UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
ý |
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15 (d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
|
|
For the quarterly period ended December 31, 2002 |
|
|
|
OR |
|
|
|
o |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15 (D) OF THE SECURITIES EXCHANGE ACT OF 1934 |
|
|
For the transition period from to |
|
|
|
Commission File Number 2-70145 |
PIONEER DRILLING COMPANY
(Exact name of registrant as specified in its charter)
TEXAS |
|
74-2088619 |
(State or other
jurisdiction |
|
(I.R.S. Employer |
|
|
|
9310 Broadway, Bldg. 1, San Antonio, Texas |
|
78217 |
(Address of principal executive offices) |
|
(Zip Code) |
|
||
210-828-7689 |
||
(Registrants telephone number, including area code) |
(Former name, former address and former fiscal year, if changed since last report)
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes ý No o
Indicate by check mark whether the registrant is an accelerated filer (as defined in Rule 12b-2 of the Exchange Act).
Yes o No ý
As of February 10, 2003, there were 16,367,459 shares of common stock, par value $0.10 per share, of the registrant issued and outstanding.
PART 1. FINANCIAL INFORMATION
ITEM 1. FINANCIAL STATEMENTS
PIONEER DRILLING COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED BALANCE SHEETS
|
|
(Unaudited) |
|
March 31, |
|
||
ASSETS |
|
|
|
|
|
||
Current assets: |
|
|
|
|
|
||
Cash and cash equivalents |
|
$ |
8,315,688 |
|
$ |
5,383,045 |
|
Securities available for sale |
|
|
|
337,309 |
|
||
Receivables, net |
|
5,868,290 |
|
6,160,797 |
|
||
Contract drilling in progress |
|
4,762,252 |
|
3,120,252 |
|
||
Federal income tax receivable |
|
629,218 |
|
880,068 |
|
||
Prepaid expenses |
|
1,449,712 |
|
634,747 |
|
||
Total current assets |
|
21,025,160 |
|
16,516,218 |
|
||
|
|
|
|
|
|
||
Property and equipment, at cost |
|
105,877,554 |
|
80,353,022 |
|
||
Less accumulated depreciation and amortization |
|
19,105,834 |
|
13,621,396 |
|
||
Net property and equipment |
|
86,771,720 |
|
66,731,626 |
|
||
Other assets |
|
374,298 |
|
201,914 |
|
||
Total assets |
|
$ |
108,171,178 |
|
$ |
83,449,758 |
|
|
|
|
|
|
|
||
LIABILITIES AND SHAREHOLDERS EQUITY |
|
|
|
|
|
||
Current liabilities: |
|
|
|
|
|
||
Notes payable |
|
$ |
7,276,765 |
|
$ |
6,329,925 |
|
Current installments of long-term debt and capital lease obligations |
|
2,513,263 |
|
1,945,989 |
|
||
Accounts payable |
|
11,766,530 |
|
6,507,169 |
|
||
Current deferred income taxes |
|
|
|
56,366 |
|
||
Accrued payroll |
|
1,294,861 |
|
792,805 |
|
||
Accrued expenses |
|
1,750,726 |
|
1,185,237 |
|
||
Total current liabilities |
|
24,602,145 |
|
16,817,491 |
|
||
|
|
|
|
|
|
||
Long-term debt and capital lease obligations, less current installments |
|
46,692,586 |
|
26,118,601 |
|
||
Deferred income taxes |
|
6,713,663 |
|
7,170,661 |
|
||
Total liabilities |
|
78,008,394 |
|
50,106,753 |
|
||
|
|
|
|
|
|
||
Shareholders equity: |
|
|
|
|
|
||
Preferred stock, 10,000,000 shares authorized |
|
|
|
|
|
||
Common stock $.10 par value. Authorized 100,000,000 shares, issued 16,167,459 at December 31, 2002 and 15,922,459 shares at March 31, 2002 |
|
1,616,746 |
|
1,592,245 |
|
||
Additional paid-in capital |
|
38,866,020 |
|
38,783,731 |
|
||
Accumulated deficit |
|
(10,319,982 |
) |
(7,142,387 |
) |
||
Accumulated other comprehensive income - Unrealized gain on securities available for sale |
|
|
|
109,416 |
|
||
Total shareholders equity |
|
30,162,784 |
|
33,343,005 |
|
||
Total liabilities and shareholders equity |
|
$ |
108,171,178 |
|
$ |
83,449,758 |
|
See accompanying notes to condensed consolidated financial statements
1
PIONEER DRILLING COMPANY
AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS
(Unaudited)
|
|
Three Months Ended |
|
Nine Months Ended |
|
||||||||
|
|
2002 |
|
2001 |
|
2002 |
|
2001 |
|
||||
Revenues: |
|
|
|
|
|
|
|
|
|
||||
Contract drilling |
|
$ |
19,714,287 |
|
$ |
16,514,838 |
|
$ |
55,112,724 |
|
$ |
52,451,790 |
|
Other |
|
12,310 |
|
24,058 |
|
34,743 |
|
155,598 |
|
||||
Total operating revenues |
|
19,726,597 |
|
16,538,896 |
|
55,147,467 |
|
52,607,388 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Costs and expenses: |
|
|
|
|
|
|
|
|
|
||||
Contract drilling |
|
17,995,124 |
|
12,321,642 |
|
47,741,641 |
|
33,686,284 |
|
||||
Depreciation and amortization |
|
3,006,185 |
|
2,325,366 |
|
8,521,830 |
|
5,892,522 |
|
||||
General and administrative |
|
552,714 |
|
598,609 |
|
1,677,622 |
|
2,211,553 |
|
||||
Bad debt expense |
|
|
|
|
|
110,000 |
|
|
|
||||
Total operating costs and expenses |
|
21,554,023 |
|
15,245,617 |
|
58,051,093 |
|
41,790,359 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Earnings (loss) from operations |
|
(1,827,426 |
) |
1,293,279 |
|
(2,903,626 |
) |
10,817,029 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Other income (expense): |
|
|
|
|
|
|
|
|
|
||||
Interest expense |
|
(673,194 |
) |
(480,506 |
) |
(1,900,116 |
) |
(1,008,033 |
) |
||||
Interest income |
|
19,516 |
|
39,273 |
|
72,912 |
|
59,323 |
|
||||
Gain on sale of marketable securities |
|
|
|
|
|
203,887 |
|
|
|
||||
Total other income (expense) |
|
(653,678 |
) |
(441,233 |
) |
(1,623,317 |
) |
(948,710 |
) |
||||
|
|
|
|
|
|
|
|
|
|
||||
Earnings (loss) before income taxes |
|
(2,481,104 |
) |
852,046 |
|
(4,526,943 |
) |
9,868,319 |
|
||||
Income tax (expense) benefit |
|
777,009 |
|
(300,766 |
) |
1,349,348 |
|
(3,531,229 |
) |
||||
Net earnings (loss) |
|
(1,704,095 |
) |
551,280 |
|
(3,177,595 |
) |
6,337,090 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Preferred stock dividend requirements |
|
|
|
|
|
|
|
92,814 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Net earnings (loss) applicable to common stockholders |
|
$ |
(1,704,095 |
) |
$ |
551,280 |
|
$ |
(3,177,595 |
) |
$ |
6,244,276 |
|
|
|
|
|
|
|
|
|
|
|
||||
Earnings (loss) per common share - Basic |
|
$ |
(0.11 |
) |
$ |
0.03 |
|
$ |
(0.20 |
) |
$ |
0.42 |
|
|
|
|
|
|
|
|
|
|
|
||||
Earnings (loss) per common share - Diluted |
|
$ |
(0.11 |
) |
$ |
0.03 |
|
$ |
(0.20 |
) |
$ |
0.36 |
|
|
|
|
|
|
|
|
|
|
|
||||
Weighted average number of shares outstanding - Basic |
|
16,142,024 |
|
15,919,502 |
|
16,078,277 |
|
14,847,120 |
|
||||
|
|
|
|
|
|
|
|
|
|
||||
Weighted average number of shares outstanding - Diluted |
|
16,142,024 |
|
17,280,475 |
|
16,078,277 |
|
18,309,123 |
|
See accompanying notes to condensed consolidated financial statements.
