
|
7/30/2010
|
59-61
|
Received contract extension.
|
|||||||
Bay of Campeche
|
Pemex
|
7/31/2010
|
4/09/2011
|
62-64
|
Received contract.
|
22
|
||||||||||
Noble Earl Frederickson
|
MLT Class 82-SD-C
|
1979/1999
|
250’-IC
|
Bay of Campeche
|
Pemex
|
7/13/2010
|
8/25/2010
|
63-65
|
This contract commenced 7/13/2008. The contract reprices every three months based on an index of jackup rates in seven international regions. On 7/13/2010, the contract repriced at a dayrate of $63k-$65k.
|
25
|
||||||
Bay of Campeche
|
Pemex
|
8/26/2010
|
12/31/2010
|
62-64
|
Received contract extension.
|
|||||||||||
Noble Tom Jobe
|
MLT Class 82-SD-C
|
1982
|
250’-IC
|
Bay of Campeche
|
Pemex
|
5/07/2010
|
8/06/2010
|
77-79
|
This contract commenced 8/07/2008. The contract reprices every three months based on an index of jackup rates in seven international regions. On 5/07/2010, the contract repriced at a new dayrate of $77k-$79k.
|
|||||||
Bay of Campeche
|
Pemex
|
8/07/2010
|
12/06/2011
|
82-84
|
On 8/07/2010, the contract repriced at a new dayrate of $82k-$84k. The next date on which the contract is expected to reprice is 11/07/2010.
|
2
|
||||||||||
Noble Carl Norberg
|
MLT Class 82-C
|
1976/2003
|
250'-IC
|
Bay of Campeche
|
Pemex
|
6/02/2010
|
9/01/2010
|
76-78
|
This contract commenced on 3/02/2009. The contract reprices every three months based on an index of jackup rates in seven international regions. On 6/02/2010, the contract repriced at a new dayrate of $76k-$78k.
|
5
|
||||||
9/02/2010
|
3/02/2011
|
80-82
|
On 9/02/2010, the contract repriced at a new dayrate of $80k-$82k. The next date on which the contract is expected to reprice is 12/02/2010.
|
|||||||||||||
Brazil Semisubmersibles (3) (c ) (h)
|
||||||||||||||||
Noble Dave Beard-Newbuild
|
F&G 9500 Enhanced Pacesetter
|
1986/2008
|
10,000'-DP
|
Brazil
|
Petrobras
|
3/19/2010
|
3/18/2015
|
219-221
|
Eligible for a maximum 15% bonus.
|
8
|
||||||
Noble Paul Wolff
|
Noble EVA 4000™
|
1981/1999/2006
|
9,200'-DP
|
Brazil
|
Petrobras
|
11/04/2009
|
11/03/2014
|
427-429
|
Eligible for a maximum 15% performance bonus.
|
2
|
15
|
|||||
Noble Therald Martin (b)
|
Pentagone 85
|
1977/2004
|
4,000'
|
Brazil
|
Petrobras
|
4/11/2007
|
10/17/2010
|
113-115
|
Eligible for a maximum of 15% performance bonus.
|
|||||||
Brazil
|
Petrobras
|
10/18/2010
|
10/17/2015
|
269-271
|
Eligible for a maximum of 10% performance bonus.
|
15
|
||||||||||
Brazil Drillships (3) (c ) (h)
|
||||||||||||||||
Noble Roger Eason (b)
|
NAM Nedlloyd-C
|
1977/2005
|
7,200'-DP
|
Brazil
|
Petrobras
|
3/15/2010
|
2/21/2012
|
346-348
|
Eligible for a maximum of 15% performance bonus.
|
17
|
||||||
Brazil
|
Petrobras
|
2/22/2012
|
10/19/2012
|
89-91
|
Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k.
|
|||||||||||
Brazil
|
Petrobras
|
10/20/2012
|
8/12/2016
|
346-348
|
Eligible for a maximum of 15% performance bonus.
|
|||||||||||
Noble Leo Segerius (b)
|
Gusto Engineering Pelican Class
|
1981/2002
|
5,600’-DP
|
Brazil
|
Petrobras
|
6/30/2009
|
3/07/2011
|
300-302
|
Eligible for a maximum of 15% performance bonus.