2
PIONEER DRILLING COMPANY
AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)
|
|
Nine Months Ended December 31, |
|
||||
|
|
2002 |
|
2001 |
|
||
Cash flows from operating activities: |
|
|
|
|
|
||
Net earnings (loss) |
|
$ |
(3,177,595 |
) |
$ |
6,337,090 |
|
Adjustments to reconcile net earnings to net cash provided by (used in) operating activities: |
|
|
|
|
|
||
Depreciation and amortization |
|
8,521,830 |
|
5,892,522 |
|
||
Allowance for doubtful accounts |
|
110,000 |
|
|
|
||
Gain on sales of marketable securities |
|
(203,887 |
) |
|
|
||
Loss (gain) on sales of assets |
|
288,544 |
|
(2,462 |
) |
||
Change in deferred income taxes |
|
(456,998 |
) |
1,175,036 |
|
||
Changes in current assets and liabilities: |
|
|
|
|
|
||
Receivables |
|
182,507 |
|
(4,590,053 |
) |
||
Contract drilling in progress |
|
(1,642,000 |
) |
714,097 |
|
||
Prepaid expenses |
|
(814,964 |
) |
(771,286 |
) |
||
Accounts payable |
|
5,259,361 |
|
(1,536,400 |
) |
||
Federal income tax |
|
250,850 |
|
(1,090 |
) |
||
Prepaid drilling contracts |
|
|
|
417,700 |
|
||
Accrued expenses |
|
1,067,545 |
|
1,684,201 |
|
||
Net cash provided by operating activities |
|
9,385,193 |
|
9,319,355 |
|
||
|
|
|
|
|
|
||
Cash flows from financing activities: |
|
|
|
|
|
||
Proceeds from notes payable |
|
33,484,147 |
|
37,467,888 |
|
||
Payments of debt |
|
(11,396,049 |
) |
(26,268,568 |
) |
||
Increase in other assets |
|
(234,449 |
) |
(15,000 |
) |
||
Proceeds from exercise of options |
|
106,790 |
|
243,474 |
|
||
Proceeds from common stock |
|
|
|
9,048,000 |
|
||
Payments of preferred dividends |
|
|
|
(859,395 |
) |
||
Net cash provided by financing activities |
|
21,960,439 |
|
19,616,399 |
|
||
|
|
|
|
|
|
||
Cash flows from investing activities: |
|
|
|
|
|
||
Purchase of property and equipment |
|
(29,042,533 |
) |
(24,921,631 |
) |
||
Marketable securities sold |
|
375,414 |
|
|
|
||
Proceeds from sale of property and equipment |
|
254,130 |
|
658,201 |
|
||
Net cash used in investing activities |
|
(28,412,989 |
) |
(24,263,430 |
) |
||
|
|
|
|
|
|
||
Net increase (decrease) in cash |
|
2,932,643 |
|
4,672,324 |
|
||
|
|
|
|
|
|
||
Beginning cash and cash equivalents |
|
5,383,045 |
|
2,492,934 |
|
||
Ending cash and cash equivalents |
|
$ |
8,315,688 |
|
$ |
7,165,258 |
|
|
|
|
|
|
|
||
Supplementary Disclosure: |
|
|
|
|
|
||
Interest paid |
|
$ |
1,555,093 |
|
$ |
988,509 |
|
Dividends accrued |
|
|
|
92,814 |
|
||
Conversion of preferred stock |
|
|
|
2,999,994 |
|
||
Income taxes paid (refunded) |
|
(1,143,200 |
) |
2,320,000 |
|
See accompanying notes to condensed consolidated financial statements.
3
PIONEER DRILLING COMPANY AND SUBSIDARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
1. Organization and Basis of Presentation
2. Long-term Debt, Subordinated Debt and Notes Payable
On December 23, 2002, we, borrowed $14,500,000 (the MLC Loan) from Merrill Lynch Capital, a division of Merrill Lynch Business Financial Services, Inc. Under the terms of the MLC Loan, we make monthly interest payments until August 1, 2003, when we begin making equal monthly installment payments of principal of $172,619, plus interest. The unpaid balance of the MLC Loan will be due at maturity on December 22, 2007. Interest accrues at a floating rate equal to the 3 month LIBOR rate plus 385 basis points until our election to convert the interest rate to a fixed rate, at which time interest will accrue at the greater of (1) 6.975%, or (2) the sum of the swap rate published on the Bloomberg Screen USSW on the conversion date plus 367 basis points. The MLC Loan is secured by a first priority security interest in certain of our drilling rigs. We may prepay the MLC Loan at any time in whole, but not in part, subject to certain exceptions and payment of specified prepayment premium requirements. We used $2,130,503 of the proceeds of the Loan to retire all of our outstanding debt to one of our bank lenders, $5,106,321 to make a final payment for the purchase of a newly manufactured, 18,000-foot capacity drilling rig, $7,190,676 to replenish our working capital and $72,500 to pay associated loan fees.
We also have a $1,000,000 line of credit with our primary bank lender. Draws under this line are limited to 75% of eligible accounts receivable less the amount of all outstanding letters of credit issued by the bank for our account. Therefore, if our eligible accounts receivable should fall below $1,333,334 plus any outstanding letters of credit issued by the bank on our behalf, our ability to draw under this line would be reduced. At December 31, 2002, the balance outstanding under this line was $448,475 and eligible accounts receivable were $4,245,534. In addition, our primary bank lender has issued on our behalf three letters of credit totaling $2,000,000 to two workers compensation insurance companies to secure possible future claims under the deductibles on these policies. It is our practice to pay any amounts due under these deductibles as they are incurred. Therefore, we do not anticipate the lender will be required to fund any draws under these letters of credit.
3. Commitments and Contingencies
On May 17, 2002, Deborah Sutton and other working interest owners in a well that we drilled in May 2000 filed an amended petition naming us as a defendant in the 37th Judicial District Court in Bexar County, Texas, Cause No. 2001-CI-06701. Other defendants included: the operator, Sutton Producing Corp.; the casing installer, Jens Oil Field Service, Inc.; the seller of the subject casing and collars, Exploreco, Ltd.; and the casing and collar manufacturer, Baoshan Iron & Steel Corp. Plaintiffs dropped their claims against us on August 8, 2002. However, we remain in the suit because one of the co-defendants, Jens Oil Field Service, Inc., filed a cross-claim against us, alleging it is entitled to contribution or indemnity from us in the event plaintiffs recover against them. Sutton Producing Corp. also filed a cross-claim against us seeking contribution and indemnity; at the same time, however, Sutton Producing Corp. agreed to assume our defense against the claims asserted by Jens Oil Field Service, Inc.
The Plaintiffs seek: the cost of drilling the well, alleged to be in the amount of $828,549; lost production, which as of August 1, 2002 is claimed to be $896,036; the costs of plugging the well, estimated at $20,000; plus reasonable attorneys fees, exemplary damages, prejudgment interest and court costs. The Plaintiffs have alleged that the total sum of all these elements of their damages does not exceed $7,500,000. We deny responsibility and will vigorously defend against any alleged loss sustained by the working interest owners, as we were working in accordance with our contract under the direct control and supervision of the operator, Sutton Producing Corp., at the time of the alleged loss.
5
4. Equity Transactions
5. Earnings (Loss) Per Common Share
|
|
Three Months Ended |
|
Nine Months Ended |
|
||||||||
|
|
2002 |
|
2001 |
|
2002 |
|
2001 |
|
||||
Basic |
|
|
|
|
|
|
|
|
|
||||
Net earnings (loss) |
|
$ |
(1,704,095 |
) |
$ |
551,280 |
|
$ |
(3,177,595 |
) |
$ |
6,337,090 |
|
Less preferred stock dividends |
|
|
|
|
|
|
|
92,814 |
|
||||
Earnings (loss) applicable to common shareholders |
|
$ |
(1,704,095 |
) |
$ |
551,280 |
|
$ |
(3,177,595 |
) |
$ |
6,244,276 |
|
Weighted average shares |
|
16,142,024 |
|
15,919,502 |
|
16,078,277 |
|
14,847,120 |
|
||||
Earnings (loss) per share |
|
$ |
(0.11 |
) |
$ |
0.03 |
|
$ |
(0.20 |
) |
$ |
0.42 |
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
||||
|
|
Three
Months Ended |
|
Nine
Months Ended |
|
||||||||
|
|
2002 |
|
2001 |
|
2002 |
|
2001 |
|
||||
Diluted |
|
|
|
|
|
|
|
|
|
||||
Earnings (loss) applicable to common shareholders |
|
$ |
(1,704,095 |
) |
$ |
551,280 |
|
$ |
(3,177,595 |
) |
$ |
6,244,276 |
|
Effect of dilutive securities: |
|
|
|
|
|
|
|
|
|
||||
Convertible debenture(1) |
|
|
|
|
|
|
|
184,882 |
|
||||
Preferred stock(2) |
|
|
|
|
|
|
|
92,814 |
|
||||
Earnings (loss) available to common shareholders and assumed conversion |
|
$ |
(1,704,095 |
) |
$ |
551,280 |
|
$ |
(3,177,595 |
) |
$ |
6,521,972 |
|
Weighted average shares: |
|
|
|
|
|
|
|
|
|
||||
Outstanding(1) |
|
16,142,024 |
|
15,919,502 |
|
16,078,277 |
|
14,847,120 |
|
||||
Options(1) |
|
|
|
1,360,973 |
|
|
|
1,472,679 |
|
||||
Convertible debenture(1) |
|
|
|
|
|
|
|
1,374,545 |
|
||||
Preferred stock(2) |
|
|
|
|
|
|
|
614,779 |
|
||||
|
|
16,142,024 |
|
17,280,475 |
|
16,078,277 |
|
18,309,123 |
|
||||
Earnings (loss) per share |
|
$ |
(0.11 |
) |
$ |
0.03 |
|
$ |
(0.20 |
) |
$ |
0.36 |
|
(1) If there is no number of shares, the weighted average shares are excluded because of their antidilutive effect for that period. Weighted average number of shares excluded for the three months ended December 31, 2002 and 2001 were 7,609,053 (1,109,053 from options and 6,500,000 from convertible debentures) and 4,108,696 (from convertible debentures), respectively, and 7,101,820 (1,278,183 from options and 5,823,636 from convertible debentures) for the nine months ended December 31, 2002.
(2) There was no preferred stock outstanding during the three months ended December 31, 2002 and 2001 and nine months ended December 31, 2002.
6
ITEM 2. |
|
MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS |
Statements we make in the following discussion which express a belief, expectation or intention, as well as those that are not historical fact, are forward-looking statements that are subject to risks, uncertainties and assumptions. Our actual results, performance or achievements, or industry results, could differ materially from those we express in the following discussion as a result of a variety of factors, including general economic and business conditions and industry trends, the continued strength or weakness of the contract land drilling industry in the geographic areas in which we operate, decisions about onshore exploration and development projects to be made by oil and gas companies, the highly competitive nature of our business, our future financial performance, including availability, terms and deployment of capital, the continued availability of qualified personnel, and changes in, or our failure or inability to comply with, government regulations, including those relating to the environment.
Market Conditions in Our Industry
The United States contract land drilling services industry is highly cyclical. Volatility in oil and gas prices can produce wide swings in the levels of overall drilling activity in the markets we serve and affect the demand for our drilling services and the dayrates we can charge for our rigs. The availability of financing sources, past trends in oil and gas prices and the outlook for future oil and gas prices strongly influence the number of wells oil and gas exploration and production companies decide to drill.