|
1
|
||||||
Brazil
|
Petrobras
|
3/08/2011
|
11/03/2011
|
89-91
|
Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k.
|
|||||||||||
Brazil
|
Petrobras
|
11/04/2011
|
1/23/2016
|
300-302
|
Eligible for a maximum of 15% performance bonus.
|
|||||||||||
Noble Muravlenko
|
Gusto Engineering Pelican Class
|
1982/1997
|
4,900’-DP
|
Brazil
|
Petrobras
|
5/10/2009
|
2/11/2013
|
289-291
|
Eligible for a maximum of 15% performance bonus.
|
24
|
||||||
Brazil
|
Petrobras
|
2/12/2013
|
10/10/2013
|
89-91
|
Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k.
|
|||||||||||
Brazil
|
Petrobras
|
10/11/2013
|
8/14/2015
|
289-291
|
Eligible for a maximum of 15% performance bonus.
|
|||||||||||
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
|
Page 2 of 4
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - September 29, 2010
|
.
|
Approximate actual and estimated unpaid down time days *
|
||||||||||||||
RIG
|
RIG DESIGN
|
YEAR BUILT / REBUILT
|
WATER DEPTH
|
LOCATION
|
OPERATOR
|
ESTIMATED CONTRACT START DATE
|
ESTIMATED CONTRACT EXPIRATION DATE
|
FULL CONTRACT DAYRATE ($000)
|
COMMENTS
|
3Q-10
|
3Q-10
|
4Q-10
|
||||
A
|
E
|
E
|
||||||||||||||
North Sea Semisubmersible (1)
|
||||||||||||||||
Noble Ton van Langeveld
|
Offshore Co. SCP III Mark 2
|
1979/2000
|
1,500'
|
United Kingdom
|
Centrica/Maersk
|
6/30/2010
|
9/12/2010
|
246-248
|
||||||||
United Kingdom
|
Shipyard
|
9/13/2010
|
11/14/2010
|
-
|
Anticipate entering the shipyard for +/- 62 days for rig modifications and regulatory inspection.
|
17
|
1
|
44
|
||||||||
United Kingdom
|
Centrica/Maersk
|
11/15/2010
|
7/31/2011
|
246-248
|
Plus five fixed-priced options.
|
|||||||||||
North Sea/Mediterranean Semisubmersible (1)
|
||||||||||||||||
Noble Homer Ferrington
|
F&G 9500 Enhanced Pacesetter
|
1985/2004
|
7,200
|
Libya
|
ExxonMobil
|
4/18/2009
|
4/17/2012
|
536-538
|
We have initiated arbitration proceedings with both ExxonMobil and BP with respect to an assignment of the drilling contract from ExxonMobil to BP. Payment of the dayrate is subject to the resolution to this dispute. The rig has been on standby since April 24, 2010 and continues to be on standby. Pending resolution of this dispute, the Company has been reserving the revenue stream.
|
|||||||
North Sea Jackups (8)
|
||||||||||||||||
Noble Hans Deul
|
F&G JU-2000E
|
2009
|
400'-IC
|
Netherlands
|
Shell
|
2/06/2009
|
2/05/2011
|
127-129
|
||||||||
United Kingdom
|
Shell
|
2/06/2011
|
2/05/2013
|
174-176
|
||||||||||||
Noble Julie Robertson
|
Baker Marine Europe Class
|
1981/2001
|
390'-IC (e)
|
United Kingdom
|
Centrica
|
9/15/2009
|
9/12/2010
|
211-213
|
||||||||
United Kingdom
|
Centrica
|
9/13/2010
|
12/21/2010
|
86-88
|
Received contract extension.
|
|||||||||||
United Kingdom
|
Shipyard
|
12/22/2010
|
3/31/2011
|
-
|
Contract preparations.
|
10
|
||||||||||
United Kingdom
|
Centrica
|
4/01/2011
|
3/31/2012
|
88-90
|
Received letter of intent.