Beginning in 1998 and extending into 1999, the domestic contract land drilling industry was adversely affected by an extended period of low oil and gas prices and a domestic natural gas surplus. The price of West Texas Intermediate crude dropped to a low of $10.76 in December 1998 and the price of natural gas dropped to a low of $1.66 in February 1999. These conditions led to significant reductions in the overall level of domestic land drilling activity, resulting in an historical low domestic land rig count of 393 rigs on April 23, 1999. Prior to this industry downturn, during 1997, the contract land drilling industry experienced a significant level of drilling activity, with a domestic land rig count of 899 rigs on December 26, 1997. Also in 1997, the average price of natural gas delivered at Henry Hub, Louisiana was approximately $2.48 per mmbtu and the average price of West Texas Intermediate crude was approximately $20.59 per barrel.
Oil and natural gas prices rose sharply in calendar year 2000 and through mid-2001. The average price of natural gas for 2000 was $4.32 per mmbtu and for the period from January 1, 2001 through May 31, 2001 was $5.70. The average price of West Texas Intermediate crude for 2000 was $30.38 per barrel and for the period from January 1, 2001 through May 31, 2001 was $28.46. The average prices of natural gas and crude oil for our fiscal year ended March 31, 2002 were $3.00 per mmbtu and $24.00 per barrel, respectively. Natural gas prices began falling in mid-2001 to a low of approximately $2.00 per mmbtu before returning to current levels of between $5.00 and $5.50 per mmbtu. Oil prices are currently in the $30.00 to $33.00 per barrel range.
Primarily as a result of the increase in oil and natural gas prices, exploration and production companies increased their capital spending budgets in 2000 and early 2001. These increased spending budgets increased the demand for contract drilling services. The domestic land rig count climbed to 1,105 on May 31, 2001, representing an increase in the domestic land rig count of 181% from the low in April 1999 and of 23% since December 31, 1997. The decline in oil and natural gas prices from mid-2001 to mid-2002 resulted in a reduction in the demand for contract land drilling services, which resulted in a substantial reduction in the rates land drilling companies have been able to obtain for their services. The Baker Hughes domestic land rig count was 733 on January 24, 2003, a slight increase from 713 on January 25, 2002. While oil and natural gas prices have recovered in recent months, drilling activity has not yet recovered to a level at which we are able to improve our revenue rates and drilling margins.
Critical Accounting Policies and Estimates
Revenue and cost recognition - - We earn our revenues by drilling oil and gas wells for our customers under daywork, turnkey or footage contracts, which usually provide for the drilling of a single well. See Results of Operations below for a general description of these contracts. We recognize revenues on daywork contracts for the days completed based on the dayrate each contract specifies. We recognize revenues from our turnkey and footage contracts on the percentage-ofcompletion method based on our estimate of the number of days to complete each contract. Contract drilling in progress represents revenues we have recognized in excess of amounts billed on
7
contracts in progress. Individual contracts are usually completed in less than 60 days. The risks to us under a turnkey contract, and to a lesser extent under footage contracts, are substantially greater than on a contract drilled on a daywork basis, because we assume most of the risks associated with drilling operations generally assumed by the operator in a daywork contract, including the risks of blowout, loss of hole, stuck drill pipe, machinery breakdowns and abnormal drilling conditions, as well as risks associated with subcontractors services, supplies, cost escalations and personnel operations.
We accrue estimated contract costs on turnkey and footage contracts for each day of work completed based on our estimate of the total cost to complete the contract divided by our estimate of the number of days to complete the contract. Contract costs include labor, materials, supplies, repairs and maintenance and operating overhead allocations. Changes in job performance, job conditions and estimated profitability on uncompleted contracts may result in revisions to costs and income, including losses, which we recognize in the period in which we determine the revisions. In addition, the occurrence of uninsured or under-insured losses or operating cost overruns on our turnkey and footage contracts could have a material adverse effect on our financial position and results of operations. Therefore, our actual results could differ significantly if our cost estimates are later revised from our original estimates.
Asset impairments We assess the impairment of property and equipment whenever events or circumstances indicate that the carrying value may not be recoverable. Factors that we consider important and which could trigger an impairment review would be our customers financial condition and any significant negative industry or economic trends. If a review of our drilling rigs indicates that our carrying value exceeds the estimated undiscounted future cash flows, we are required under applicable accounting standards to write down the drilling equipment to its fair market value.
Deferred taxes We provide deferred taxes for the basis difference in our property and equipment between financial reporting and tax reporting purposes. Basis differences arise from differences in depreciation periods and methods and the value of assets acquired in a business acquisition where we acquire an entity rather than just its assets. For financial reporting purposes we depreciate drilling rigs over 10 to 15 years and refurbishments over three years, while federal income tax rules require that we depreciate drilling rigs and refurbishments over five years. Therefore, in the first five years of our ownership of a drilling rig, our tax depreciation exceeds our financial reporting depreciation, resulting in our providing deferred taxes on this depreciation difference. After five years, financial reporting depreciation exceeds tax depreciation, and the deferred tax liability begins to reverse.
Accounting estimates We consider the recognition of revenues and costs on turnkey and footage contracts critical accounting estimates. On these types of contracts, we are required to estimate the number of days it will require us to complete the contract and our total cost to complete the contract. Our actual costs could substantially exceed our estimated costs if we encounter problems such as lost circulation, stuck drill pipe or an underground blowout subsequent to the release of the financial statements. Revenues and costs during a reporting period could be affected for contracts in progress at the end of that reporting period which have not been completed before our financial statements for that period are released. Turnkey contract revenues accrued in Contract Drilling in Progress at December 31, 2002 were $4,055,202. All but one of our turnkey contracts in progress at December 31, 2002 were completed prior to the release of these financial statements.
We estimate an allowance for doubtful accounts based on the creditworthiness of our customers as well as general economic conditions. Consequently, an adverse change in those factors could affect our estimate of our allowance for doubtful accounts.
Another critical estimate is our determination of the useful lives of our depreciable assets, which directly affects our determination of depreciation expense and deferred taxes. A decrease in the useful life of our drilling equipment would increase depreciation expense and reduce deferred taxes.
Our financial statements include accruals for costs incurred under the $100,000 self-insurance portion of our health insurance and the $250,000 deductible under our workers compensation insurance. These accruals are based on information provided by the insurance companies and our historical experience with these types of insurance costs.
8
Liquidity and Capital Resources
Our cash and cash equivalents at December 31, 2002 were $8,315,688, compared to $5,383,045 at March 31, 2002. Our current ratio, which we calculate by dividing our current assets by our current liabilities, was 0.85 at December 31, 2002 compared to 0.98 at March 31, 2002. Our working capital deficit increased to $3,576,985 at December 31, 2002 from a deficit of $301,273 at March 31, 2002. The principal reason for the change in the deficit is the increase in payables relative to receivables, which reflects the reduced margins we have been receiving on recent contracts due to lower dayrates.
Our accounts payable at December 31, 2002 were $11,766,530, an increase of $5,259,361 from $6,507,169 at March 31, 2002. The increase in accounts payable was primarily the result of an increased level of turnkey contracts during the quarter ended December 31, 2002 compared to the quarter ended March 31, 2002.
Our accounts receivable decreased to $5,868,290 at December 31, 2002 from $6,160,797 at March 31, 2002, and contract drilling in progress increased to $4,762,252 at December 31, 2002 from $3,120,252 at March 31, 2002. The increase in the combination of accounts receivable and contract drilling in progress was due to an increase in the number of turnkey contracts in progress at December 31, 2002 compared to March 31, 2002.
Our cash flows from operating activities for the nine months ended December 31, 2002 were $9,385,193 compared to $9,319,355 for the corresponding period in 2001. Our cash flows from operating activities are affected by a number of factors, including rig utilization rates, the types of contracts we are able to obtain, revenue rates we are able to obtain for our services, collection of receivables and the timing of expenditures.
Since March 31, 2002, the additions to our property and equipment were $29,042,533. Additions consisted of the following:
Drilling rigs (1) |
|
$ |
22,183,843 |
|
Other drilling equipment |
|
6,538,663 |
|
|
Transportation equipment |
|
296,794 |
|
|
Other |
|
23,233 |
|
|
|
|
$ |
29,042,533 |
|
On December 23, 2002, we borrowed $14,500,000 (the MLC Loan) from Merrill Lynch Capital, a division of Merrill Lynch Business Financial Services, Inc. (MLC). Under the terms of the MLC Loan, we make monthly interest payments until August 1, 2003, when we begin making equal monthly installment payments of principal of $172,619, plus interest. The unpaid balance of the MLC Loan will be due at maturity on December 22, 2007. Interest accrues at a floating rate equal to the 3 month LIBOR rate plus 385 basis points until our election to convert the interest rate to a fixed rate, at which time interest will accrue at the greater of (1) 6.975%, or (2) the sum of the swap rate published on the Bloomberg Screen USSW on the conversion date plus 367 basis points. The MLC Loan is secured by a first priority security interest in certain of our drilling rigs. We may prepay the MLC Loan at any time in whole, but not in part, subject to certain exceptions and payment of specified prepayment premium requirements. We used $2,130,503 of the proceeds of the Loan to retire all of our outstanding debt to one of our bank lenders, $5,106,321 to make a final payment for the purchase of a newly manufactured, 18,000-foot capacity drilling rig, $7,190,676 to replenish our working capital and $72,500 to pay associated loan fees.
9
We also have a $1,000,000 line of credit with our primary bank lender. Draws under this line are limited to 75% of eligible accounts receivable less the amount of all outstanding letters of credit issued by the bank on our behalf. Therefore, if our eligible accounts receivable should fall below $1,333,334 plus any outstanding letters of credit issued by the bank on our behalf, our ability to draw under this line would be reduced. At December 31, 2002, the balance outstanding under this line was $448,475 and eligible accounts receivable were $4,245,534. In addition, our primary bank lender has issued on our behalf three letters of credit totaling $2,000,000 to three workers compensation insurance companies to secure possible future claims under the deductibles on these policies. It is our practice to pay any amounts due under these deductibles as they are incurred. Therefore, we do not anticipate the lender will be required to fund any draws under these letters of credit.
Our long-term debt and capital lease obligations maturing each year subsequent to December 31, 2002 are as follows:
|
|
Long term debt |
|
Capital Leases |
|
||
2003 |
|
$ |
2,193,331 |
|
$ |
319,932 |
|
2004 |
|
6,818,333 |
|
139,160 |
|
||
2005 |
|
2,076,603 |
|
69,306 |
|
||
2006 |
|
2,076,961 |
|
23,174 |
|
||
2007 |
|
30,077,344 |
|
|
|
||
After 2007 |
|
5,411,705 |
|
|
|
||
|
|
$ |
48,654,277 |
|
$ |
551,572 |
|
10
Events of default in our loan agreements, which could trigger an early repayment requirement, include among others:
our failure to make required payments;
our failure to comply with financial covenants;
our incurrence of any additional indebtedness in excess of $2,000,000 not already allowed by the loan agreements; and
any payment of cash dividends on our common stock.
On May 28, 2002, we purchased from United Drilling Company and U-D Holdings, L.P. two land drilling rigs, associated spare parts and vehicles for $7,000,000 in cash. We financed the acquisition of those assets with a $7,000,000 loan from our primary bank lender. Interest on the loan was payable monthly at prime. The loan was collateralized by the assets that we purchased and a $7,000,000 letter of credit that WEDGE provided. We repaid this loan on July 3, 2002 with $7,000,000 of the proceeds from the issuance of the subordinated debt as described above.
Results of Operations
We earn our revenues by drilling oil and gas wells. We obtain our contracts for drilling oil and gas wells either through competitive bidding or through direct negotiations with customers. Our drilling contracts generally provide for compensation on either a daywork, turnkey or footage basis. Contract terms we offer generally depend on the complexity and risk of operations, the on-site drilling conditions, the type of equipment used and the anticipated duration of the work to be performed. Generally, our contracts provide for the drilling of a single well.
Daywork Contracts. Under daywork drilling contracts, we provide a drilling rig with required personnel to our customer, who supervises the drilling of the well. We are paid based on a negotiated fixed rate per day while the rig is used. Daywork drilling contracts specify the equipment to be used, the size of the hole and the depth of the well. Under a daywork drilling contract, the customer bears a large portion of out-of-pocket costs of drilling and we generally bear no part of the usual risks associated with drilling, such as time delays and unanticipated costs.
Turnkey Contracts. Under a turnkey contract, we agree to drill a well for our customer to a specified depth and under specified conditions for a fixed price, regardless of the time required or the problems encountered in drilling the well. We provide technical expertise and engineering services, as well as most of the equipment and drilling supplies required to drill the well. We often subcontract for related services, such as the provision of casing crews, cementing and well logging. Under typical turnkey drilling arrangements, we do not receive progress payments and are entitled to be paid by our customer only after we have performed the terms of the drilling contract in full. Turnkey contracts generally afford an opportunity to earn a higher return than would normally be available on daywork contracts if the contract can be completed successfully without complications.