|
|||||||||||
|
||||||||||||||||
Noble Al White
|
CFEM T-2005-C
|
1982/2005
|
360’-IC
|
Netherlands
|
Total
|
12/03/2009
|
6/03/2011
|
111-113
|
Plus a six month priced option.
|
|||||||
Noble Byron Welliver
|
CFEM T-2005-C
|
1982
|
300’-IC
|
United Kingdom
|
ATP
|
3/03/2010
|
12/31/2010
|
85-87
|
||||||||
Noble Lynda Bossler
|
MSC/CJ-46
|
1982
|
250’-IC
|
Netherlands
|
Cirrus Energy
|
4/01/2010
|
9/02/2010
|
88-90
|
||||||||
Netherlands
|
TBA
|
9/03/2010
|
-
|
Available.
|
27
|
|||||||||||
Noble Piet van Ede
|
MSC/CJ-46
|
1982
|
250’-IC
|
Netherlands
|
Gaz de France
|
2/23/2010
|
10/19/2010
|
108-110
|
||||||||
Netherlands
|
Shipyard
|
10/20/2010
|
11/18/2010
|
-
|
Enter the shipyard on 10/20/2010 for estimated 29 days at zero dayrate.
|
29
|
||||||||||
Netherlands
|
Gaz de France
|
11/19/2010
|
11/18/2011
|
85-87
|
||||||||||||
Noble Ronald Hoope
|
MSC/CJ-46
|
1982
|
250’-IC
|
Netherlands
|
Gaz de France
|
2/23/2010
|
10/31/2010
|
92-94
|
Plus two priced option wells; estimated time to complete each well is +/- 60 days.
|
|||||||
Netherlands
|
Gaz de France
|
11/01/2010
|
3/31/2011
|
86-88
|
||||||||||||
Noble George Sauvageau
|
NAM Nedlloyd-C
|
1981
|
250’-IC
|
Netherlands
|
Wintershall
|
1/01/2010
|
12/31/2010
|
117-119
|
||||||||
Netherlands
|
Wintershall
|
1/01/2011
|
12/31/2011
|
91-93
|
||||||||||||
West Africa Drillship (1)
|
||||||||||||||||
Noble Duchess
|
Conversion
|
1975
|
1,500'
|
Nigeria
|
NPDC
|
10/19/2008
|
11/01/2010
|
307-309
|
30
|
|||||||
West Africa Jackups (5) (c )
|
||||||||||||||||
Noble Percy Johns
|
F&G L-780 MOD II
|
1981/1995
|
300’-IC
|
Nigeria
|
ExxonMobil
|
7/01/2010
|
6/30/2012
|
84-86
|
2-years firm plus a 1-year priced option; which is subject to a 240-day notice of cancellation. We anticipate the need to remove the unit from Nigeria in order to apply for a new temporary import permit.
|
3
|
31
|
|||||
Noble Tommy Craighead
|
F&G L-780 MOD II
|
1982/2003
|
300’-IC
|
Cameroon
|
EurOil
|
5/01/2010
|
12/31/2010
|
89-91
|
Received contract for two wells plus two - one well priced options.
|
|||||||
Noble Ed Noble
|
MLT Class 82-SD-C
|
1984/2003
|
250’-IC
|
Nigeria
|
ExxonMobil
|
7/01/2010
|
6/30/2012
|
84-86
|
2-years firm plus a 1-year priced option; which is subject to a 240-day notice of cancellation. We anticipate the need to remove the unit from Nigeria in order to apply for a new temporary import permit.
|
|||||||
Noble Lloyd Noble
|
MLT Class 82-SD-C
|
1983/1990
|
250’-IC
|
Nigeria
|
Amni
|
1/07/2010
|
8/17/2010
|
89-91
|
||||||||
Cameroon
|
Shipyard
|
8/18/2010
|
10/06/2010
|
-
|
Available.
|
42
|
1
|
6
|
||||||||
Nigeria
|
Addax
|
10/07/2010
|
4/05/2011
|
83-85
|
Received letter of intent plus one 6-month option.
|
|||||||||||
Noble Don Walker
|
Baker Marine BMC 150-SD
|
1982/1992
|
150’-IC
|
Cameroon
|
Shipyard
|
3/11/2009
|
-
|
Available.