The risks to us under a turnkey contract are substantially greater than on a well drilled on a daywork basis, because we assume most of the risks associated with drilling operations generally assumed by the operator in a daywork contract, including the risks of blowout, loss of hole, stuck drill pipe, machinery breakdowns and abnormal drilling conditions, as well as risks associated with subcontractors services, supplies, cost escalations and personnel. We employ or contract for engineering expertise to analyze seismic, geologic and drilling data to identify and reduce some of the drilling risks assumed by us. We use the results of this analysis to evaluate the risks of a proposed contract and seek to account for such risks in our bid preparation. We believe that our operating experience, qualified drilling personnel, risk management program, internal engineering expertise and access to proficient third- party engineering contractors have allowed us to reduce some of the risks inherent in turnkey drilling operations. We also maintain insurance coverage against some but not all drilling hazards. However, the occurrence of uninsured or under-insured losses or operating cost overruns on our turnkey jobs could have a material adverse effect on our financial position and results of operations.
Footage Contracts. Under footage contracts, we are paid a fixed amount for each foot drilled, regardless of the time required or the problems encountered in drilling the well. We typically pay more of the out-of-pocket costs associated with footage contracts compared with daywork contracts. Similar to a turnkey contract, the risks to us on a footage contract are greater because we assume most of the risks associated with drilling operations generally
11
assumed by the operator in a daywork contract. As with turnkey contracts, we manage these additional risks through the use of engineering expertise and bid the footage contracts accordingly, and we maintain insurance coverage against some but not all drilling hazards. However, the occurrence of uninsured or under-insured losses or operating cost overruns on our footage jobs could have a material adverse effect on our financial position and results of operations.
For the three-month and nine-month periods ended December 31, 2002 and 2001, our rig utilization and revenue days were as follows:
|
|
Three
months ended |
|
Nine
months ended |
|
||||
|
|
2002 |
|
2001 |
|
2002 |
|
2001 |
|
Utilization Rates |
|
76 |
% |
75 |
% |
78 |
% |
89 |
% |
Revenue Days |
|
1,579 |
|
1,304 |
|
4,609 |
|
4,144 |
|
The primary reason for the increase in the number of revenue days in 2002 over 2001 is the increase in size of our rig fleet from 19 at December 31, 2001 to 24 at December 31, 2002.
For the three-month and nine-month periods ended December 31, 2002 and 2001, the percentages of our drilling revenues by type of contract were as follows:
|
|
Three
months ended |
|
Nine
months ended |
|
||||
|
|
2002 |
|
2001 |
|
2002 |
|
2001 |
|
Turnkey Contracts |
|
60 |
% |
12 |
% |
50 |
% |
4 |
% |
Footage Contracts |
|
2 |
% |
0 |
% |
2 |
% |
2 |
% |
Daywork Contracts |
|
38 |
% |
88 |
% |
48 |
% |
94 |
% |
Due to the current reduced demand for drilling rigs, we have returned to bidding on turnkey contracts in an effort to improve margins and rig utilization. In spite of improvements in oil and natural gas prices, we do not see a change in the mix of our type of contracts in the near future.
Our drilling margin decreased to $1,719,163 for our quarter ended December 31, 2002 from $4,193,196 in the corresponding quarter of 2001. The decrease in 2002 from 2001 principally resulted from decreases in rig revenue rates we charged under our daywork drilling contracts. As a percentage of contract drilling revenue, our drilling margin was 9% for the quarter ended December 31, 2002 compared to 25% in the quarter ended December 31, 2001. Because the additional costs associated with turnkey contracts are included in revenues and costs, our drilling costs in 2002 were significantly higher than in 2001 and our drilling margin percentage was significantly lower in 2002 compared to 2001.
Our drilling margin decreased to $7,371,083 for the nine months ended December 31, 2002 from $18,765,506 in the corresponding period of 2001. The decrease in 2002 from 2001 principally resulted from decreases in rig utilization and revenue rates we charged under our daywork drilling contracts. As a percentage of contract drilling revenue, our drilling margin was 13% for the nine months ended December 31, 2002 compared to 36% in the same period of 2001. Because the additional costs associated with turnkey contracts are included in revenues and costs, our drilling costs in 2002 are significantly higher than in 2001 and our drilling margin percentage is significantly lower in 2002 compared to 2001.
Our depreciation and amortization expense in the quarter ended December 31, 2002 increased to $3,006,185 from $2,325,366 in the quarter ended December 31, 2001. Our depreciation and amortization expense in the nine months ended December 31, 2002 increased to $8,521,830 from $5,892,522 in the corresponding period of 2001. The increase in the current periods resulted from our addition of five drilling rigs and related equipment since December 31, 2001.
12
Our general and administrative expenses decreased to $552,714 in the quarter ended December 31, 2002 from $598,609 in the quarter ended December 31, 2001. Our general and administrative expenses decreased to $1,677,622 in the nine months ended December 31, 2002 from $2,211,553 in the corresponding period of 2001. The decreases resulted from reduced payroll costs, legal and professional fees and investor relation costs.
Our contract land drilling operations are subject to various federal and state laws and regulations designed to protect the environment. Maintaining compliance with these regulations is part of our day-to-day operating procedures. We are not aware of any potential clean-up obligations that would have a material adverse effect on our financial condition or results of operations.
Our income tax expense differs from the federal statutory rate of 34% due to permanent differences.
Accounting Matters
In June 2001, the Financial Accounting Standards Board issued Statement of Financial Accounting Standards (SFAS) No. 143, Accounting for Asset Retirement Obligations, which addresses financial accounting and reporting for obligations associated with the retirement of tangible long-lived assets and the associated asset retirement costs. The standard applies to legal obligations associated with the retirement of long-lived assets that result from the acquisition, construction, development and/or normal use of the asset. We are required to adopt the provisions of SFAS No. 143 beginning April 1, 2003. In that connection, we must identify all our legal obligations relating to asset retirements and determine the fair value of these obligations on the date of adoption. We do not expect the adoption of SFAS No. 143 to have a material effect on our financial position or results of operations.
SFAS No. 146, Accounting for Costs Associated with Exit or Disposal Activities, issued in July 2002, addresses financial accounting and reporting for costs associated with exit or disposal activities. SFAS No. 146 requires that a liability be recognized for those costs only when the liability is incurred and can be measured at fair value. This statement nullifies Emerging Issues Task Force Issue No. 94-3, Liability Recognition for Certain Employee Termination Benefits and Other Costs to Exit an Activity, which requires liability recognition for an exit cost when a company commits to an exit plan. SFAS No. 146 is effective for exit or disposal activities that are initiated after December 31, 2002. We will adopt SFAS No. 146 as of January 1, 2003. At this time, we do not believe that the adoption of SFAS No. 146 will have a material effect on our financial position or results of operations.