|
91
|
|||||||
Arabian Gulf Jackups (14) (c )
|
||||||||||||||||
Noble Scott Marks
|
F&G JU-2000E
|
2009
|
400'-IC
|
United Kingdom
|
Centrica
|
9/07/2009
|
12/31/2010
|
212-214
|
||||||||
UAE (Hamriyah)
|
Shipyard
|
1/01/2011
|
6/14/2011
|
-
|
Mobilization and contract preparation.
|
|||||||||||
Saudi Arabia
|
Saudi Aramco
|
6/15/2011
|
6/14/2014
|
236-238
|
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contracted time.
|
|||||||||||
Noble Roger Lewis
|
F&G JU-2000E
|
2007
|
400'-IC
|
UAE (Hamriyah)
|
Shipyard
|
4/28/2010
|
1/14/2011
|
-
|
Installation of leg extensions; upgrading steel, and contract preparation.
|
91
|
1
|
92
|
||||
Saudi Arabia
|
Saudi Aramco
|
1/15/2011
|
1/14/2014
|
131-133
|
Plus lump sum mobilization and capital upgrades. Customer may cancel this contract for convenience with 30 days notice, but must pay a termination fee of 50% of the dayrate for the remaining contracted time.
|
|||||||||||
Noble Jimmy Puckett
|
F&G L-780 MOD II
|
1982/2002
|
300'-IC
|
Qatar
|
RasGas
|
4/05/2010
|
4/04/2012
|
71-73
|
Contract is subject to 120-day notice of cancellation. Plus a two-year priced option. Estimated +/- 14 days of downtime for underwater survey.
|
14
|
||||||
Noble Gus Androes
|
Levingston Class 111-C
|
1982/2004
|
300'-IC
|
Qatar
|
Maersk Oil Qatar
|
8/11/2009
|
12/31/2010
|
49-51
|
Rig substitution for Noble David Tinsley contract; rig to serve as an accommodation.
|
|||||||
Noble Harvey Duhaney
|
Levingston Class 111-C
|
1976/2001
|
300'-IC
|
Qatar
|
Total
|
6/05/2010
|
12/01/2011
|
59-61
|
Contract is subject to a 60-day notice of cancellation.
|
|||||||
Noble Alan Hay
|
Levingston Class 111-C
|
1980/2005
|
300'-IC
|
UAE (Dubai)
|
Dubai Petroleum
|
10/12/2009
|
11/15/2011
|
#
|
Rate withheld at request of operator. Contract is subject to a 90-day notice of cancellation. Entered the shipyard on 5/20/2010 for 98 days at zero dayrate for upgrades and survey; the Noble Roy Rhodes was substituted during this period. The Noble Alan Hay commenced operations and dayrate on 8/28/2010.
|
49
|
||||||
Noble Roy Rhodes
|
MLT Class 116-C
|
1979/2009
|
300’-IC
|
UAE (Dubai)
|
Dubai Petroleum
|
6/23/2010
|
8/28/2010
|
#
|
Rate withheld at request of operator. Rig substitution for the Noble Alan Hay (formerly the Noble Mark Burns).
|
23
|
||||||
Qatar
|
Total E&P Qatar
|
9/20/2010
|
1/19/2011
|
59-61
|
Work over program; plus one 2-month priced option.
|
|||||||||||
Noble Joe Beall
|
Modec 300C-38
|
1981/2004
|
300'-IC
|
Qatar
|
McDermott
|
11/10/2009
|
9/27/2010
|
53-55
|
Accommodation work.
|
|||||||
Qatar
|
McDermott
|
9/28/2010
|
1/06/2011
|
9-11
|
Received letter of intent - standby rate.
|
|||||||||||
Noble David Tinsley
|
Modec 300C-38
|
1981/2004
|
300'-IC
|
UAE (Hamriyah)
|
Shipyard
|
5/09/2009
|
10/15/2010
|
-
|
Estimated timing for leg repair/replacement; then available.