Inflation
As a result of the relatively low levels of inflation during the past two years, inflation did not significantly affect our results of operations in any of the periods reported.
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
We are subject to market risk exposure related to changes in interest rates on some of our outstanding debt. At December 31, 2002, we had outstanding debt of $26,989,351 that was subject to variable interest rates, in each case based on an agreed percentage-point spread from the lenders prime interest rate. An increase or decrease of 1% in the interest rate would have a corresponding decrease or increase in our net income of approximately $178,000, annually. We did not enter into these debt arrangements for trading purposes.
ITEM 4. CONTROLS AND PROCEDURES
Within the 90-day period immediately preceding the filing of this report, our chief executive officer and chief financial officer have evaluated the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-14(c) and 15d-14(c) under the Securities Exchange Act of 1934). Based on that evaluation, our chief executive officer and chief financial officer concluded that the design and operation of our disclosure controls and procedures were effective as of the date of that evaluation. There have been no significant changes in our internal controls or in other factors that could significantly affect those controls subsequent to the date of that evaluation.
13
PART II. OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
For information regarding litigation involving our company, see Note 3 to the condensed consolidated financial statements in Part I of this report.
ITEM 6. EXHIBITS AND REPORTS ON FORM 8-K
(a) |
|
Exhibits |
|
The following exhibits are filed as part of this report: |
|
|
|
|
|
|
|
3.1* |
|
Articles of Incorporation of Pioneer Drilling Company, as amended. (Form 10-K for the year ended March 31, 2001 (File No. 2-70145, Exhibit 3.1)). |
|
|
|
|
|
|
|
3.2* |
|
Bylaws of Pioneer Drilling Company (Form 10-K for the year ended March 31, 2001 (File No. 2-70145, Exhibit 3.2)). |
|
|
|
|
|
|
|
4.1* |
|
Loan Agreement dated August 11, 2000 between Pioneer Drilling Company and Frost National Bank (Form 10-K for the year ended March 31, 2001 (File No. 2-70145, Exhibit 4.1)). |
|
|
|
|
|
|
|
4.2* |
|
First Amendment to $9,000,000 Loan Agreement dated December 31, 2000 between Pioneer Drilling Company and Frost National Bank. (Form 10-K for the year ended March 31, 2001 ((File No. 2-70145, Exhibit 4.2)). |
|
|
|
|
|
|
|
4.3 |
|
Second Amendment to $9,000,000 Loan Agreement dated July 3, 2002 between Pioneer Drilling Company and Frost National Bank. |
|
|
|
|
|
|
|
4.4* |
|
Third Amendment to $9,000,000 Loan Agreement dated October 31, 2002 between Pioneer Drilling Company and Frost National Bank. (Form 10-Q for quarter ended September 30, 2002. (File No. 2-70145, Exhibit 4.6)). |
|
|
|
|
|
|
|
4.5 |
|
Fourth Amendment to $9,000,000 Loan Agreement dated December 20, 2002 between Pioneer Drilling Company and The Frost National Bank. |
|
|
|
|
|
|
|
4.6* |
|
Loan Agreement dated March 30, 2001 Between Pioneer Drilling Services, Ltd. and The Frost National Bank. (Form 10-K for the year ended March 31, 2001 (File No. 2-70145, Exhibit 4.3)). |
|
|
|
|
|
|
|
4.7* |
|
First Amendment to $6,000,000 Loan Agreement dated March 19, 2002 between Pioneer Drilling Services, Ltd. and Frost National bank. (Form 10-K for the year ended March 31, 2002 (File No. 2-70145, Exhibit 4.11)). |
|
|
|
|
|
|
|
4.8* |
|
Second Amendment to $6,000,000 Loan Agreement dated July 3, 2002 between Pioneer Drilling Services, Ltd. and Frost National Bank. (Form 10-Q for quarter ended September 30, 2002. (File No. 2-70145, Exhibit 4.2)). |
|
|
|
|
|
|
|
4.9* |
|
Third Amendment to $6,000,000 Loan Agreement dated September 29, 2002 between Pioneer Drilling Services, Ltd. and Frost National Bank. (Form 10-Q for quarter ended September 30, 2002. (File No. 2-70145, Exhibit 4.4)). |
|
|
|
|
|
|
|
4.10 |
|
Fourth Amendment to $6,000,000 Loan Agreement dated December 20, 2002 between Pioneer Drilling Services, Ltd. and The Frost National Bank. |
|
|
|
|
|
|
|
4.11 |
|
First Amended and Restated $1,000,000 Loan Agreement dated March 19, 2002 between Pioneer Drilling Services, Ltd. and Frost National Bank |
14
|
|
4.12* |
|
First Amendment to $1,000,000 Loan Agreement dated July 3, 2002 between Pioneer Drilling Company and Frost National Bank (Form 10-Q for quarter ended September 30, 2002. (File No. 2-70145, Exhibit 4.1)). |
|
|
|
|
|
|
|
4.13 |
|
Second First Amendment to the $1,000,000 Loan Agreement dated July 20, 2002 between Pioneer Drilling Services, Ltd. and Frost National Bank. |
|
|
|
|
|
|
|
4.14 |
|
Third Amendment to $1,000,000 Loan Agreement dated December 20, 2002 between Pioneer Drilling Services, Ltd. and The Frost National Bank. |
|
|
|
|
|
|
|
4.15* |
|
Debenture Agreement dated July 3, 2002 by and between WEDGE Energy Services, L.L.C. and Pioneer Drilling Company (Form 8-K filed July 18, 2002 (File No. 2-70145, Exhibit 4.1)). |
|
|
|
|
|
|
|
4.16* |
|
Debenture Purchase Agreement dated July 3, 2002 by and between WEDGE Energy Services, L.L.C. and Pioneer Drilling Company (Form 8-K filed July 18, 2002(File No. 2-70145, Exhibit 4.2)). |
|
|
|
|
|
|
|
4.17* |
|
Subordination Agreement dated July 3, 2002 by and between The Frost National Bank, WEDGE Energy Services, L.L.C., Pioneer Drilling Company and Pioneer Drilling Services, Ltd. (Form 8-K filed July 18, 2002 (File No. 2-70145, Exhibit 4.3)). |
|
|
|
|
|
|
|
4.18 |
|
First Amendment to Debenture Purchase Agreement dated December 23, 2002 between WEDGE Energy Services, L.L.C., and Pioneer Drilling Company. |
|
|
|
|
|
|
|
4.19 |
|
First Amendment to Debenture Agreement dated December 23, 2002 between William H. White and Pioneer Drilling Company. |
|
|
|
|
|
|
|
4.20* |
|
Term Loan and Security Agreement dated December 23, 2002 by and between Pioneer Drilling Services, Ltd. and Merrill Lynch Capital, a division of Merrill Lynch Business Financial Services, Inc. (Form 8-K filed January 3, 2003 (File No. 2-70145, Exhibit 5.1)). |
|
|
|
|
|
|
|
4.21* |
|
Collateral Installment Note dated December 23, 2002 by and between Pioneer Drilling Services, Ltd. and Merrill Lynch Capital, a division of Merrill Lynch Business Financial Services, Inc. (Form 8-K filed January 3, 2003 (File No. 2-70145, Exhibit 5.2)). |
|
|
|
|
|
|
|
* |
|
Incorporated by reference to the filing indicated. |
|
|
|
|
|
|
|
(b) |
|
Reports on Form 8-K. |
None |
||
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
|
PIONEER DRILLING COMPANY |
||
|
|
||
|
|
||
|
/s/ Wm. Stacy Locke |
|
|
|
Wm. Stacy Locke |
||
|
President and Chief Financial Officer |
||
|
(Principal
Financial Officer and Duly Authorized |
||
|
|
||
Dated: |
February 10, 2003 |
|
|
15
CERTIFICATIONS
I, Michael E. Little, chief executive officer of Pioneer Drilling Company, certify that:
1. I have reviewed this quarterly report on Form 10-Q of Pioneer Drilling Company;
2. Based on my knowledge, this quarterly report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this quarterly report;
3. Based on my knowledge, the financial statements, and other financial information included in this quarterly report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this quarterly report;
4. The registrants other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-14 and 15d-14) for the registrant and we have:
a) designed such disclosure controls and procedures to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this quarterly report is being prepared;
b) evaluated the effectiveness of the registrants disclosure controls and procedures as of a date within 90 days prior to the filing date of this quarterly report (the Evaluation Date); and
c) presented in this quarterly report our conclusions about the effectiveness of the disclosure controls and procedures based on our evaluation as of the Evaluation Date;
5. The registrants other certifying officers and I have disclosed, based on our most recent evaluation, to the registrants auditors and the audit committee of the registrants board of directors (or persons performing the equivalent function):
a) all significant deficiencies in the design or operation of internal controls which could adversely affect the registrants ability to record, process, summarize and report financial data and have identified for the registrants auditors any material weaknesses in internal controls; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrants internal controls; and
6. The registrants other certifying officers and I have indicated in this quarterly report whether or not there were significant changes in internal controls or in other factors that could significantly affect internal controls subsequent to the date of our most recent evaluation, including any corrective actions with regard to significant deficiencies and material weaknesses.
February 10 , 2003 |
|
|
|
|
|
|
|
|
|
/s/ Michael E. Little |
|
|
Michael E. Little |
|
|
Chief Executive Officer |
16
I, Wm. Stacy Locke, president and chief financial officer of Pioneer Drilling Company, certify that:
1. I have reviewed this quarterly report on Form 10-Q of Pioneer Drilling Company;
2. Based on my knowledge, this quarterly report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this quarterly report;
3. Based on my knowledge, the financial statements, and other financial information included in this quarterly report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this quarterly report;
4. The registrants other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-14 and 15d-14) for the registrant and we have:
a) designed such disclosure controls and procedures to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this quarterly report is being prepared;
b) evaluated the effectiveness of the registrants disclosure controls and procedures as of a date within 90 days prior to the filing date of this quarterly report (the Evaluation Date); and
c) presented in this quarterly report our conclusions about the effectiveness of the disclosure controls and procedures based on our evaluation as of the Evaluation Date;
5. The registrants other certifying officers and I have disclosed, based on our most recent evaluation, to the registrants auditors and the audit committee of the registrants board of directors (or persons performing the equivalent function):
a) all significant deficiencies in the design or operation of internal controls which could adversely affect the registrants ability to record, process, summarize and report financial data and have identified for the registrants auditors any material weaknesses in internal controls; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrants internal controls; and
6. The registrants other certifying officers and I have indicated in this quarterly report whether or not there were significant changes in internal controls or in other factors that could significantly affect internal controls subsequent to the date of our most recent evaluation, including any corrective actions with regard to significant deficiencies and material weaknesses.
February 10, 2003 |
|
|
|
|
|
|
/s/ Wm. Stacy Locke |
|
|
Wm. Stacy Locke |
|
|
President and Chief Financial Officer |
17
Certification
Pursuant to
Section 906 of the Sarbanes-Oxley Act of 2002
(Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States
Code)
Pursuant to section 906 of the Sarbanes-Oxley Act of 2002 (Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States Code), I, Wm. Stacy Locke, President and Chief Financial Officer of Pioneer Drilling Company, a Texas corporation (the Company), hereby certify, to my knowledge, that:
(1) the Companys Quarterly Report on Form 10-Q for the quarter ended December 31, 2002 (the Report) fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) the information contained in the Report fairly presents, in all material respects, the financial condition and result of operations of the Company.
Dated: |
February 10, 2003 |
/s/ Wm Stacy Locke |
|
|
|
Wm. Stacy Locke |
|
|
|
President and Chief Financial Officer |
The foregoing certification is being furnished solely pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States Code) and is not being filed as part of the Report or as a separate disclosure document.
18
Certification
Pursuant to
Section 906 of the Sarbanes-Oxley Act of 2002
(Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States
Code)
Pursuant to section 906 of the Sarbanes-Oxley Act of 2002 (Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States Code), I, Michael E. Little, Chairman of the Board and Chief Executive Officer of Pioneer Drilling Company, a Texas corporation (the Company), hereby certify, to my knowledge, that:
(1) the Companys Quarterly Report on Form 10-Q for the quarter ended December 31, 2002 (the Report) fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) the information contained in the Report fairly presents, in all material respects, the financial condition and result of operations of the Company.
Dated: |
February 10, 2003 |
/s/ Michael E. Little |
|
|
|
Michael E. Little |
|
|
|
Chairman of the Board and Chief Executive Officer |
The foregoing certification is being furnished solely pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (Subsections (a) and (b) of Section 1350, Chapter 63 of Title 18, United States Code) and is not being filed as part of the Report or as a separate disclosure document.
19