|
91
|
1
|
15
|
||||
Noble Gene House
|
Modec 300C-38
|
1981/1998
|
300'-IC
|
Qatar
|
Maersk Oil Qatar
|
5/21/2009
|
10/30/2010
|
47-49
|
Accommodation work.
|
|||||||
Noble Charles Copeland
|
MLT Class 82-SD-C
|
1979/2001
|
280’-IC
|
UAE (Hamriyah)
|
Shipyard
|
12/01/2009
|
-
|
Available.
|
91
|
|||||||
Noble Chuck Syring
|
MLT Class 82-C
|
1976/1996
|
250’-IC
|
Qatar
|
RasGas
|
2/04/2010
|
2/03/2011
|
47-49
|
Accommodation work. Contract is subject to a 120-day notice of cancellation.
|
|||||||
Dhabi II
|
Baker Marine BMC 150
|
1982/2006
|
150'-IC
|
UAE (Abu Dhabi)
|
ADOC
|
7/15/2008
|
7/14/2011
|
91-93
|
||||||||
Noble Dick Favor
|
Baker Marine BMC 150
|
1982/2004
|
150'-IC
|
UAE (Hamriyah)
|
Shipyard
|
2/18/2010
|
-
|
Available.
|
91
|
|||||||
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
|
Page 3 of 4
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - September 29, 2010
|
.
|
Approximate actual and estimated unpaid down time days *
|
||||||||||||||
RIG
|
RIG DESIGN
|
YEAR BUILT / REBUILT
|
WATER DEPTH
|
LOCATION
|
OPERATOR
|
ESTIMATED CONTRACT START DATE
|
ESTIMATED CONTRACT EXPIRATION DATE
|
FULL CONTRACT DAYRATE ($000)
|
COMMENTS
|
3Q-10
|
3Q-10
|
4Q-10
|
||||
A
|
E
|
E
|
||||||||||||||
India Jackups (4) (c, d)
|
||||||||||||||||
Noble Ed Holt
|
Levingston Class 111-C
|
1981/2003
|
300’-IC
|
India
|
Jindal/ONGC
|
2/23/2010
|
2/22/2015
|
56-58
|
Rig bareboat chartered to Jindal which is contracted with ONGC.
|
|||||||
Noble George McLeod
|
F&G L-780 MOD II
|
1981/1995
|
300’-IC
|
India
|
Jindal/ONGC
|
1/05/2009
|
1/04/2012
|
132-134
|
Rig bareboat chartered to Jindal which is contracted with ONGC.
|
|||||||
Noble Charlie Yester
|
MLT Class 116-C
|
1980
|
300’-IC
|
India
|
Jindal/ONGC
|
6/08/2010
|
6/07/2013
|
49-51
|
Rig bareboat chartered to Jindal which is contracted with ONGC.
|
|||||||
Noble Kenneth Delaney
|
F&G L-780 MOD II
|
1983/1998
|
300'-IC
|
UAE (Hamriyah)
|
Shipyard
|
5/15/2010
|
9/30/2010
|
-
|
Contract preparations and mobilization to India.
|
91
|
1
|
|||||
India
|
Deepwater Drilling/ONGC
|
10/01/2010
|
9/30/2013
|
49-51
|
Rig bareboat chartered to Deepwater Drilling which is contracted with ONGC.
|
|||||||||||
Southeast Asia Drillship (2)
|
||||||||||||||||
Noble Phoenix
|
Gusto Engineering Pelican Class
|
1979/2009
|
5,000' DP
|
Brunei
|
Shell
|
6/27/2010
|
3/15/2011
|
243-245
|
23
|
|||||||
TBA
|
Shell
|
3/16/2011
|
3/15/2014
|
305-307
|
||||||||||||
TBA
|
Shell
|
3/16/2014
|
3/15/2016
|
278-280
|
||||||||||||
Noble Discoverer
|
Arctic Class Hull ICE-05; Sonat Discoverer Class
|
1976/2009
|
1,000'
|
Shipyard
|
Shell
|
7/20/2007
|
11/18/2011
|
158-160
|
Rate is subject to escalation adjustments.
|
|||||||
Far East Drillship (4)
|
||||||||||||||||
Noble Globetrotter I - Newbuild
|
Globetrotter Class
|
2011
|
10,000'-DP
|
Dalian, China - STX / Netherlands - Huisman
|
Shipyard
|
10/14/2011
|
-
|
|||||||||
In-transit & acceptance testing
|
10/15/2011
|
12/31/2011
|
-
|
|||||||||||||
US GOM
|
Shell
|
1/01/2012
|
12/31/2021
|
409-411
|
Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. During the second five years, the unit will earn a dayrate based on a market index and also be eligible for a 15% performance bonus.
|
|||||||||||
Noble Globetrotter II - Newbuild
|
Globetrotter Class
|
2013
|
10,000'-DP
|
Dalian, China - STX / Netherlands - Huisman
|
Shipyard
|
6/01/2013
|
-
|
|||||||||
In-transit & acceptance testing
|
|
6/02/2013
|
10/31/2013
|
-
|
||||||||||||
TBA
|
Shell
|
11/1/2013
|
10/31/2023
|
409-411
|
Contract is at a fixed dayrate the first five years and is eligible for a 15% performance bonus. During the second five years, the unit will earn a dayrate based on a market index and also be eligible for a 15% performance bonus.
|
|||||||||||
Noble Bully I (g) - Newbuild
|
GustoMSC Bully PRD 12000
|
2011
|
8,200'-DP
|
Keppel
|
Shipyard
|
5/20/2011
|
||||||||||
In-transit & acceptance testing
|
|
5/21/2011
|
8/13/2011
|
|||||||||||||
US GOM
|
Shell
|
8/14/2011
|
8/13/2016
|
440-445
|
Plus four 1-year priced options.
|
|||||||||||
Noble Bully II (g) - Newbuild
|
GustoMSC Bully PRD 12000
|
2011
|
8,200'-DP
|
Keppel
|
Shipyard
|
9/30/2011
|
||||||||||
In-transit & acceptance testing
|
10/01/2011
|
12/05/2011
|
||||||||||||||
Brazil
|
Shell
|
12/06/2011
|
12/05/2021
|
440-445
|
Contract is at a fixed dayrate the first five years. During the second five years, the unit will earn a dayrate based on a market index and also be eligible for a 15% performance bonus.
|
|||||||||||
Other (1)
|
||||||||||||||||
Seillean - FPSO
|
A1 Floating Production & Storage Installation LMC, category 2B ship.
|
1989/2008
|
6,500'-DP
|
US GOM
|
BP
|
07/23/2010
|
10/30/2010
|
303-305
|
||||||||
11/01/2010
|
-
|
Available.
|
||||||||||||||
1430
|
9
|
455
|
||||||||||||||
(a)
|
Unit has been upgraded to the NC-5SM mooring standard.
|
|||||||||||||||
(b)
|
Rig utilizes the Aluminum Alloy Riser technology.
|
|||||||||||||||
(c)
|
In various market segments, the Company contracts with certain parties for the provision of certain local services and advice. Compensation paid to such parties by the Company typically is based on a percentage of the drilling contract’s daywork operating rate, and the Company accounts for such payments in its financial statements in the contract drilling services operating costs and expenses line item.
|
2010 Total: (includes: shipyard, stacked, & downtime days.)
|
4168
|
|||||||||||||
(d)
|
Listed rigs are modified bareboat charter; cost structure varies by region.
|
|||||||||||||||
(e)
|
Leg extensions fabricated to enable the rig to operate in up to 390' of water in a non-harsh environment.
|
|||||||||||||||
(f)
|
Rig is currently equipped to operate in 250' of water. Leg extensions fabricated to enable the rig to operate in up to 300' of water.
|
|||||||||||||||
(g)
|
Commitment split 50/50 - Joint Venture between Shell and Noble Corp.
|
|||||||||||||||
(h)
|
The drilling contract provides the client with the right to terminate the contract in the event of excessive downtime.
|
|||||||||||||||
*
|
A = Actual approximate downtime incurred during the quarter indicated as of the report date; E = Estimated additional downtime days expected to occur as of the report date.
|
|||||||||||||||
# =
|
Rate withheld at request of operator.
|
|||||||||||||||
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
|
Page 4 of 4